800N 40th St
Under Construction
New facility under construction
Operated by:

STACK Phoenix PHX02 Campus

Short Code: PHX02A
Year Planned: 2027
Utility Provider: Arizona Public Service
Lot Size: 50 acres

STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. This massively scalable 50-acre campus will be developed to support the increasing demand for critical capacity in this rapidly growing data center market.

The more than 1.7 million square foot campus will include a low water use design that supports client sustainability targets and offers the flexibility that hyperscale, cloud, and large enterprise companies need in today’s market. The campus will also feature a dedicated onsite substation to power the future campus and will run on 100% renewable energy.

Map and Nearby Locations:

800N 40th St
STACK INFRASTRUCTURE Sites
Nearby Facilities

Sites within 15 miles of STACK Phoenix PHX02 Campus

Distance Site About
0.07 miles Stack: PHX02B
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
0.17 miles Stack: PHX02D
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
0.22 miles Stack: PHX02E
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
0.22 miles Stack: PHX02C
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
0.37 miles QTS: PHX2 DC2
PHX2 DC2 data center building will be a part of QTS' Phoenix Campus.
0.38 miles QTS: Phoenix II Campus
QTS Phoenix Data Center Campus (PHX II) sits on an 85-acre site with 5 data center buildings.
0.47 miles QTS: PHX2 DC3
PHX2 DC3 data center building is a part of QTS' Phoenix Campus.
0.57 miles QTS: PHX2 DC4
PHX2 DC4 data center building is a part of QTS' Phoenix Campus.
0.65 miles QTS: PHX2 DC5
PHX2 DC5 data center building is a part of QTS' Phoenix Campus. QTS broke ground on this data center in 2023.
1.27 miles Centersquare: Phoenix PH1
1.27 miles Iron Mountain: AZP2
In 2019, Iron Mountain completed the first phase of AZP-2 in Phoenix.
1.33 miles Iron Mountain Phoenix
Iron Mountain acquired the site in January 2018 in a $1.34 Billion acquisition of IO Datacenter's operations in the United States which included 4 sites (Phoenix, Scottsdale, Edison New Jersey, and Columbus Ohio) 41-acre Iron Mountain Hyperscale-Ready campus 588,000 gross square feet 32 MW – redundant feeds
1.33 miles Internap Phoenix
1.37 miles DataBank PHX2
1.56 miles Iron Mountain: AZP3
Iron Mountain has commenced construction of the AZP-3 data center and aims to launch the first phase in Q4 2025.
2.14 miles Verizon: 3930 Watkins
This facility is a former XO Communications site. In 2017, Verizon completed the $1.8 billion acquisition of XO Communications' fiber-optic network business.
2.72 miles Windstream Phoenix
Located in Phoenix, Arizona, this 4,400 square foot Phoenix data center is designed to serve the businesses in the Southwest. The facility was previously a PAETEC data center.
2.80 miles PhoenixNAP-Phoenix
PhoenixNAP is a local provider which operates the data center campus, located east of downtown near Phoenix Sky Harbor International Airport.
2.87 miles PhoenixNAP: PHX02
PhoenixNAP will expand its Phoenix data center campus with a second building, PHX02, slated for construction in late 2025.
2.90 miles Lumen Phoenix 1
3.41 miles GoDaddy: Gilbert, AZ
GoDaddy’s own data center in Phoenix is more than 270,000 square feet in size. The data center features
eight data halls, 11 diesel backup generators, room for eight more pods.
4.19 miles 120 E Van Buren - Digital Realty
120 E Van Buren is Phoenix's carrier hotel and the building is the best connected in Phoenix. The building is also home to many colocation operators including AIS, QTS, Sungard, XO
4.19 miles LightEdge: Phoenix Van Buren
4.19 miles QTS Phoenix Van Buren
QTS acquired this site via the Carpathia acquisition in 2015.
4.34 miles 5CDC: Phoenix PHX01
5C Data Centers is building a data center campus in Arizona. The first facility at the site, PHX01, is scheduled to go live in 2025.
4.46 miles Lumen Phoenix 2
4.51 miles EdgeConneX Phoenix
4.74 miles Metrobloks: Phoenix PHX-A1
Metrobloks is developing an AI-ready, scalable, and sustainable data center in the heart of downtown Phoenix, with live capacity scheduled for Q2 2027.
4.77 miles DataBank Phoenix PHX1
4.86 miles eBay Arizona
eBay's data center is also known as Project Mercury.
7.29 miles Liquid Web Phoenix
8.44 miles Centersquare: PHX1
Centersquare's Phoenix Mesa is cloud-enabled data center located just 10 miles from Phoenix Sky Harbor Airport, with more than 154,000 sq. ft. of space.
9.54 miles 2055 E Technology - Digital Realty
Located in the Arizona State University Research Park and downtown Phoenix Central Business District, the facility was redeveloped in 2007. Digital Realty's 76,000 square foot data center at 2055 E. Technology Circle is approximately 15 miles away from downtown Phoenix. The building is SOC2 certified with 24/7 security and critical facilities management.
9.67 miles 2010 East Centennial
Digital Realty sold the office & data center building in 2018 to an unnamed company. We believe Fox Sports is the tenant.
9.99 miles Expedient Phoenix
In 2021, Five 9s Digital acquired the 46,000 sq ft data center located at 2475 West Townley Avenue in Phoenix, Arizona, which was previously owned by Blue Cross Shield, and subsequently leased it to Expedient.
9.99 miles Five 9s: Blue Shield Phoenix
In 2021, Five 9s Digital acquired the 45,000 sq ft data center located at 2475 West Townley Avenue in Phoenix, Arizona, which was previously owned by Blue Cross Shield.
10.01 miles Menlo: MD-PX1 Bldg4
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
10.02 miles Menlo: MD-PX1 Bldg5
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
10.08 miles Menlo: MD-PX1 Bldg2
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
10.10 miles Menlo: MD-PX1 Bldg3
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
10.14 miles Menlo: MD-PX1 (Phoenix)
Menlo Digital's MD-PX1 (Phoenix) data center campus consists of five buildings on 38 acres. The campus will span 1,022,400 square feet.
12.13 miles US Signal Phoenix AZ01
12.52 miles Internap Phoenix 2500 W Frye Rd
American cloud and colocation provider Internap (INAP) has taken a master lease in a 150,000 square foot data center in Chandler, near Phoenix, Arizona.
12.55 miles Lincoln: Chandler, AZ
Real estate firm Lincoln Property Company reacquired its data center in Phoenix, Arizona, in 2025.
12.62 miles Lincoln: Chandler Bldg-2
Lincoln Property's three-story, 243,000 sq ft expansion building is part of a future development plan that was approved by the City of Chandler under the previous owner.
13.08 miles Hyperscale Data Center Request Dataset
Amazon Data Services has acquired land for a potential data center campus in Laveen, Phoenix. The 220-acre site, located near Loop 202 and Dobbins Road, was purchased for $277 million ($1.2 million per acre).
13.09 miles 11:11 Systems: Scottsdale
The 11:11 Systems Scottsdale data center, originally operated by Sungard Availability Services, was acquired by 11:11 Systems in November 2022.
13.85 miles 1900 S Price - Digital Realty
The Building is 1 story Flood Zone: Zone X Seismic Zone: Zone 1
13.97 miles H5 Phoenix
H5 acquired the site when it bought NextFort in January 2016H5 acquired the site when it bought NextFort in January 20
14.04 miles 2121 S Price - Digital Realty
In 2010, DRT acquired this site from 365 Main portfolio.
14.25 miles CyrusOne PHX9
14.30 miles CyrusOne PHX10
14.35 miles Centersquare: Phoenix PH2
14.36 miles CyrusOne PHX2
14.37 miles LexisNexis Scottsdale
14.37 miles Iron Mountain Scottsdale
Arizona Public Service, the electric utility provider, serves the site with 24MW of utility power
14.39 miles CyrusOne PHX3
14.39 miles Aligned: PHX-04
Aligned Energy's PHX04 site is located at the NEC of Price Road and Innovation Street. The data center spans 396,343 sqft.
14.44 miles Aligned: Peoria Logistics Park
Aligned Data Centers firm acquired nearly 80 acres at the Peoria Logistics Park for $43.2 million in Peoria.
14.45 miles CyrusOne Chandler Phoenix Campus
CyrusOne plans to build nearly 2 million square-feet data center campus. There are two buildings on the campus currently
14.46 miles CyrusOne PHX1
14.52 miles CyrusOne PHX5
14.57 miles CyrusOne PHX4
14.59 miles Aligned: PHX-06
PHX06 is a two-phase development that will total 456,946 SqFt
14.63 miles CyrusOne PHX6
14.64 miles DataCanopy: Phoenix, AZ
14.67 miles CyrusOne PHX8
14.73 miles CyrusOne PHX7
15.44 miles Aligned Phoenix
Aligned's PHX-01/02/03 data center campus in Union Hills, Phoenix, AZ, spans 550,000 sq ft with 180 MW of capacity.
15.44 miles Evocative: PHX1
16.20 miles Aligned: PHX-08
In September 2022, Aligned acquired a pair of adjacent Deer Valley office buildings at 3151 and 3202 W. Behrend Drive from Griffin Realty Trust.
16.26 miles Aligned: PHX-09
In September 2022, Aligned acquired a pair of adjacent Deer Valley office buildings at 3151 and 3202 W. Behrend Drive from Griffin Realty Trust.
16.44 miles 20435 N 26th
16.55 miles NexusTek Phoenix
NexusTek Acquired Phoenix-based CyberTrails in 2017.
16.79 miles Flexential Phoenix Deer Valley
Flexential's Phoenix site is former ViaWest. A and B source power circuit delivery capabilities Multiple medium voltage utility power feeds
18.01 miles Prime: PHX01-05
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
18.08 miles Prime: PHX01-04
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
18.13 miles Prime: PHX01-03
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
18.21 miles Prime: PHX01-02
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
18.23 miles QTS: Hermosa Ranch
US data center firm QTS has acquired 206 acres in the West Valley for $246.8 million in an all-cash deal in July, 2024 from TGV Investments LLC.
18.27 miles Prime Phoenix
The Phoenix Campus is expected to be 1.3 million square feet across 5 data center buildings. The first data center is expected to be completed by Q3 2025 and total 260,400 square feet.
19.84 miles Hyperscale Data Center Request Dataset

