Iron Mountain Phoenix

Login to Add Favorite Login to
Site: Iron Mountain Phoenix

Company: Iron Mountain
Metro: Phoenix
State: Arizona
Country: United States
Region: North America
Region: Americas
Address:
Utility Provider: Arizona Public Service
Total Building SqFt: 588,000
Total Office SqFt: 63,413
Gross SqFt: 319,108
Usable SqFt: 150,000
Total Power: 38.0 Megawatts

Iron Mountain acquired the site in January 2018 in a $1.34 Billion acquisition of IO Datacenter's operations in the United States which included 4 sites (Phoenix, Scottsdale, Edison New Jersey, and Columbus Ohio)

Data Center Design:

  • Located in the heart of Phoenix
  • 41-acre Iron Mountain Hyperscale-Ready campus
  • 588,000 gross square feet
  • 32 MW – redundant feeds
  • Raised-floor and modular data centers
  • HPC ready with high-density racks, MOD’s
  • Multiple infrastructure configurations available
  • PUE as low as 1.2 for reduced waste, OPEX
  • Customer office space available, ample secure parking
  • Easy, direct load-in with short path to data halls, MOD’s, wide hallways, and tall ceilings

Carrier Neutral access to Network Providers:


360
AT&T
BT Americas
CenturyLink
Cable One
Cogent
Cox
Govnet
Hibernia
IIX Peering,
Integra
Internap
Level(3),
Limelight
SRP Telecom
Teliasonera
tw telecom
UNSi
Verizon
Western Wimax
Wydebeam Wireless
XO
Zayo

Map and Nearby Locations:

615 North 48th Street, Phoenix, AZ 85008

SITES within 15 miles of Iron Mountain Phoenix

Show SqM



Distance Site name SqFt MW
0.00 miles SingleHop Phoenix 1.80
0.00 miles redIT Phoenix
1.17 miles QTS Phoenix
2.37 miles XO Phoenix 3930 Watkins
3.26 miles PhoenixNAP-Phoenix
3.26 miles Cyxtera Phoenix PH1 45,000 11.00
3.97 miles Windstream Phoenix 4,400
4.10 miles OneNeck Phoenix 2 6,000 1.50
4.11 miles EdgeConneX Phoenix 1.50
4.15 miles Level3 (was GX) Phoenix 5,900
An illustration of Iron Mountain's new Phoenix data center, which will feature 48MW of capacity in two phases. First 24 MW is scheduled to be delivered in June 2019
The expansion lot for Iron Mountain Phoenix campus is marked with a red box. IO Data Centers LLC originally acquired the land in 2016 for $8.55 million.

An illustration of Iron Mountain's new Phoenix data center, which will feature 48MW of capacity in two phases. First 24 MW is scheduled to be delivered in June 2019
Rendering of the Expansion building that is adjacent to Iron Mountain's existing facility

An illustration of Iron Mountain's new Phoenix data center, which will feature 48MW of capacity in two phases. First 24 MW is scheduled to be delivered in June 2019

The expansion lot for Iron Mountain Phoenix campus is marked with a red box. IO Data Centers LLC originally acquired the land in 2016 for $8.55 million.
Expansion

The expansion lot for Iron Mountain Phoenix campus is marked with a red box. IO Data Centers LLC originally acquired the land in 2016 for $8.55 million.

Entrance to Original Data Center

July 2019

AZP-1 Data Sheet (PDF)