Edged: Phoenix

Latest Podcast 8811 E. Warner Road
Operational
Fully operational facility
Operated by:

Edged: Phoenix

Short Code: PHX01-1
Year Built: 2026
PUE: 1.15
Floors: 2
Lot Size: 12 acres
░░░░ Request Dataset MW
Total Power
░░░░░░░ Login to view SqFt
Gross Colocation Size

The PHX01-1 data center, located at 8811 E. Warner Road in Mesa, Arizona, is a 36MW, two-story facility launched in April 2026 by Edged. Spanning approximately 210,000 square feet on a 12-acre site, the building is designed for high-density AI workloads and uses Edged’s zero-water cooling technology, with reported support for densities up to 400kW per rack via liquid cooling and up to 120kW per rack via air cooling.

Map and Nearby Locations

8811 E. Warner Road
Edged Energy Sites
Nearby Facilities

Edged: Phoenix Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Edged: Phoenix

Distance Site About
0.00 miles Edged Energy: Phoenix, Arizona
Edged Energy is building a 79,200 sq ft data center on a 14-acre site near the Loop 202 freeway and Warner Road.
0.22 miles Novva: Mesa 5
This facility is a part of Novva's Mesa campus in Arizona.
0.29 miles Novva: Mesa 4
This facility is a part of Novva's Mesa campus in Arizona.
0.38 miles Novva: Mesa 3
This facility is a part of Novva's Mesa campus in Arizona.
0.45 miles Novva: Mesa 2
This facility is a part of Novva's Mesa campus in Arizona.
0.51 miles Novva: Mesa Campus
Covering 160 acres, Novva’s first Arizona Data Center campus is located in Mesa, AZ. The campus includes five data halls, 1.3 million sq ft of data hall space, and 200,000 square feet of office space built over 2 phases.
1.05 miles Hyperscale Data Center Request Dataset
Meta's Mesa data center was first announced in August 2021, is a greenfield development of a five-building campus encompassing over 2.5 million square feet of data center and admin space.
1.10 miles Hyperscale Data Center Request Dataset
This facility is a part of Meta's Mesa Campus in Arizona.
1.14 miles Hyperscale Data Center Request Dataset
This facility is a part of Meta's Mesa Campus in Arizona.
1.21 miles Hyperscale Data Center Request Dataset
This facility is a part of Meta's Mesa Campus in Arizona.
1.22 miles Edged Energy: Phoenix PHX11
Edged Energy is planning a built-to-suit data center near its PHX01 facility.
1.30 miles EdgeCore: PH03
1.33 miles Hyperscale Data Center Request Dataset
This facility is a part of Meta's Mesa Campus in Arizona.
1.42 miles CyrusOne Mesa
CyrusOne plans to develop a new campus on 62 acres on the corner of Elliot and Ellsworth Roads.
1.44 miles Edgeconnex: Mesa
EdgeConneX is building a massive data center campus on a 93-acre land parcel it has owned since 2017 through Loop 202 & Elliot Road LLC.
1.49 miles EdgeCore: PH02
1.54 miles EdgeCore: Mesa PH01
The 1.25 million sqft campus can include up to 7 buildings. The first of the seven data halls is complete and totals 200,880 sqft with an adjoining 20,000 sqft office and support space included.
1.57 miles Comarch Mesa
1.62 miles EdgeCore: Mesa Expansion
EdgeCore Digital Infrastructure is significantly expanding its data center campus in Mesa, Arizona. The company plans to add an additional 43.87 acres to its existing 40-acre facility.
2.09 miles Hyperscale Data Center Request Dataset
Phase II is expected to see Google build 280,000 square feet more.
2.13 miles Hyperscale Data Center Request Dataset
Amazon.com Inc. looks to be getting closer to starting construction on two separate data center projects in southeast Mesa. The Elliot campus is a 42.9-acre property located off Elliot Road, adjacent to Apple's existing data center in Mesa.
2.14 miles NTT Phoenix Campus
The first data center building encompasses 126,000 sqft of data floor space.
2.15 miles NTT PH3
2.20 miles NTT PH2
2.22 miles Hyperscale Data Center Request Dataset
This facility will be a part of Google's Redhawk campus in Mesa, AZ.
2.25 miles NTT PH6
This facility is part of NTT's Phoenix Campus in Mesa, Arizona.
2.31 miles NTT PH5
This facility is part of NTT's Phoenix Campus in Mesa, Arizona.
2.32 miles Hyperscale Data Center Request Dataset
2.36 miles NTT PH4
This facility is part of NTT's Phoenix Campus in Mesa, Arizona.
2.44 miles Hyperscale Data Center Request Dataset
The site was a former a sapphire-glass factory that supplied glass to Apple. The glass maker filed for bankruptcy and vacated the building in 2014. Now the 1.3 million square foot building is one of Apple’s data centers
3.04 miles NTT: Pacific 4
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
3.13 miles NTT: Pacific 5
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
3.23 miles NTT: Pacific 6
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
3.27 miles NTT: Pacific Proving Tech Park
NTT Data has acquired 173 acres at the northeast intersection of Pecos and Crismon roads, east of Mesa, for $300 million.
3.31 miles NTT: Pacific 7
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
3.35 miles NTT: Pacific 2
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
3.44 miles NTT: Pacific 3
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
3.46 miles Hyperscale Data Center Request Dataset
Amazon.com Inc. looks to be getting closer to starting construction on two separate data center projects in southeast Mesa.
10.64 miles US Signal Phoenix AZ01
13.75 miles Centersquare: PHX1
Centersquare's Phoenix Mesa is cloud-enabled data center located just 10 miles from Phoenix Sky Harbor Airport, with more than 154,000 sq. ft. of space.
14.17 miles Lincoln: Chandler, AZ
Real estate firm Lincoln Property Company reacquired its data center in Phoenix, Arizona, in 2025.
14.18 miles Lincoln: Chandler Bldg-2
Lincoln Property's three-story, 243,000 sq ft expansion building is part of a future development plan that was approved by the City of Chandler under the previous owner.
14.18 miles Internap Phoenix 2500 W Frye Rd
American cloud and colocation provider Internap (INAP) has taken a master lease in a 150,000 square foot data center in Chandler, near Phoenix, Arizona.
14.38 miles CyrusOne PHX10
14.39 miles CyrusOne PHX3
14.42 miles CyrusOne PHX1
14.44 miles CyrusOne Chandler Phoenix Campus
CyrusOne plans to build nearly 2 million square-feet data center campus. There are two buildings on the campus currently
14.46 miles CyrusOne PHX2
14.46 miles CyrusOne PHX5
14.48 miles CyrusOne PHX9
14.51 miles CyrusOne PHX4
14.52 miles CyrusOne PHX7
14.52 miles H5 Phoenix
H5 acquired the site when it bought NextFort in January 2016H5 acquired the site when it bought NextFort in January 20
14.53 miles DataCanopy: Phoenix, AZ
14.55 miles CyrusOne PHX6
14.63 miles CyrusOne PHX8
14.65 miles 2121 S Price - Digital Realty
In 2010, DRT acquired this site from 365 Main portfolio.
14.75 miles 2055 E Technology - Digital Realty
Located in the Arizona State University Research Park and downtown Phoenix Central Business District, the facility was redeveloped in 2007. Digital Realty's 76,000 square foot data center at 2055 E. Technology Circle is approximately 15 miles away from downtown Phoenix. The building is SOC2 certified with 24/7 security and critical facilities management.
14.77 miles 1900 S Price - Digital Realty
The Building is 1 story Flood Zone: Zone X Seismic Zone: Zone 1
14.79 miles Aligned: PHX-04
Aligned Energy's PHX04 site is located at the NEC of Price Road and Innovation Street. The data center spans 396,343 sqft.
14.83 miles Aligned: PHX-06
PHX06 is a two-phase development that will total 456,946 SqFt
14.84 miles 2010 East Centennial
Digital Realty sold the office & data center building in 2018 to an unnamed company. We believe Fox Sports is the tenant.
16.84 miles Ryan: Florence Tech Park
The 780-acre development, dubbed the Florence Tech Park, has been presented with varying plans. Initial conceptual documents show five data centers, two office buildings, and one general industrial building.
17.74 miles EdgeCore: Dobson Expansion
17.86 miles EdgeCore: Dobson Farms
Ryan Companies and EdgeCore are moving forward with plans to develop a massive new data center and industrial campus on over 780 acres located in the town of Florence, Pinal County.
19.26 miles EdgeConneX Phoenix
19.31 miles Menlo: MD-PX1 Bldg5
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
19.32 miles Menlo: MD-PX1 Bldg3
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
19.42 miles Menlo: MD-PX1 Bldg4
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
19.43 miles Menlo: MD-PX1 Bldg2
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
19.43 miles Menlo: MD-PX1 (Phoenix)
Menlo Digital's MD-PX1 (Phoenix) data center campus consists of five buildings on 38 acres. The campus will span 1,022,400 square feet.

