The Pacific Northwest Data Center Map Has 138 Sites

Search Pacific Northwest's Data Centers


Pacific Northwest Data Center List

Westin Building Seattle
2001 Sixth Avenue
Seattle, WA 98121
Located in Seattle
  • 60,000 Gross SqFt
  • ??? NN
    Interested in this information? Contact us
    Megawatts

The Westin Building is a Carrier Hotel and the communications hub of the Pacific Northwest. The 34 story building has a conglomeration of colocation providers, carriers, and peering exchanges.

Equinix Seattle SE2
2001 Sixth Avenue
Seattle, WA 98121
Located in Seattle
  • 43,610 Gross SqFt
  • ??? NN
    Interested in this information? Contact us
    Megawatts

Equinix SE2 occupies 4 different floors with in the Westin Building

Equinix Seattle SE4
6906 S. 204th Street
Kent, WA 98032
Located in Seattle
  • 108,000 Gross SqFt
  • ??? NN
    Interested in this information? Contact us
    Megawatts

Equinix SE4 is located 16 miles from SE2 and SE3, which are both located in Downtown Seattle. It is a 1-story building located 8 miles away from the Seattle Tacoma International Airport (SEA).

H5 Seattle
1000 Denny Way
Seattle, WA 98109
Located in Seattle
  • ??? NN
    Interested in this information? Contact us
    Megawatts
  • 293,000 Building SqFt

H5 owns the building and is landlord to the Seattle Level(3) Gateway and a XO data center.

Digital Fortress Downtown
3101 Western Ave
Seattle, WA 98121
Located in Seattle
  • 25,000 Gross SqFt
  • ??? NN
    Interested in this information? Contact us
    Megawatts

Purpose-built, high-density datacenter with Seismic Zone 4 construction.


Largest Data Centers in Pacific Northwest

Gross SqFt Gross SqFt Power (MW) Power (MW)
Facebook Prineville 275.00
Microsoft Quincy MWH 800,000 100.00
Google The Dalles Oregon 100.00
Apple Prineville 96.00
Yahoo-Oath Quincy 331,000 77.00
{{ datacenter.site_name }} {{ datacenter.total_gross_sqft }} {{ datacenter.total_power_mw }}

Top Pacific Northwest Datacenter Markets by # of Sites

Loading...

Top Pacific Northwest Datacenter Markets by Power Capacity (MW)

Loading...

We will be developing a campus next to our existing facility that will be home to two new buildings. This new construction will bring our total Prineville footprint to more than 3.2 million square ...
The facility was acquired in 2019 by GI Partners in a sale-leaseback transaction

Large Content Company Data Centers in Rural Oregon
Posted in Oregon
Source: Dan Aguayo - The Oregonian
Rendering of the proposed CyrusOne Quincy Facility
Posted in CyrusOne Quincy
SE4 at 6906 S. 204th Street in Kent
Posted in Equinix Seattle SE4
Source: Google Maps
Fisher Plaza with Space Needle in the Background
Posted in KOMO Plaza (was Fisher Plaza)
Antennae atop Komo Plaza
Posted in KOMO Plaza (was Fisher Plaza)
Source: Komo Plaza
Satellite View of 23050 NE 102 St in Redmond
Posted in Microsoft Redmond Ridge
Row of Server Cabinets at "Redmond Ridge 1"
Posted in Microsoft Redmond Ridge
Another Row of Cabinets
Posted in Microsoft Redmond Ridge
Source: Foursquare
Lobby at launch
Posted in Flexential Portland - Hillsboro 3
Source: Flexential
Rendering of the to be constructed Flexential Hillsboro 3 facility
Posted in Flexential Portland - Hillsboro 3
Source: Flexential
Exterior of H5's Quincy Facility
Posted in H5 Quincy
Source: H5
Colocation floor
Posted in H5 Portland
1st Building on the Campus
Posted in Vantage Quincy
Source: Vantage
Rendering of Campus When Fully Built Out
Posted in Vantage Quincy
Facebook Construction in Prineville Circa 2018
Posted in Facebook Prineville
Source: KTVZ.com
Front of FB Prineville facility
Posted in Facebook Prineville
FB data center room in Prineville
Posted in Facebook Prineville
We will be developing a campus next to our existing facility that will be home to two new buildings. This new construction will bring our total Prineville footprint to more than 3.2 million square ...
Apple Rendering of 4th and 5th Data Centers in Prineville
Posted in Apple Prineville

We will be developing a campus next to our existing facility that will be home to two new buildings. This new construction will bring our total Prineville footprint to more than 3.2 million square feet and will represent an additional investment of $750 million.

Source: https://www.facebook.com/notes/prineville-data-center/growing-our-presence-in-prineville/10155786565698133/
Apple Prineville DC Overhead
Posted in Apple Prineville
City Document from 2016 Showing Apple's Planned Expansion in Prineville
Posted in Apple Prineville
Source: City of Prineville
The facility was acquired in 2019 by GI Partners in a sale-leaseback transaction
Exterior of NTT Data's Facility in Quincy
Posted in NTT Data Quincy

The facility was acquired in 2019 by GI Partners in a sale-leaseback transaction

Aerial View of the South Hill Campus
Posted in Colocation NorthWest South Hill Campus
Source: Centeris
Gate and Entrance to Flexential Facility at 3935 NE Aloclek
Posted in Flexential Hillsboro 1
Canyon Park Business Center
Posted in Microsoft Canyon Park
Satellite View
Posted in Microsoft Canyon Park
Source: Google Maps
Subsea Cable Path from Hillsboro Data Center
Posted in Flexential Hillsboro 2
Source: Flexential