STACK Phoenix PHX02 Campus Data Center Photos (See all)

Campus layout for Stack Infrastructure's 5 building campus near Phoenix Sky Harbor International Airport
Source: STACK Infrastructure

Operating Company

Operated by:

STACK Infrastructure is a privately held platform sponsored by IPI Partners that focuses on large scale wholesale capacity and campus development for hyperscale and enterprise customers.

The company was launched in 2019 when IPI combined the remaining Infomart Data Centers assets with selected T5 Data Centers facilities, and industry coverage at launch cited eight data centers across six U.S. markets totaling about 100 MW. In March 2022,

IPI unified DigiPlex in the Nordics and SUPERNAP Italia in Milan under the STACK brand to form STACK EMEA, expanding the platform across Europe. STACK has since added international sites, including the first phase of a 56 MW campus in Toronto and its first Australian data center in Melbourne. Core services referenced by the company and trade press include wholesale colocation, build to suit, and powered shell solutions.

STACK Infrastructure History:

  • 2023: Opened the first Australian data center in Melbourne on a multi-building campus.
  • 2023: Delivered the first 8 MW phase of a planned 56 MW campus in Toronto.
  • 2022: Rebranded DigiPlex (Nordics) and SUPERNAP Italia (Milan) as STACK EMEA.
  • 2019: IPI Partners launched STACK Infrastructure by combining the three Infomart Data Centers sites with selected T5 Data Centers assets. The company was rebranded as STACK INFRASTRUCTURE
  • 2018: ASB Real Estate Investments sold the three remaining Infomart Data Centers facilities in San Jose, Hillsboro, and Ashburn to IPI Partners; the Dallas Infomart carrier hotel was sold separately to Equinix earlier that year.
  • 2014: Acquired a facility in Ashburn that had been owned by AOL.
  • 2014: ASB Real Estate Fund, a subsidiary of DCI Technology Holdings, merged Infomart with Fortune Data Centers. The combined company was renamed to Infomart Data Centers.
  • 2012: Expanded to Oregon with a building in Hillsboro
  • 2007: John Sheputis purchased first Fortune Data Center in San Jose, CA, backed by ASB Real Estate
  • 2006: ASB Real Estate purchased Infomart Dallas building
  • 2006: Fortune Founded as Fortune Data Centers
118
Facilities
8
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?