0.42 miles
|
PointOne: Charles City RIC2
|
RIC2 is the second Phase 1 building on PointOne's planned Charles City campus, a 338,328 sq ft data center east of Roxbury Road.
|
|
0.46 miles
|
PointOne: Charles City RIC1
|
RIC1 is the first Phase 1 building on PointOne's Charles City campus, a planned 424,080 sq ft data center east of Roxbury Road.
|
|
0.75 miles
|
Diode: Roxbury Technology Park
|
Diode Ventures withdrew its plan for the Roxbury Technology Park, a 515-acre data center campus near Richmond, Virginia.
|
|
4.18 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
QTS Richmond 4 (RIC4) Campus is a major data center expansion project by QTS, in eastern Henrico County (Sandston, VA), within the White Oak Technology Park area.
|
|
4.25 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
This facility is part of the QTS Richmond IV Campus in Virginia.
|
|
4.35 miles
|
HubInterested in this information?Contact us
|
Facebook data center campus in the White Oak Technology Park will use solar power and 100 percent renewable energy.
|
|
4.35 miles
|
Prime RidgeInterested in this information?Contact us
|
Facebook data center campus in the White Oak Technology Park will use solar power and 100 percent renewable energy.
|
|
4.42 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
This facility is part of the QTS Richmond IV Campus in Virginia.
|
|
4.44 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
This facility is part of the QTS Richmond IV Campus in Virginia.
|
|
4.64 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
This facility is part of the QTS Richmond IV Campus in Virginia.
|
|
4.67 miles
|
NorthInterested in this information?Contact us
|
Facebook, is looking to expand its data center campus outside Richmond, Virginia.
|
|
4.67 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
This facility is part of the QTS Richmond IV Campus in Virginia.
|
|
4.71 miles
|
CentralInterested in this information?Contact us
|
Facebook, is looking to expand its data center campus near Richmond, Virginia.
|
|
4.84 miles
|
GlobalInterested in this information?Contact us
|
Facebook data center campus in the White Oak Technology Park will use solar power and 100 percent renewable energy.
|
|
5.01 miles
|
Metro StationInterested in this information?Contact us
|
Facebook data center campus in the White Oak Technology Park will use solar power and 100 percent renewable energy.
|
|
5.13 miles
|
Central HubInterested in this information?Contact us
|
Facebook data center campus in the White Oak Technology Park will use solar power and 100 percent renewable energy.
|
|
5.20 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
This facility is part of the QTS Richmond IV Campus in Virginia.
|
|
5.25 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
This facility is part of the QTS Richmond IV Campus in Virginia.
|
|
5.32 miles
|
QTS: RIC2 DC2
|
QTS Realty Trust is continuing its data center expansion at its Richmond Mega Data Center campus in Henrico after acquiring another 200 acres at the site. The company said that it planned to build up to 1.5 million square feet (140,000 sq m) of additional capacity.
|
|
5.33 miles
|
QTS: RIC2 DC1
|
QTS Realty Trust is continuing its data center expansion at its Richmond Mega Data Center campus in Henrico after acquiring another 200 acres at the site. The company said that it planned to build up to 1.5 million square feet (140,000 sq m) of additional capacity.
|
|
5.34 miles
|
QTS: RIC2 DC3
|
QTS Realty Trust is continuing its data center expansion at its Richmond Mega Data Center campus in Henrico after acquiring another 200 acres at the site.
|
|
5.37 miles
|
QTS: RIC2 DC4
|
This facility is part of QTS Data Center's Richmond II Campus in Virginia.
|
|
5.38 miles
|
QTS: RIC2 DC5
|
This facility is part of QTS Data Center's Richmond II Campus in Virginia.
|
|
5.43 miles
|
BoA: Sandston
|
|
|
5.47 miles
|
Iron Mountain: RCH-1
|
RCH-1 is the first of four buildings on Iron Mountain's White Oak Technology Park campus in Henrico County, east of Richmond.
|
|
5.48 miles
|
Iron Mountain: RCH-2
|
RCH-2 is the second building on Iron Mountain's White Oak Technology Park campus in Henrico County, east of Richmond.
|
|
5.49 miles
|
QTS: RIC3-DC4
|
QTS plans to construct a total of five, two-story, 360,000-sqft data centers, totaling 1.8 million square feet in Henrico County.
|
|
5.51 miles
|
QTS: RIC3-DC5
|
QTS plans to construct a total of five, two-story, 360,000-sqft data centers, totaling 1.8 million square feet in Henrico County.
|
|
5.56 miles
|
QTS: Richmond I DC3
|
|
|
5.57 miles
|
Iron Mountain: RCH-4
|
RCH-4 is the fourth building on Iron Mountain's White Oak Technology Park campus in Henrico County, east of Richmond.
|
|
5.58 miles
|
QTS: Richmond I DC4
|
QTS has expanded its Richmond I campus on Portugee Road with three two-story, 155,175-square-foot data center buildings, totaling 465,525 square feet of space, and this building is one of them.
|
|
5.59 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
This facility is part of the QTS Richmond IV Campus in Virginia.
|
|
5.63 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
This facility is part of the QTS Richmond IV Campus in Virginia.
|
|
5.65 miles
|
Iron Mountain: RCH-3
|
RCH-3 is the third building on Iron Mountain's White Oak Technology Park campus in Henrico County, east of Richmond.
|
|
5.65 miles
|
QTS Richmond I DC1
|
QTS massive data center in Richmon sits on 110 acres with an additional 100 acres available for future development. There are 3 building on the campus with a total potential floor space of 550,000 square feet
|
|
5.66 miles
|
QTS: RIC3-DC1
|
QTS plans to construct a total of five, two-story, 360,000-square-foot data centers, totaling 1.8 million square feet in Henrico County.
|
|
5.67 miles
|
QTS: RIC3-DC2
|
QTS plans to construct a total of five, two-story, 360,000-sqft data centers, totaling 1.8 million square feet in Henrico County.
|
|
5.68 miles
|
QTS: Richmond I DC5
|
QTS has expanded its Richmond I campus on Portugee Road with three two-story, 155,175-square-foot data center buildings, totaling 465,525 square feet of space, and this building is one of them.
|
|
5.70 miles
|
QTS: RIC3-DC3
|
QTS plans to construct a total of five, two-story, 360,000-sqft data centers, totaling 1.8 million square feet in Henrico County.
|
|
5.72 miles
|
QTS: Richmond I DC2
|
|
|
5.76 miles
|
QTS: Richmond I DC6
|
QTS has expanded its Richmond I campus on Portugee Road with three two-story, 155,175-square-foot data center buildings, totaling 465,525 square feet of space, and this building is one of them.
|
|
6.46 miles
|
QTS: RIC5 DC6
|
This facility is part of the QTS Richmond V campus in Virginia.
|
|
6.74 miles
|
QTS: RIC5 DC4
|
This facility is part of the QTS Richmond V campus in Virginia.
|
|
7.10 miles
|
QTS: RIC5 DC5
|
|
|
7.18 miles
|
QTS: RIC5 DC1
|
QTS has acquired a total of 620 acres of land in Sandston, Virginia
|
|
7.45 miles
|
QTS: RIC5 DC2
|
This facility is part of the QTS Richmond V campus in Virginia.
|
|
7.61 miles
|
QTS: RIC5 DC3
|
This facility is part of the QTS Richmond V campus in Virginia.
|
|
10.79 miles
|
Park BetaInterested in this information?Contact us
|
Project Peanut is Google’s first active, multi-phase data center campus development in eastern Chesterfield County, located on a 300-plus acre site adjacent to the Meadowville Technology Park.
|
|
10.96 miles
|
Cloud HubInterested in this information?Contact us
|
This facility is part of Google's Project Peanut in Chesterfield County, Virginia.
|
|
11.22 miles
|
PowerHouse: CTP-03
|
Chirisa is planning to add a 3rd data center to their campus in the Meadowville Technology Park.
|
|
11.23 miles
|
powerHouse: CTP-02
|
PowerHouse Data Centers & Chirisa is constructing a 139,000-square-foot data center at it's Meadowville Technology Parkway property.
|
|
11.23 miles
|
StationInterested in this information?Contact us
|
This facility is part of Google's Project Peanut in Chesterfield County, Virginia.
|
|
11.27 miles
|
CoreWeave: Chester, VA
|
CoreWeave has entered into a 12-year license agreement, with two 5-year extension options, for a data center facility known as CTP-01.
|
|
11.30 miles
|
Chirisa: CTP-01
|
Chirisa’s existing data center campus on Meadowville Technology Parkway was purchased from Capital One in 2020.
|
|
11.31 miles
|
Digital Fortress: Richmond
|
|
|
11.51 miles
|
Virginia Information Technologies Agency
|
A data center facility located at 11751 Meadowville Lane in Chester, Virginia, is being offered for sale or lease by JLL. Situated on 28 acres in Chesterfield County, south of Richmond.
|
|
11.78 miles
|
PowerHouse: 1600 Digital Drive
|
PowerHouse Data Centers and Chirisa Technology Parks have acquired 104 acres in Chesterfield County to develop Digital Drive Campus.
|
|
11.91 miles
|
Wagner: Richmond, VA
|
A proposed data center development in Varina, Henrico County, just south of Richmond, has been withdrawn by the developer, Wagner Urban Logistics.
|
|
12.94 miles
|
Volterra: Hopewell, VA
|
A former ethanol production facility in Hopewell, Virginia, located roughly 20 miles south of Richmond, is being evaluated for adaptive reuse into an edge data center.
|
|
18.17 miles
|
DC Blox: Richmond, VA
|
DC Blox is moving forward with a revised plan for its data center on the former Azalea Flea Market site. The project was scaled back from an initial $500 million proposal to a single, 65,000-square-foot facility.
|
|
19.00 miles
|
Tract: Colonial Heights, VA
|
After receiving a unanimous recommendation for denial from the Chesterfield County Planning Commission, Tract has withdrawn its zoning application for a proposed data center park on a 744-acre site.
|
|
19.98 miles
|
NuVu: Petersburg Bldg1
|
The NuVu Petersburg Campus is a planned $1.1 billion data center development located on a 75-acre parcel in Petersburg, Virginia.
|