Data Center Campus

Green Datacenter: Dielsdorf ZRH2 Campus

Green's Campus ZRH2 (formerly Metro-Campus Zurich) on Niederhaslistrasse beside Dielsdorf station, 15 km north of Zurich, with two operating data centers, a third under construction, a business park and an on-site EKZ substation. First built in 2022, with expansions planned through 2027.

3 sites Zurich
OperationalUnder Construction
Fully operational with expansion in progress
Developed by:

Campus at a Glance

3 data centers on this campus
First built in 2022 with expansions through 2027
Total building size: ░░░░░░░ Request Dataset SqFt
Coordinates: 47.48165, 8.46174
░░░░ Request Dataset MW
Operational
░░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

Green's Campus ZRH2, marketed until 2025 as Metro-Campus Zurich, sits on Niederhaslistrasse in Dielsdorf's industrial zone. It lies beside Dielsdorf S-Bahn station, about 15 km north of Zurich. It is Green's second Swiss campus after Lupfig (Campus ZRH1).

Land and buildings

  • The campus covers about 46,000 m² (11.4 acres) of former farmland on cadastral parcels 2165 to 2169.
  • Green announced the CHF 500 million project in January 2021 and broke ground the same year.
  • The master plan holds three four-storey data center modules and three office buildings for a business park. It also includes a 200 m underground garage and a public park with a pond.
  • Implenia is the general contractor. MBA Projektmanagement manages the project, eins architekten designed it and Emch+Berger engineered the civil works.
  • The south office building's facade uses 100% recycled aluminium, a first in Switzerland.

Ownership

  • Green Datacenter AG develops and operates the campus.
  • InfraVia bought Green from Altice in 2018. IFM Investors' Global Infrastructure Fund bought Green Group AG from InfraVia, and the deal closed on 30 October 2025.

Power and cooling

  • EKZ built a new substation, Unterwerk Dielsdorf, on the campus. It connects to Axpo Grid's 110 kV Regensdorf-Eglisau line and is designed for three 50 MVA transformer feeds. The first stage has two. EKZ spent about CHF 14 million on it.
  • EKZ's Regensdorf and Steinmaur substations give a second, independent supply.
  • Avesco supplies 27 Cat diesel generator sets for the full campus, nine per data center. Each has SCR exhaust cleaning with AdBlue. The generators can also support Swissgrid's tertiary reserve.
  • Cooling uses ambient-air free cooling on up to 300 days a year, with 24 chillers. Green offers hybrid air and liquid cooling for high-density racks. Rooftops carry photovoltaic panels.
  • Waste heat feeds Energie 360°'s Dielsdorf energy network through a heat center on the campus. At full build the campus can heat about 11,500 households in six municipalities.

Connectivity, customers and awards

  • The campus is carrier-neutral. It offers about 50 carriers, SwissIX access and direct links to the major public clouds.
  • Certifications include ISO 27001, ISO 22301, ISO 27701, PCI DSS and SOC 1 Type 2 / ISAE 3402.
  • Customers include hyperscale cloud providers, banks, insurers and hospitals.
  • Data Center M won the DCS Awards 2023 "New Design/Build Project of the Year". The waste heat project won at the Data Cloud Global Awards 2024.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Green Datacenter: Dielsdorf Bldg M Green Datacenter AG
Operational
░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2022
Green Datacenter: Dielsdorf Bldg N Green Datacenter AG
Operational
░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2025
Green Datacenter: Dielsdorf Bldg O Green Datacenter AG
Under Construction
— — 2027

Map and Nearby Locations

Green Datacenter: Dielsdorf ZRH2 Campus Power Growth Over Time

+277% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Developer

Developed by:
0
Facilities
0
Markets

News

Read Green Datacenter Invests in large Zurich Campus
Green Datacenter Invests in large Zurich Campus

Green Datacenter Invests in large Zurich Campus

January 18, 2021 Green Datacenter: Dielsdorf Bldg M

Green Datacenter announced they will begin construction on a new data center campus North of Zurich in the town of Dielsdorf. The campus, named "Zurich Metro Campus", will have three data center buildings and will contain over 46,000 sqm (495,000 sq ft). There will also be three office buildings...

Read more
Read More News

Ready to Level up Your
Data Center Strategy?