EdgeCore: Dobson Expansion

Latest Podcast
N Attaway Rd
Planned
Future facility in planning stage
Operated by:

EdgeCore: Dobson Expansion

Short Code: Dobson Farms East

Map and Nearby Locations:

N Attaway Rd
EdgeCore Internet Real Estate, LLC Sites
Nearby Facilities

Sites within 15 miles of EdgeCore: Dobson Expansion

Distance Site About
0.15 miles EdgeCore: Dobson Farms
Ryan Companies and EdgeCore are moving forward with plans to develop a massive new data center and industrial campus on over 780 acres located in the town of Florence, Pinal County.
1.21 miles Ryan: Florence Tech Park
The 780-acre development, dubbed the Florence Tech Park, has been presented with varying plans. Initial conceptual documents show five data centers, two office buildings, and one general industrial building.
14.30 miles Hyperscale Data Center Request Dataset
Amazon.com Inc. looks to be getting closer to starting construction on two separate data center projects in southeast Mesa.
14.31 miles NTT: Pacific 3
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
14.39 miles NTT: Pacific 2
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
14.45 miles NTT: Pacific 7
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
14.48 miles NTT: Pacific Proving Tech Park
NTT Data has acquired 173 acres at the northeast intersection of Pecos and Crismon roads, east of Mesa, for $300 million.
14.53 miles NTT: Pacific 6
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
14.62 miles NTT: Pacific 5
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
14.71 miles NTT: Pacific 4
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
17.28 miles Hyperscale Data Center Request Dataset
The site was a former a sapphire-glass factory that supplied glass to Apple. The glass maker filed for bankruptcy and vacated the building in 2014. Now the 1.3 million square foot building is one of Apple’s data centers
17.53 miles EdgeCore: Mesa PH01
The 1.25 million sqft campus can include up to 7 buildings. The first of the seven data halls is complete and totals 200,880 sqft with an adjoining 20,000 sqft office and support space included.
17.55 miles Hyperscale Data Center Request Dataset
Amazon.com Inc. looks to be getting closer to starting construction on two separate data center projects in southeast Mesa. The Elliot campus is a 42.9-acre property located off Elliot Road, adjacent to Apple's existing data center in Mesa.
17.62 miles EdgeCore: PH02
17.64 miles EdgeCore: PH03
17.68 miles NTT Phoenix Campus
The first data center building encompasses 126,000 sqft of data floor space.
17.74 miles Edged Energy: Phoenix, Arizona
Edged Energy is building a 79,200 sq ft data center on a 14-acre site near the Loop 202 freeway and Warner Road.
17.74 miles Edged: Phoenix
Edged Energy’s PHX01-1 is a 36MW, two-story data center in Mesa, Arizona, spanning ~210,000 sq ft on a 12-acre site, launched in April 2026 with waterless cooling for high-density AI workloads.
17.76 miles Novva: Mesa 2
This facility is a part of Novva's Mesa campus in Arizona.
17.81 miles EdgeCore: Mesa Expansion
EdgeCore Digital Infrastructure is significantly expanding its data center campus in Mesa, Arizona. The company plans to add an additional 43.87 acres to its existing 40-acre facility.
17.81 miles Novva: Mesa 5
This facility is a part of Novva's Mesa campus in Arizona.
17.84 miles NTT PH6
This facility is part of NTT's Phoenix Campus in Mesa, Arizona.
17.85 miles Novva: Mesa Campus
Covering 160 acres, Novva’s first Arizona Data Center campus is located in Mesa, AZ. The campus includes five data halls, 1.3 million sq ft of data hall space, and 200,000 square feet of office space built over 2 phases.
17.87 miles Novva: Mesa 4
This facility is a part of Novva's Mesa campus in Arizona.
17.89 miles Hyperscale Data Center Request Dataset
This facility is a part of Meta's Mesa Campus in Arizona.
17.89 miles NTT PH3
17.91 miles Hyperscale Data Center Request Dataset
This facility is a part of Meta's Mesa Campus in Arizona.
17.92 miles NTT PH5
This facility is part of NTT's Phoenix Campus in Mesa, Arizona.
17.95 miles Novva: Mesa 3
This facility is a part of Novva's Mesa campus in Arizona.
17.96 miles Hyperscale Data Center Request Dataset
This facility is a part of Meta's Mesa Campus in Arizona.
17.97 miles NTT PH2
18.00 miles NTT PH4
This facility is part of NTT's Phoenix Campus in Mesa, Arizona.
18.06 miles Hyperscale Data Center Request Dataset
This facility is a part of Meta's Mesa Campus in Arizona.
18.10 miles CyrusOne Mesa
CyrusOne plans to develop a new campus on 62 acres on the corner of Elliot and Ellsworth Roads.
18.11 miles Hyperscale Data Center Request Dataset
Meta's Mesa data center was first announced in August 2021, is a greenfield development of a five-building campus encompassing over 2.5 million square feet of data center and admin space.
18.73 miles Comarch Mesa
18.88 miles Edged Energy: Phoenix PHX11
Edged Energy is planning a built-to-suit data center near its PHX01 facility.
19.08 miles Edgeconnex: Mesa
EdgeConneX is building a massive data center campus on a 93-acre land parcel it has owned since 2017 through Loop 202 & Elliot Road LLC.
19.73 miles Hyperscale Data Center Request Dataset
Phase II is expected to see Google build 280,000 square feet more.
19.89 miles Hyperscale Data Center Request Dataset
This facility will be a part of Google's Redhawk campus in Mesa, AZ.
19.90 miles Hyperscale Data Center Request Dataset

EdgeCore: Dobson Expansion Data Center Photos (See all)

Operating Company

Operated by:

Edgecore is headquartered in Denver, Colorado. It operates under the EdgeCore Digital Infrastructure brand and focuses on large, high-density campuses for hyperscale customers. Partners Group acquired the platform in November 2022 and later completed an additional equity investment in 2024. Current and planned development includes Mesa in Greater Phoenix, Santa Clara in Silicon Valley, the Tahoe-Reno Industrial Center near Reno, and multiple sites in Virginia including Ashburn, Culpeper, and Louisa County.

History:

  • 2025 Jun: Announced plans to invest $17B+ in a Louisa County, Virginia
  • 2024 Jul: Announced a new hyperscale campus in Culpeper, Virginia.
  • Edgecore
  • 2024 Sep: Partners Group completed a USD 1.9 billion equity investment in EdgeCore Digital Infrastructure.
  • 2023 Oct: Introduced a new brand identity as EdgeCore Digital Infrastructure.
  • 2023 Jan: Broke ground on a data center campus in Santa Clara, California.
  • 2022 Nov: Acquired by Partners Group.
  • 2017 company founded
15
Facilities
0
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?