Fiserv: Brookfield

Latest Podcast 255 Fiserv Dr
Operational
Fully operational facility
Operated by:

Fiserv: Brookfield

Year Built: 1992
Utility Provider: We Energies
Lot Size: 18 acres
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power

Site History

  • 1992: The three-story south building opened.
  • 1998: The two-story north building was added.
  • 2023: Fiserv moved its headquarters to downtown Milwaukee and kept the Brookfield data center, citing the cost of moving its IT.
  • March 2024: Fiserv listed the campus for sale as office and data center space.

Project Profile

  • Owner and operator: Fiserv
  • Buildings: two connected buildings of 122,800 and 64,000 sq ft on about 18 acres
  • Use: enterprise data center and offices
  • Utility: We Energies

Map and Nearby Locations

255 Fiserv Dr
Fiserv (First Data) Sites
Nearby Facilities

Fiserv: Brookfield Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Fiserv: Brookfield

Distance Site About
1.82 miles AT&T: 405 N Fairway Dr
2.79 miles Windstream Brookfield
3.38 miles Verizon Wireless: New Berlin
3.76 miles Lumen Milwaukee 1
4.75 miles Mapletree: N15 W24250 Riverwood
N15 W24250 Riverwood Drive in Pewaukee, Wisconsin, is a two-story, 142,952 sq ft data center built in 1985 with about 40,000 sq ft of raised floor. AT&T used the building for decades. It is now vacant and offered for lease.
4.81 miles AT&T: 220 Wisconsin Ave, Waukesha
7.23 miles AT&T: 6812 Aetna Ct
8.14 miles AT&T: 5825 N 99th St
AT&T built a mobile switching center at 5825 North 99th Street in Milwaukee in 1995. The site closed and sold at the end of 2025, and the 29,500 sq ft building now markets for sale or lease as the 99th Street Technology Center.
8.69 miles AT&T: 7721 W Fond du Lac Ave
8.85 miles Affordable Family Storage: Midtown Milwaukee
Affordable Family Storage proposed a 19,000 sq ft computing facility inside the former Walmart at 5825 West Hope Avenue in Milwaukee's Midtown neighborhood. It dropped the data center in July 2026 after community opposition, and the redevelopment went ahead with housing, a library branch and self-storage.
9.21 miles TierPoint Milwaukee-Burnham
TierPoint runs a Tier III colocation and business-continuity data center at 3701 West Burnham Street on Milwaukee's south side. The site came to TierPoint with its 2016 purchase of Cosentry and offers about 3,600 sq ft of raised floor.
9.45 miles Data Holdings Milwaukee
Data Holdings runs a Tier III colocation data center at 3135 West Highland Boulevard in Milwaukee. The Forest County Potawatomi Community owns the business. The two-story building opened in 2013, added a 7,500 sq ft suite in 2019 and has hosted the MKE-IX internet exchange since 2025.
9.59 miles AT&T: W277 S4747 Saylesville Rd
9.86 miles AT&T: 918 N 26th St
10.48 miles Aventus: Milwaukee (Lakes)
Aventus Lakes is a Tier III, SOC 2 Type 2 colocation facility in the Granville Station area of Milwaukee, Wisconsin, in a 26,432 sq ft building-in-a-building masonry structure on 2 acres. In data-center use since about 2007 (formerly VCPI/Agility Colo) and acquired by Aventus Data Centers (a division of Vincent Companies) in 2022, it offers single-cabinet, cage, and private-suite colocation.
11.66 miles Vaultas Milwaukee
11.69 miles Cogent: Milwaukee 2
Cogent Communications runs its Milwaukee 2 data center at 2915 South 5th Court in Milwaukee's Bay View area, in a former Sprint network building. The site offers about 3,900 sq ft of colocation with UPS and generator backup.
11.78 miles AT&T: 722 N Broadway
AT&T's Broadway central office at 722-740 North Broadway in downtown Milwaukee is the main telephone exchange of Wisconsin Bell and its former headquarters. Reign Capital bought the 20-story 1930 tower and its 1953 annex in 2021, and AT&T leases them back.
11.80 miles Netwurx 324 E Wisconsin
11.80 miles 1547: Wells Building
The Wells Building at 324 East Wisconsin Avenue is a 15-story carrier hotel in downtown Milwaukee. 1547 Critical Systems Realty bought the 1901 building in 2020 and runs it as a multi-tenant data center and interconnection hub.
11.80 miles Cogent: 324 E Wisconsin
11.81 miles TSR 324 E Wisconsin
11.93 miles Windstream Milwaukee
12.02 miles Johnson Controls: Glendale
12.85 miles Northwestern Mutual: Franklin
13.21 miles FIS: Brown Deer
FIS owns a data center on its 20-acre former Metavante campus at 4900 West Brown Deer Road in Brown Deer, Wisconsin, north of Milwaukee. Ascent operates the facility.
13.42 miles Ethoplex
14.31 miles MilwaukeeColo
14.37 miles Expedient Franklin
Expedient runs MKE1, its Milwaukee-area data center, at 4777 West Ironwood Drive in Franklin, Wisconsin. Expedient opened the former Harley-Davidson data center in 2021 and leases the whole building from StratCap Data Centers.
14.38 miles StratCap: 4777 Ironwood
4777 West Ironwood Drive in Franklin, Wisconsin, is a 28,500 sq ft data center built in 2008 for Harley-Davidson. StratCap Data Centers bought it in 2022, and Expedient leases the whole building as its Milwaukee facility.

Fiserv: Brookfield Data Center Photos See all

First Data and Fiserv merged in 2019
Source: Baxtel

Operating Company

Operated by:

Fiserv, Inc. (NASDAQ: FISV) is a leading global technology provider serving the financial services industry, driving innovation in payments, processing services, risk and compliance, customer and channel management, and business insights and optimization.

0
Facilities
0
Markets

News See all

Read Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine
Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected tax...

Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine

October 12, 2026 Microsoft Azure

Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected taxable value by about 24 percent, or nearly $1.9 billion, the Milwaukee Business Journal reported...

Read more
Read Fiserv Will Maintain its Data Center in Brookfield, Wisconsin
Fiserv Will Maintain its Data Center in Brookfield, Wisconsin

Fiserv Will Maintain its Data Center in Brookfield, Wisconsin

February 23, 2023 Fiserv (First Data)

Fintech and payments company Fiserv will maintain its data center in Brookfield, Wisconsin, following the relocation of its headquarters to downtown Milwaukee. As per BizJournal, the decision to maintain the data center and its personnel in Brookfield results from the "prohibitive...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.