Edged: Phoenix Data Center Photos See all

Source: Baxtel

Operating Company

Operated by:

Edged Energy is a colocation and data center provider. The company also has data centers in development across the US.

Its Spain business is a subsidiary of Endeavour in collaboration with Merlin Properties.

44
Facilities
23
Markets

News See all

Read Edged Raises Nearly $2 Billion to Accelerate U.S. Data Center Expansion
Edged Raises Nearly $2 Billion to Accelerate U.S. Data Center Expansion

Edged Raises Nearly $2 Billion to Accelerate U.S. Data Center Expansion

May 29, 2026 Edged Energy

US data center developer Edged has secured nearly $2 billion in financing so far this year to support the expansion of its data center portfolio. The company said the capital will be used to advance projects in key markets, including Atlanta, Chicago, and Council Bluffs. The funding package...

Read more
Read Edged Opens 36MW Data Center in Phoenix, Arizona
Edged Opens 36MW Data Center in Phoenix, Arizona

Edged Opens 36MW Data Center in Phoenix, Arizona

April 08, 2026 Edged Energy

US operator Edged has launched a new data center in Phoenix, Arizona. The Endeavour-owned company this month announced the opening of its PHX01-1 facility. Situated on a 12-acre site at 8811 E. Warner Road in Mesa, Maricopa County, the two-story building delivers 36MW of capacity across 210,000...

Read more
Read Edged secures permission for second data center at Irving campus, Tex
Edged secures permission for second data center at Irving campus, Tex

Edged secures permission for second data center at Irving campus, Tex

January 17, 2026 Edged Energy

Data center operator Edged this week announced plans to add a second data center to its Edged Dallas campus in Irving, Dallas County. The news follows Irving City Council voting unanimously to approve the expansion, which will be located on North Wildwood Drive in the industrial area east of...

Read more
Read Edged Breaks Ground on Second Chicago Faciity
Edged Breaks Ground on Second Chicago Faciity

Edged Breaks Ground on Second Chicago Faciity

November 21, 2025 Edged Energy

Data center firm Edged has broken ground on a second data center in Chicago, Illinois. Located at 2835 Bilter Road, the new facility will be purpose-built for high-density AI workloads and feature advanced closed-loop, waterless cooling. The facility will go live in Q2 2027. “Safety and...

Read more
Read Edged Opens Data Center in New Albany, Ohio
Edged Opens Data Center in New Albany, Ohio

Edged Opens Data Center in New Albany, Ohio

September 24, 2025 Edged Energy

Data center operator Edged recently celebrated the opening of its newest data center in New Albany. Tthe two-story facility delivers 24MW of capacity across 206,000 sq ft (19,140 sqm).“This project would not have been possible without the support of the City of New Albany, who has been unwavering...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?