Data Center Campus

Aligned: Salt Lake City Campus

3 sites Salt Lake City
OperationalPlanned
Operational with future phases planned
Operated by:

Campus at a Glance

3 data centers on this campus
First built in 2018
Total building size: 1,013,500 SqFt
Coordinates: 40.58604, -111.96991
░░░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░ Request Dataset MW
Planned

Aligned's Salt Lake City data center campus spans 55 acres and comprises three facilities, including a dedicated on-site substation. The former Fairchild Semiconductor chip fabrication facility was renovated to become a colocation data center in 2018.

  • SLC-01, renovated in 2018, spans 300,000 sq ft (27,900 sqm) and has 34MW of capacity.
  • Aligned opened its SLC-02 facility on the same campus in March 2021. The facility, built on a greenfield site, has 48MW power, expandable to 60MW, and 240,000 sq ft (22,300 sqm) of space.
  • SLC-03 project will add more 80MW of capacity to the campus.
  • As well as the three-facility campus, Aligned also has another build-to-suit data center in the Salt Lake Metro Area known as SLC-04.

SLC-01 Data Center Facts:

POWER

  • Diverse and dedicated substations
  • N+1 power generation
  • Redundant A+B distribution
  • Revenue-grade metering
  • Up to 50 kW per rack

NETWORK

  • Two diverse points of entry, per build
  • Carrier-neutral
  • On-net Carriers
  • Cogent
  • Comcast
  • FirstDigital Telecom
  • Lumen
  • PacketFabric
  • Verizon
  • Zayo
  • Near-net Carriers
  • Comcast
  • Four diverse meet-me rooms

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Aligned: SLC-01 Aligned
Operational
░░░░ Request Dataset MW 293,500 SqFt 2018
Aligned SLC-02 Aligned
OperationalPlanned
░░░░ Request Dataset MW 240,000 SqFt 2021
Aligned SLC-03 Aligned
Operational
░░░░ Request Dataset MW 480,000 SqFt 2022

Map and Nearby Locations

Aligned: Salt Lake City Campus Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

Aligned Data Centers is an infrastructure technology company that offers colocation and build-to-scale solutions to cloud, enterprise, and managed service providers.

In early 2022, Aligned Energy was rebranded to Aligned Data Centers.

0
Facilities
0
Markets

News

Read Aligned Launches 2nd Salt Lake Facility
Aligned Launches 2nd Salt Lake Facility

Aligned Launches 2nd Salt Lake Facility

March 10, 2021 Aligned: SLC-01

Aligned recently announced the completion of its second data center in the Salt Lake Metro Area, West Jordan, UT. The 48 MW (expandable to 60MW), 240,000 square-foot facility will feature Aligned’s patented cooling technology, which consumes 80% less energy and 85% less water than traditional...

Read more
Read Aligned Breaks Ground on Second Salt Lake Metro Data Center (PR)
Aligned Breaks Ground on Second Salt Lake Metro Data Center (PR)

Aligned Breaks Ground on Second Salt Lake Metro Data Center (PR)

October 30, 2019 Aligned: SLC-01

WEST JORDAN, UT (October 30, 2019) – Aligned, a leading data center provider offering innovative, sustainable and adaptable colocation and build-to-scale solutions for cloud, enterprise, and managed service providers, announces the expansion of its Salt Lake Metro data center campus, breaking...

Read more