Novva: West Jordan 3

Latest Podcast
6477 Wells Park Rd
Operational
Fully operational facility
Operated by:

Novva: West Jordan 3

Short Code: Building 3
Year Built: 2026
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

The third building of Novva’s West Jordan campus stands as a massive 318,000-square-foot (29,543-square-meter) facility. Construction on the third building of Novva's West Jordan Campus began in January 2024.

Map and Nearby Locations:

6477 Wells Park Rd
Novva Data Centers Sites
Nearby Facilities

Sites within 15 miles of Novva: West Jordan 3

Distance Site About
0.09 miles Novva: West Jordan Campus
The campus plan involves constructing four buildings with a total investment of $1 billion. The first phase, launched in 2023, features a 300,000-square-foot building.
0.18 miles Novva: West Jordan 2
Phase Two of Novva’s West Jordan Campus project began construction in December 2023. It includes the campus’s second building, which measures 318,000 square feet (29,543 square meters).
0.39 miles Carrier-Neutral Data Center Request Dataset
Aligned Energy (SLC-5) is a 450,000 sqft of data center in West Jordan, Utah.
0.72 miles Content Data Center Request Dataset
The first phase of eBay's Topaz project is a 240,000 square foot building housing three 20,000 square foot data center halls
0.74 miles Content Data Center Request Dataset
This facility is part of eBay's Topaz data center campus in South Jordan, Utah.
0.76 miles Hyperscale Data Center Request Dataset
Oracle's 235,000 sqft, Tier III data center is located in the Salt Lake City metropolitan area.
0.78 miles Content Data Center Request Dataset
This facility is part of eBay's Topaz data center campus in South Jordan, Utah.
4.14 miles Aligned Salt Lake City
Situated on 55 acres, including a dedicated on-site substation, the former Fairchild Semiconductor chip fabrication facility is being renovated to become a colocation data center delivering 34 MW of critical capacity.
4.16 miles Aligned SLC-02
Aligned's SLC-02 Data Center is located in West Jordan, Utah. This is the second building of Aligned's Salt Lake City data center campus with 48MW capacity.
4.16 miles Aligned SLC-03
4.51 miles Flexential Salt Lake (South View)
7.06 miles Cirrus DS View 78
Announced in July 2017, the Cirrus Data Services View 78 Campus is under construction. The first phase will support 224,000 sqft and a critical IT load of 32 MW. At full capacity, the campus will expand to 160 MW and over 1 million square feet.
7.62 miles Verizon: 8871 South Sandy
Former XO site
9.44 miles Edged Energy: Bluffdale, UT
Two buildings are planned for the site.
9.74 miles Aligned SLC-04
Aligned's SLC-04 is located in West Valley City, Utah, which is part of the Salt Lake City metropolitan area. SLC-04 is the first facility of approximately 270MW of new data center development that Aligned has planned.
9.82 miles DataBank SLC6
9.87 miles DataBank SLC4
9.89 miles DataBank SLC3
9.91 miles DataBank SLC5
9.94 miles DataBank SLC2
T
he facility has access to more than 8MW of high-density power, and redundant cooling systems maintain optimal temperatures for data center equipment. Situated in a highly secure technology park, the facility is protected by a full perimeter fence encompassing the building, parking areas, loading docks, and all customer entrances.
9.94 miles DataBank Bluffdale Granite Point Campus
DataBank’s Granite Point West Data Center is strategically located in Bluffdale, UT, minutes from downtown Salt Lake City. With a carrier-neutral design, the 95,000 sqft building has over 55,000 sqft of raised-floor space for customer equipment and offers network connectivity to multiple Tier 1 and Tier 2 providers. Diverse substations provide more than 11MW of high-density power, while redundant cooling systems maintain optimal temperatures for data center equipment.
10.43 miles Senawave
10.63 miles Voonami Salt Lake City SLC2
10.63 miles EdgeConneX Salt Lake
Within 5 miles from downtown SLC and 3 miles from SLC International Airport
10.66 miles Flexential Salt Lake (Presidents)
11.46 miles Hyperscale Data Center Request Dataset
11.59 miles Flexential Salt Lake (Mill Creek)
11.74 miles NSA Utah Data Center
13.18 miles Flexential Salt Lake (Cottonwood)
13.24 miles Lumen Salt Lake City 4
13.46 miles Lumen Salt Lake 1
13.53 miles Flexential Downtown Salt Lake (Delong)
14.37 miles Lumen Salt Lake 2
14.85 miles Flexential Salt Lake (Fair Park)
15.05 miles Unisys Salt Lake City
Unisys's Salt Lake City data center supports multiple Unisys business functions for IT Managed Services
15.32 miles XMission 51 E 400 S
15.85 miles DataBank SLC1
DataBank’s Downtown Salt Lake City data center is a multi-tenant colocation facility located in the heart of the downtown business district. The site is the primary carrier-hotel for the Salt Lake City area and is highly populated with a number of prominent Tier-1 and Tier-2 network providers which enter the building through multiple diverse points. The site was formerly operated by C7 before the Databank acquisition.
18.84 miles Tract: Pole Canyon Tech Park
Tract is planning a large new data center park in Eagle Mountain, Utah. The company has completed the acquisition of more than 668 acres of land in Eagle Mountain.
18.87 miles Tract: Pole Canyon Expansion

Novva: West Jordan 3 Data Center Photos (See all)

Operating Company

Operated by:
13
Facilities
0
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?