AT&T Partners with AWS and Amazon Leo
February 05, 2026
AT&T
The AT&T Miami data center is located in Fontainebleau and next to the Mall to the Americas
| Distance | Site | About |
|---|---|---|
| 1.44 miles | CoreSite MI2 | |
| 1.85 miles | Aptum Miami |
The site was originally a Peer 1 site before the Cogeco acquisition.
|
| 1.86 miles | 2300 NW 89th PI |
In August 2025, Digital Realty sold its Miami data center for $8 million.
|
| 2.77 miles | Equinix Miami MI6 | |
| 3.60 miles | QTS Miami |
The QTS Miami data center rated to survive a category 5 hurricane, is above the 500-year flood level, and also has 3,000 sq. ft. of office space
|
| 3.72 miles | EdgeConneX MIA01 |
Customer work spaces are available
Raised Floor: 30"
EdgeConnex has rights to adjacent space to accommodate expansion.
|
| 3.73 miles | RadiusDC: Miami I |
The site was formerly managed by Telefonica until Nabiax acquired it in 2020. On 13 June 2023, Nabiax sold its American-based data centers to the investment fund Actis.
|
| 5.79 miles | Metrobloks: Miami MIA-A1 |
The 112,900 SF facility offers customizable rack densities from 5kW to 150+kW, hybrid cooling options (air, liquid, or mixed), and modular scalability from 3MW to 12MW per hall.
|
| 6.15 miles | CoreSite Miami MI1 |
CoreSite’s MI1 data center in Miami provides connectivity from the U.S. to South America, as well as existing and scalable connectivity to NAP of the Americas. Built to withstand a Category 5 hurricane.
|
| 8.11 miles | Lumen: Miami 1 (49 Northwest 5th) | |
| 8.22 miles | Fiberhub MIA1 | |
| 8.24 miles | QuadraNet Miami | |
| 8.24 miles | DataBank MIA1 |
Customers can utilize Zayos fiber and lit services to reach the Nap of the Americas
|
| 8.24 miles | Equinix Miami MI2 | |
| 8.24 miles | ColoHouse Miami | |
| 8.24 miles | 36 NE 2nd - Digital Realty |
The building is one of Miami's top interconnection points the building is home to the former Telx bMMR, Equinix MI2 which is a former Switch and Data site, and ColoHouse.
|
| 8.24 miles | Lumen: Miami 2 | |
| 8.25 miles | NAP of the Americas - Equinix Miami MI1 |
Equinix has 4 data centers in the Miami area, but the MI1 site is their flagship. Not only is it the biggest Equinix facility in Flordia, but it is the best connected. Equinix acquired NOTA as well as 28 other data centers from Verizon in 2017.
|
| 8.35 miles | Real Estate Data Center Request Dataset | |
| 8.42 miles | Cogent: 200 SE 1st | |
| 8.53 miles | Volico MIA1 | |
| 9.06 miles | Iron Mountain: Miami MIA1 |
Located in Miami's District 12 on a 3.4-acre site, the 150,000 sq ft (13,935 sqm) facility is slated to operate on 100 percent carbon-free energy upon its 2026 launch.
|
| 9.44 miles | ifx Miami | |
| 9.61 miles | iM Critical Miami |
|
| 12.18 miles | Verizon: 16583 NW 15th | |
| 14.49 miles | Edgeconnex Miami MIA02 |
February 05, 2026
AT&T
July 26, 2025
AT&T
November 09, 2024
AT&T
October 28, 2024
AT&T
August 14, 2024
Miami
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas