Green Datacenter: Zurich West 1
Trakt A of Green's original Lupfig building: 3,300 m² of white space on three floors, including a 1,100 m² hall on ABB 380 V DC power distribution, once billed as the world's most powerful DC-powered data center.
Trakt A of Green's original Lupfig building: 3,300 m² of white space on three floors, including a 1,100 m² hall on ABB 380 V DC power distribution, once billed as the world's most powerful DC-powered data center.
Future data center phases on Green's Lupfig campus beyond Zurich West 4. Green's 2021 plans showed three further buildings at the site, one of which became Zurich West 4.
Trakt B of Green's original Lupfig building, attached to Zurich West 1: 3,548 m² of white space in 8,330 m² gross floor area, with ammonia free-cooling chillers and an ABB hybrid power supply.
Green's fourth Lupfig data center: a 30 m building with 5,526 m² of data center space and about 2,000 m² of offices, free cooling, rooftop solar, and waste heat fed to IBB's Naturenergie Eigenamt heating network.
Data Center 2 (Building N) of Green's Campus ZRH2 in Dielsdorf: a four-storey data center with 5,800 m² of white space, built by Implenia beside Data Center 1, with waste heat recovery for the Dielsdorf heating network.
Data Center 1 (Building M) of Green's Campus ZRH2 in Dielsdorf: a four-storey data center with 5,600 m² of white space, ambient-air free cooling, rooftop solar and waste heat fed to Energie 360°'s Dielsdorf heating network.
Data Center 3 (Building O) of Green's Campus ZRH2 in Dielsdorf, under construction north of Data Center 2, with 5,800 m² of planned white space and waste heat recovery for the Dielsdorf heating network.
Switzerland's first high-density colocation building: a six-storey, CHF 70 million data center on Green's Lupfig campus with 3,600 m² of white space for up to 25 kW per rack.
January 24, 2023 Zurich
Green has announced the launch of its 46,000 sqm (495,150 sq ft) site new data center campus in the Dielsdorf region in Zurich. According to the Swiss data center operator, the campus, when fully built out, will contain three buildings, namely M, N, and O.Announced back in January 2021,...
Read more
December 02, 2022 Green Datacenter AG
Green has announced the closing of a $514 million refinancing. The Swiss data center operator successfully refinanced its existing facilities with a total package of CHF 480 million ($514m) from Swiss and international banks. According to the company, the funds will be used to speed up its...
Read more
January 18, 2021 Green Datacenter: Dielsdorf Bldg M
Green Datacenter announced they will begin construction on a new data center campus North of Zurich in the town of Dielsdorf. The campus, named "Zurich Metro Campus", will have three data center buildings and will contain over 46,000 sqm (495,000 sq ft). There will also be three office buildings...
Read more