Site: Iron Mountain Phoenix

Company: Iron Mountain
Metro: Phoenix
State: Arizona
Country: United States
Region: North America
Region: Americas
Region: World
Address:
615 North 48th Street

Utility Provider: Arizona Public Service
Total Building SqFt: 588,000
Total Office SqFt: 63,413
Gross SqFt: 319,108
Usable SqFt: 150,000
Total Power: ??? NN
Interested in this information? Contact us
Megawatts

Iron Mountain acquired the site in January 2018 in a $1.34 Billion acquisition of IO Datacenter's operations in the United States which included 4 sites (Phoenix, Scottsdale, Edison New Jersey, and Columbus Ohio)

Data Center Design:

  • Located in the heart of Phoenix
  • 41-acre Iron Mountain Hyperscale-Ready campus
  • 588,000 gross square feet
  • 32 MW – redundant feeds
  • Raised-floor and modular data centers
  • HPC ready with high-density racks, MOD’s
  • Multiple infrastructure configurations available
  • PUE as low as 1.2 for reduced waste, OPEX
  • Customer office space available, ample secure parking
  • Easy, direct load-in with short path to data halls, MOD’s, wide hallways, and tall ceilings

Carrier Neutral access to Network Providers:


360
AT&T
BT Americas
CenturyLink
Cable One
Cogent
Cox
Govnet
Hibernia
IIX Peering,
Integra
Internap
Level(3),
Limelight
SRP Telecom
Teliasonera
tw telecom
UNSi
Verizon
Western Wimax
Wydebeam Wireless
XO
Zayo

Map and Nearby Locations:

615 North 48th Street

SITES within 15 miles of Iron Mountain Phoenix

Show SqM



Distance Site name SqFt MW
0.00 miles SingleHop Phoenix 2
0.00 miles redIT Phoenix
1.20 miles QTS Phoenix
1.23 miles STACK Phoenix PHX02 Campus
2.37 miles XO: 3930 Watkins
3.26 miles Cyxtera Phoenix PH1 45,000 11
3.26 miles PhoenixNAP-Phoenix 6
3.97 miles Windstream Phoenix 4,400
4.10 miles OneNeck Phoenix 2 6,000 2
4.11 miles EdgeConneX Phoenix 2
An illustration of Iron Mountain's new Phoenix data center, which will feature 48MW of capacity in two phases. First 24 MW is scheduled to be delivered in June 2019
The expansion lot for Iron Mountain Phoenix campus is marked with a red box. IO Data Centers LLC originally acquired the land in 2016 for $8.55 million.

An illustration of Iron Mountain's new Phoenix data center, which will feature 48MW of capacity in two phases. First 24 MW is scheduled to be delivered in June 2019
Rendering of the Expansion building that is adjacent to Iron Mountain's existing facility

An illustration of Iron Mountain's new Phoenix data center, which will feature 48MW of capacity in two phases. First 24 MW is scheduled to be delivered in June 2019

The expansion lot for Iron Mountain Phoenix campus is marked with a red box. IO Data Centers LLC originally acquired the land in 2016 for $8.55 million.
Expansion

The expansion lot for Iron Mountain Phoenix campus is marked with a red box. IO Data Centers LLC originally acquired the land in 2016 for $8.55 million.

Entrance to Original Data Center

July 2019

AZP-1 Data Sheet (PDF)