Nürnberg Süd grew in building sections. The second section, opened in 2022, added about 4,000 m² of IT space with room for up to 2,600 racks. The existing buildings use KyotoCooling, a heat-wheel design that runs without conventional compressors more than 90% of the time, with cold and hot areas separated by enclosures and a return-air plenum in the false ceiling. The campus takes its grid power through two separate substations and is an access point for the N-IX internet exchange.
The third section, BA3, is a three-storey modular building beside the south campus with about 9,600 m² of IT space. It is designed around power pods of 600 to 1,200 kW, direct liquid cooling for racks of up to 1,000 kW and 800 V HVDC power distribution, and noris plans customer move-in for 2027.
Site History
- July 2022: The second building section (BA2) officially opens.
- 2012: noris commissions the first building section (BA1).