Site: Flexential Hillsboro 1
Company: Flexential
Metro: Portland
State: Oregon
Region: Pacific Northwest
Country: United States
Region: North America
Region: Americas
Address: Total Building SqFt: 85,388
Gross SqFt: 50,157
Total Power: 5.3 Megawatts
The Hillsboro sites are a former ViaWest. Flexential was created after Peak10 acquired ViaWest for $1.67 billion in August 2017. The rebranding from ViaWest to Flexential was announced in January 2018.
Power:
- A and B source power circuit delivery capabilities
- Four 480 Volt utility power feeds
- 8.5 megawatt diesel power generation capacity
- Automatic power switching
- 3,960 kVA UPS system capacity
- Redundant battery strings
- Multiple redundant power distribution paths
- Branch Circuit Monitoring Systems
- Connected to PGE Sunset Reliability Center with redundant power grids
- Diesel fuel priority with PGE's Dispatchable Standby Generation Program DSG guaranteeing 24x7 availability
HVAC:
- 1,680 tons of redundant cooling capacity
- Anti-static raised flooring with designated cable runs and cooled air delivery
- Hot aisle/cold aisle configuration
- Waterside economizers allow for free environmental cooling
Compliance:
- SSAE 16 and ISAE 3402 Service Organization Control (SOC) 1 Type II
- SOC 2 Type II and SOC 3 reports
- PCI DSS
- HIPAA
- NIST 800-53
- ITAR
- US-EU Safe Harbor Privacy framework