Aligned Data Centers Sold in $40bn Deal
October 11, 2025
Aligned
Aligned’s SLC-03 is the third building of Aligned's Salt Lake city campus. The data center is a two-story, 80MW build-to-suit facility at its West Jordan campus. The campus hosts three facilities, while Aligned has four data centers in the Salt Lake City metro area.
| Distance | Site | About |
|---|---|---|
| 0.11 miles | Aligned SLC-02 |
Aligned's SLC-02 Data Center is located in West Jordan, Utah. This is the second building of Aligned's Salt Lake City data center campus with 48MW capacity.
|
| 0.30 miles | Aligned Salt Lake City |
Situated on 55 acres, including a dedicated on-site substation, the former Fairchild Semiconductor chip fabrication facility is being renovated to become a colocation data center delivering 34 MW of critical capacity.
|
| 2.80 miles | Flexential Salt Lake (South View) |
|
| 2.99 miles | Cirrus DS View 78 |
Announced in July 2017, the Cirrus Data Services View 78 Campus is under construction. The first phase will support 224,000 sqft and a critical IT load of 32 MW. At full capacity, the campus will expand to 160 MW and over 1 million square feet.
|
| 3.47 miles | Verizon: 8871 South Sandy |
Former XO site
|
| 3.70 miles | Hyperscale Data Center Request Dataset |
Oracle's 235,000 sqft, Tier III data center is located in the Salt Lake City metropolitan area.
|
| 3.98 miles | Novva: West Jordan 2 |
Phase Two of Novva’s West Jordan Campus project began construction in December 2023. It includes the campus’s second building, which measures 318,000 square feet (29,543 square meters).
|
| 4.07 miles | Novva: West Jordan Campus |
The campus plan involves constructing four buildings with a total investment of $1 billion. The first phase, launched in 2023, features a 300,000-square-foot building.
|
| 4.16 miles | Novva: West Jordan 3 |
The third building of Novva’s West Jordan campus stands as a massive 318,000-square-foot (29,543-square-meter) facility.
|
| 4.33 miles | Content Data Center Request Dataset |
The first phase of eBay's Topaz project is a 240,000 square foot building housing three 20,000 square foot data center halls
|
| 4.34 miles | Content Data Center Request Dataset |
This facility is part of eBay's Topaz data center campus in South Jordan, Utah.
|
| 4.47 miles | Content Data Center Request Dataset |
This facility is part of eBay's Topaz data center campus in South Jordan, Utah.
|
| 4.50 miles | Carrier-Neutral Data Center Request Dataset |
Aligned Energy (SLC-5) is a 450,000 sqft of data center in West Jordan, Utah.
|
| 7.19 miles | Edged Energy: Bluffdale, UT |
Two buildings are planned for the site.
|
| 7.70 miles | DataBank SLC6 |
|
| 7.70 miles | DataBank SLC4 | |
| 7.73 miles | DataBank SLC5 | |
| 7.78 miles | DataBank SLC3 | |
| 7.79 miles | DataBank SLC2 |
T
he facility has access to more than 8MW of high-density power, and redundant cooling systems maintain optimal temperatures for data center equipment. Situated in a highly secure technology park, the facility is protected by a full perimeter fence encompassing the building, parking areas, loading docks, and all customer entrances. |
| 7.79 miles | DataBank Bluffdale Granite Point Campus |
DataBank’s Granite Point West Data Center is strategically located in Bluffdale, UT, minutes from downtown Salt Lake City. With a carrier-neutral design, the 95,000 sqft building has over 55,000 sqft of raised-floor space for customer equipment and offers network connectivity to multiple Tier 1 and Tier 2 providers. Diverse substations provide more than 11MW of high-density power, while redundant cooling systems maintain optimal temperatures for data center equipment.
|
| 8.58 miles | Flexential Salt Lake (Mill Creek) |
|
| 8.99 miles | Senawave | |
| 9.15 miles | Flexential Salt Lake (Cottonwood) |
|
| 9.65 miles | EdgeConneX Salt Lake |
Within 5 miles from downtown SLC and 3 miles from SLC International Airport
|
| 9.65 miles | Voonami Salt Lake City SLC2 | |
| 9.66 miles | Flexential Salt Lake (Presidents) |
|
| 10.03 miles | Aligned SLC-04 |
Aligned's SLC-04 is located in West Valley City, Utah, which is part of the Salt Lake City metropolitan area. SLC-04 is the first facility of approximately 270MW of new data center development that Aligned has planned.
|
| 10.83 miles | NSA Utah Data Center |
|
| 10.91 miles | Hyperscale Data Center Request Dataset | |
| 12.08 miles | Lumen Salt Lake 1 | |
| 12.12 miles | Flexential Downtown Salt Lake (Delong) |
|
| 12.25 miles | Lumen Salt Lake City 4 | |
| 13.03 miles | Flexential Salt Lake (Fair Park) |
|
| 13.06 miles | XMission 51 E 400 S | |
| 13.61 miles | DataBank SLC1 |
DataBank’s Downtown Salt Lake City data center is a multi-tenant colocation facility located in the heart of the downtown business district. The site is the primary carrier-hotel for the Salt Lake City area and is highly populated with a number of prominent Tier-1 and Tier-2 network providers which enter the building through multiple diverse points.
The site was formerly operated by C7 before the Databank acquisition.
|
| 13.72 miles | Unisys Salt Lake City |
Unisys's Salt Lake City data center supports multiple Unisys business functions for IT Managed Services
|
| 13.93 miles | Lumen Salt Lake 2 | |
| 19.90 miles | Tract: Pole Canyon Tech Park |
Tract is planning a large new data center park in Eagle Mountain, Utah. The company has completed the acquisition of more than 668 acres of land in Eagle Mountain.
|
| 19.95 miles | Tract: Pole Canyon Expansion |
October 11, 2025
Aligned
July 25, 2025
Aligned
May 24, 2024
Aligned
January 16, 2024
Aligned
September 28, 2023
Aligned
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas