░░░░░░ Login to view SqFt Gross Colocation Size
░░░ Contact Us to subscribe to our data service MW Total Power
Show SqMThe Portland Brewery Blocks data center was purposely built by it’s previous owner, Tycom to serve as an endpoint for it’s high-capacity, undersea fiber cable linking the US with Asia. Considered to be critical National communications infrastructure, it’s a TIA942 Certified facility, designed to remain online and operational in multitudes of potential adverse events. With its 2N and N+1 redundancy throughout, 8MW of Power, 4,000 Ton cooling capacity.
• AT&T
• Abovenet
• ACS Alaska*
• Cogent*
• Comcast*
• Global Crossing
• he.net
• Integra Telecom
• Level 3
• LS Networks*
• PAETEC (Windstream)*
• Qwest/Centurylink
• SilverStar Telecom*
• Verizon Business*
• Spectrum Networks*
• TATA
• TW Telecom
• XO
• Zayo (360 Networks)
Distance | Site | About |
---|---|---|
0.00 miles | Opus Interactive Portland | |
0.15 miles | Atmosera DC3 | |
0.18 miles | Pittock Internet Exchange |
The Pittock building is Portland's carrier hotel, which has the second greatest density of networks and carriers in the Pacific Northwest (2nd to the Westin Building in Seattle.)
|
0.26 miles | Lumen Portland 2 |
Located in the Union Bank Building
|
0.30 miles | LightPoint Portland | |
0.59 miles | Lumen Portland I | |
0.61 miles | H5 Portland |
vXchnge acquired the site from SunGard in 2015.
In 2017 the NWAX peering Exchange deployed to vXchnge Portland.
|
0.67 miles | SpireTech | |
5.55 miles | Atmosera DC1 DC2 | |
5.55 miles | Lunavi Portland |
|
6.96 miles | XO: Beaverton | |
7.03 miles | Lumen Portland 3 |
The site is a former tw telecom operated facility.
|
10.21 miles | Flexential Hillsboro 1 |
The Hillsboro sites are a former ViaWest. Flexential was created after Peak10 acquired ViaWest for $1.67 billion in August 2017.
|
10.23 miles | 3825 NW Aloclek Hillsboro - Digital Realty |
|
10.31 miles | Tata Hillsboro | |
10.47 miles | Opus Interactive Hillsboro |
|
10.50 miles | STACK Portland POR02 |
|
10.90 miles | EdgeConnex POR2 | |
11.33 miles | EdgeConneX POR03 | |
11.36 miles | EdgeConneX Portland |
|
11.55 miles | Flexential Hillsboro 2 |
The site houses the U.S. cable landing station for the Hawaiki submarine cable, which delivers “low-latency” connection between the continental U.S., Hawaii, Australia, New Zealand and American Samoa.
|
11.75 miles | Intel Hillsboro, HF2-DC201 |
|
12.07 miles | QTS Hillsboro 1 |
|
12.14 miles | Adobe Hillsboro |
|
12.15 miles | QTS Hillsboro 2 | |
12.27 miles | QTS Hillsboro 3 | |
12.32 miles | QTS Hillsboro 4 | |
12.41 miles | NTT HI2 | |
12.41 miles | NTT Hilsboro HI1 |
The 144MW site will consist of five buildings with a total space of 1 million sq ft (93,000 sq m).
|
12.42 miles | QTS Hillsboro 5 | |
12.49 miles | STACK Portland POR03 |
STACK Infrastructure is constructing a new data center facility named POR03A at 4735 NE Starr Blvd, Hillsboro, OR. The data center will boast a substantial footprint of 180000 square feet.
|
12.53 miles | Stack: PORT03 Future Expansion |
STACK Infrastructure is planning to extend their data center campus PORT03 at 4735 NE Starr Blvd, in Hillsboro
|
12.55 miles | CoreWeave: Hillsboro, OR |
CoreWeave will expand its data center footprint into two new co-location facilities in Hillsboro, Oregon and Douglasville, GA, both of which are owned and operated by Flexential.
|
12.56 miles | Flexential Portland - Hillsboro 3 |
|
12.57 miles | Stack: POR03B |
STACK Infrastructure is constructing a new data center facility at 4735 NE Starr Blvd, Building B, in Hillsboro with a substantial footprint of 180000 square feet.
|
12.59 miles | T5 Portland | |
12.60 miles | Flexential Hillsboro 4 | |
12.65 miles | Stack: POR03C |
STACK Infrastructure is constructing a new data center facility at 4735 NE Starr Blvd, Building C, in Hillsboro with a substantial footprint of 180000 square feet.
|
12.93 miles | Aligned: PDX-02 |
|
13.02 miles | Aligned Hillsboro PDX-01 |
Aligned's Hillsboro campus spreads across 27.2 acres of land at the intersection of NE 30th Ave. and NE Evergreen Rd. The initial data center facility, dubbed PDX-01, is anticipated to deliver 72MW of critical capacity.
|
13.23 miles | OVH Hillsboro, Oregon: HIL-1 | |
19.57 miles | Rowan: Meriwether, Portland, OR |
Rowan Data Centers has announced plans for a campus in Forest Grove, Portland, OR. Preliminary plans for the Project Meriwether development call for 150 MW of capacity.
|