Mapletree: N15 W24250 Riverwood

Latest Podcast N15 W24250 Riverwood Dr
OperationalPlanned
Operational with future phases planned
Operated by:

Mapletree: N15 W24250 Riverwood

Year Built: 1985
Utility Provider: We Energies
Ownership: Mapletree Redwood Data Centre Trust owns the building.
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Site History

  • 1985: The data center was built.
  • 2013: AT&T sold the building to Carter Validus Mission Critical REIT for $51.8 million and leased it back for 10 years.
  • 2017: Hudson DC Assets acquired the building.
  • 2020: Mapletree acquired the facility.
  • 2024: After AT&T left, the building came to market for lease as a data center.

Project Profile

  • Owner: Mapletree (Hudson DC Assets LLC)
  • Building: 142,952 sq ft on 13.7 acres: about 40,000 sq ft of raised floor and a 102,952 sq ft office and mechanical wing
  • Infrastructure: 24.9 kV We Energies service, six diesel generators, four centrifugal chillers and four cooling towers
  • Status: vacant, available for lease

Map and Nearby Locations

N15 W24250 Riverwood Dr
Mapletree Redwood Data Centre Trust Sites
Nearby Facilities

Mapletree: N15 W24250 Riverwood Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Mapletree: N15 W24250 Riverwood

Distance Site About
2.89 miles Lumen Milwaukee 1
2.95 miles AT&T: 220 Wisconsin Ave, Waukesha
4.75 miles Fiserv: Brookfield
Fiserv runs a data center in its former headquarters campus at 255 Fiserv Drive in Brookfield, Wisconsin. Fiserv kept the data center when it moved its headquarters to downtown Milwaukee in 2023, and put the 186,000 sq ft campus up for sale in 2024.
6.50 miles AT&T: 405 N Fairway Dr
7.36 miles AT&T: W277 S4747 Saylesville Rd
7.50 miles Verizon Wireless: New Berlin
7.52 miles Windstream Brookfield
10.96 miles AT&T: 5825 N 99th St
AT&T built a mobile switching center at 5825 North 99th Street in Milwaukee in 1995. The site closed and sold at the end of 2025, and the 29,500 sq ft building now markets for sale or lease as the 99th Street Technology Center.
11.79 miles AT&T: 6812 Aetna Ct
12.00 miles AT&T: 7721 W Fond du Lac Ave
12.71 miles Affordable Family Storage: Midtown Milwaukee
Affordable Family Storage proposed a 19,000 sq ft computing facility inside the former Walmart at 5825 West Hope Avenue in Milwaukee's Midtown neighborhood. It dropped the data center in July 2026 after community opposition, and the redevelopment went ahead with housing, a library branch and self-storage.
12.82 miles Ethoplex
13.08 miles Aventus: Milwaukee (Lakes)
Aventus Lakes is a Tier III, SOC 2 Type 2 colocation facility in the Granville Station area of Milwaukee, Wisconsin, in a 26,432 sq ft building-in-a-building masonry structure on 2 acres. In data-center use since about 2007 (formerly VCPI/Agility Colo) and acquired by Aventus Data Centers (a division of Vincent Companies) in 2022, it offers single-cabinet, cage, and private-suite colocation.
13.95 miles TierPoint Milwaukee-Burnham
TierPoint runs a Tier III colocation and business-continuity data center at 3701 West Burnham Street on Milwaukee's south side. The site came to TierPoint with its 2016 purchase of Cosentry and offers about 3,600 sq ft of raised floor.
14.00 miles Data Holdings Milwaukee
Data Holdings runs a Tier III colocation data center at 3135 West Highland Boulevard in Milwaukee. The Forest County Potawatomi Community owns the business. The two-story building opened in 2013, added a 7,500 sq ft suite in 2019 and has hosted the MKE-IX internet exchange since 2025.
14.42 miles AT&T: 918 N 26th St
15.61 miles Johnson Controls: Glendale
15.74 miles FIS: Brown Deer
FIS owns a data center on its 20-acre former Metavante campus at 4900 West Brown Deer Road in Brown Deer, Wisconsin, north of Milwaukee. Ascent operates the facility.
16.21 miles Vaultas Milwaukee
16.36 miles AT&T: 722 N Broadway
AT&T's Broadway central office at 722-740 North Broadway in downtown Milwaukee is the main telephone exchange of Wisconsin Bell and its former headquarters. Reign Capital bought the 20-story 1930 tower and its 1953 annex in 2021, and AT&T leases them back.
16.38 miles Netwurx 324 E Wisconsin
16.39 miles Cogent: 324 E Wisconsin
16.39 miles 1547: Wells Building
The Wells Building at 324 East Wisconsin Avenue is a 15-story carrier hotel in downtown Milwaukee. 1547 Critical Systems Realty bought the 1901 building in 2020 and runs it as a multi-tenant data center and interconnection hub.
16.39 miles TSR 324 E Wisconsin
16.44 miles Cogent: Milwaukee 2
Cogent Communications runs its Milwaukee 2 data center at 2915 South 5th Court in Milwaukee's Bay View area, in a former Sprint network building. The site offers about 3,900 sq ft of colocation with UPS and generator backup.
16.51 miles Windstream Milwaukee
17.24 miles Northwestern Mutual: Franklin
18.22 miles MilwaukeeColo
18.32 miles Expedient Franklin
Expedient runs MKE1, its Milwaukee-area data center, at 4777 West Ironwood Drive in Franklin, Wisconsin. Expedient opened the former Harley-Davidson data center in 2021 and leases the whole building from StratCap Data Centers.
18.32 miles StratCap: 4777 Ironwood
4777 West Ironwood Drive in Franklin, Wisconsin, is a 28,500 sq ft data center built in 2008 for Harley-Davidson. StratCap Data Centers bought it in 2022, and Expedient leases the whole building as its Milwaukee facility.

