Edged Opens 36MW Data Center in Phoenix, Arizona
April 08, 2026
Edged Energy
BIL02 is the second building of Edged Energy's Bilbao-Arasur Campus. The Bilbao-Arasur Campus, located in the Arasur hub south of Bilbao, sits at a high-speed fiber junction. It features three data centers and an administrative building, with expansion potential.
| Distance | Site | About |
|---|---|---|
| 0.15 miles | Merlin: Bilbao-Arasur |
The Bilbao-Arasur Campus, located in the Arasur hub south of Bilbao, sits at a high-speed fiber junction. It features three data centers and an administrative building, with expansion potential.
|
| 0.16 miles | Edged Energy: Bilbao-Arasur BIL03 |
This advanced tech campus is situated in the Arasur industrial and logistics hub south of Bilbao, positioned at a junction of high-speed fiber networks.
|
| 0.18 miles | Hyperscale Data Center Request Dataset |
In 2024, Meta leased this data center from Spanish real estate company Merlin Properties, which was developed in collaboration with U.S.-based Edged Energy.
|
| 0.19 miles | Edged Energy: BIL01 |
BIL01 is the third building of Edged Energy's Bilbao-Arasur Campus.
|
April 08, 2026
Edged Energy
January 17, 2026
Edged Energy
November 21, 2025
Edged Energy
September 24, 2025
Edged Energy
August 08, 2025
Edged Energy
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas