AtlasEdge: Calle de Telemaco

Calle de Telémaco

░░░░░░ Login to view SqFt Gross Colocation Size

░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

Former Colt facility that was acquired by AtlasEdge in 2021

Map and Nearby Locations:

Calle de Telémaco
Click Map to begin Search

Sites within 15 miles of AtlasEdge: Calle de Telemaco

Show SqM
Distance Site About
1.05 miles Digital Realty: MAD4
1.20 miles Hispaweb Miguel Yuste
1.27 miles Nabiax: Julián Camarillo Campus
Nabiax has begun expansion works at its Julián Camarillo Campus. In May 2024, the company announced it would add additional capacity at its Alcalá de Henares campus.
1.41 miles Digital Realty: MAD1
1.42 miles Digital Realty: MAD2
1.49 miles Digital Realty: MAD3
1.53 miles Produban Mesena 80
2.83 miles AtlasEdge: Madrid MAD001
3.77 miles Global Switch Madrid
3.77 miles Verizon Nap of Madrid
3.77 miles Level3 Madrid
3.79 miles nLighten Madrid-Lezama
3.97 miles IPCore Madrid
4.77 miles Ibercom Madrid
4.86 miles Equinix Madrid MD2
5.13 miles inAsset NixMad
5.94 miles DATA4 Madrid - Alcobendas
Launched in 2020, the Madrid MAD01 campus is located at Avenida de la Industia 15 in Alcobendas. At full-build out, the eight-hectare campus will host six buildings.
5.98 miles Data4: MAD01 DC2
The second building of DATA4's Madrid-Alcobendas campus was completed in 2022, offering approximately 3,000 m² of white space.
5.99 miles Equinix MD3x
5.99 miles Data4: MAD01 DC3
Data4 is developing a third data center building at its Alcobendas Campus (MAD01) in Madrid, Spain. When completed, the 15,000 sq m, 3-floor building will host 6 computer rooms.
6.09 miles CyrusOne Madrid I
CyrusOne’s MAD1, finished in 2023, is a located in the municipality of Alcobendas. The data center will ultimately deliver 6,000 sq m (64,584 sq ft) of world-class technical space within a two-story building.
6.10 miles Equinix MD6
6.14 miles Equinix Madrid MD1
7.74 miles Cogent Madrid
7.74 miles Microsoft: San Sebastian
Microsoft is constructing new data center in Madrid, Spain. The facility will be constructed in the San Sebastian de los Reyes area of Madrid and will aim for LEED Gold certification.
7.75 miles Iron Mountain MAD-1
MAD-1 is a 4,000 m² facility situated on a 60,000 m² campus in northeast Madrid. Iron Mountain acquired the campus from XData Properties in November 2022.
9.80 miles Edged Energy: Madrid-Getafe
This data center is strategically positioned in Spain's central fiber and logistics hub, just minutes south of Madrid's city center.
9.80 miles Merlin: Madrid-Getafe
By the end of 2023, Merlin Properties completed the first phase of three data centers in Madrid, Barcelona, and Alava, all built in partnership with US firm Edged Energy
11.41 miles Microsoft: MAD01
11.72 miles BBVA CPD Tres Cantos
13.36 miles NTT Madrid 1
In 2022, NTT launched its first data center in Spain, opening a new facility outside Madrid, in the municipality of Las Rozas.
13.62 miles Form8tion: Madrid One
15.49 miles Data4: Madrid - San Agustin
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
15.50 miles Data4: MAD02 DC02
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
15.55 miles Data4: MAD02 DC03
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
15.56 miles Data4: MAD02 DC04
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
16.73 miles Nabiax: ADC 2
Nabiax has begun expansion works at its Alcalá de Henares data center. The Nabiax ADC2 facility has already undergone expansion in multiple phases.
16.74 miles Nabiax: Alcalá de Henares
Nabiax Alcalá Campus comprises two data center buildings ADC1 & ADC2. The facility is also known as CDG Telephone Alcalá de Henares. CDG is Centro Datos Gestionado, which is translated as Managed Data Center.
16.77 miles Adam MAD Alcala

AtlasEdge: Calle de Telemaco Data Center Photos

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019

Interxion's Data Centers in Madrid
Posted in Madrid

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019

Source: Silicon Alley Madrid

Operating Company

AtlasEdge Data Centres is a joint venture between Liberty Global and which plans to launch with approximately 100 Edge data centers across Europe. The JV will combine Digital Colony’s Edge assets and Liberty Global's real estate portfolio.

9 Facilities Owned
7 Markets Served
36.24 Megawatts
View Company