Operating Company

Operated by:
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine
Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected tax...

Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine

October 12, 2026 Microsoft Azure

Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected taxable value by about 24 percent, or nearly $1.9 billion, the Milwaukee Business Journal reported...

Read more
Read Mapletree has Sold a Data Center in Philadelphia
 Mapletree has Sold a Data Center in Philadelphia

Mapletree has Sold a Data Center in Philadelphia

May 27, 2026 Mapletree Redwood Data Centre Trust

Mapletree Industrial Trust is divesting a data center in Philadelphia. The company announced this week that it has entered into a purchase and sale agreement, through an affiliate, for the proposed sale of the facility located at 2000 Kubach Road. The property is being acquired by an unnamed...

Read more
Read Japan Data Facility Purchased by Mapletree Industrial Trust
Japan Data Facility Purchased by Mapletree Industrial Trust

Japan Data Facility Purchased by Mapletree Industrial Trust

May 26, 2023 Mapletree Redwood Data Centre Trust

The acquisition of a data center in Osaka, Japan, signifies Mapletree Industrial Trust's entrance into the Japanese data center market. This week, the manager of Mapletree Industrial Trust (MIT), Mapletree Industrial Trust Management Ltd., announced the purchase of a recently constructed data...

Read more
Read Mapletree acquires Lumen’s Minnesota data center for $26 million
Mapletree acquires Lumen’s Minnesota data center for $26 million

Mapletree acquires Lumen’s Minnesota data center for $26 million

August 18, 2021 Lumen Minnetonka

As part of its acquisition of Sila Realty Trust’s data center portfolio, Mapletree Investment Trust has also acquired a Lumen data center in Minnesota. The facility is at 5400-5500 Feltl Road inside the Opus Business Park, Minnetonka. It is reported that Sila paid $26 million for the facility....

Read more
Read Data center merger and acquisition activities in Q2 of 2021
Data center merger and acquisition activities in Q2 of 2021

Data center merger and acquisition activities in Q2 of 2021

August 16, 2021 Mapletree Redwood Data Centre Trust

2021 has been an eventful year in the data center industry as we’ve seen some major merger and acquisition activities as these firms look to expand their capacities. We are going to shine the spotlight on the top five merger and acquisition activities in Q2 of 2021. We’ll be able to see which...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.