Ethoplex

Latest Podcast N115 W19150 Edison Dr
Operational
Fully operational facility
Operated by:

Ethoplex

Utility Provider: We Energies
░░░ Request Dataset MW
Operational Power

Map and Nearby Locations

N115 W19150 Edison Dr
Ethoplex Sites
Nearby Facilities

Sites within 15 miles of Ethoplex

Distance Site About
8.71 miles Aventus: Milwaukee (Lakes)
Aventus Lakes is a Tier III, SOC 2 Type 2 colocation facility in the Granville Station area of Milwaukee, Wisconsin, in a 26,432 sq ft building-in-a-building masonry structure on 2 acres. In data-center use since about 2007 (formerly VCPI/Agility Colo) and acquired by Aventus Data Centers (a division of Vincent Companies) in 2022, it offers single-cabinet, cage, and private-suite colocation.
9.09 miles AT&T: 5825 N 99th St
AT&T built a mobile switching center at 5825 North 99th Street in Milwaukee in 1995. The site closed and sold at the end of 2025, and the 29,500 sq ft building now markets for sale or lease as the 99th Street Technology Center.
9.40 miles FIS: Brown Deer
FIS owns a data center on its 20-acre former Metavante campus at 4900 West Brown Deer Road in Brown Deer, Wisconsin, north of Milwaukee. Ascent operates the facility.
10.48 miles AT&T: 7721 W Fond du Lac Ave
10.56 miles Lumen Milwaukee 1
12.39 miles Affordable Family Storage: Midtown Milwaukee
Affordable Family Storage proposed a 19,000 sq ft computing facility inside the former Walmart at 5825 West Hope Avenue in Milwaukee's Midtown neighborhood. It dropped the data center in July 2026 after community opposition, and the redevelopment went ahead with housing, a library branch and self-storage.
12.72 miles Johnson Controls: Glendale
12.82 miles Mapletree: N15 W24250 Riverwood
N15 W24250 Riverwood Drive in Pewaukee, Wisconsin, is a two-story, 142,952 sq ft data center built in 1985 with about 40,000 sq ft of raised floor. AT&T used the building for decades. It is now vacant and offered for lease.
13.42 miles Fiserv: Brookfield
Fiserv runs a data center in its former headquarters campus at 255 Fiserv Drive in Brookfield, Wisconsin. Fiserv kept the data center when it moved its headquarters to downtown Milwaukee in 2023, and put the 186,000 sq ft campus up for sale in 2024.
13.51 miles AT&T: 405 N Fairway Dr
14.16 miles Windstream Brookfield
14.88 miles AT&T: 6812 Aetna Ct
15.62 miles AT&T: 220 Wisconsin Ave, Waukesha
16.00 miles Data Holdings Milwaukee
Data Holdings runs a Tier III colocation data center at 3135 West Highland Boulevard in Milwaukee. The Forest County Potawatomi Community owns the business. The two-story building opened in 2013, added a 7,500 sq ft suite in 2019 and has hosted the MKE-IX internet exchange since 2025.
16.34 miles AT&T: 918 N 26th St
16.52 miles Verizon Wireless: New Berlin
17.38 miles Vaultas Milwaukee
17.75 miles AT&T: 722 N Broadway
AT&T's Broadway central office at 722-740 North Broadway in downtown Milwaukee is the main telephone exchange of Wisconsin Bell and its former headquarters. Reign Capital bought the 20-story 1930 tower and its 1953 annex in 2021, and AT&T leases them back.
17.76 miles TierPoint Milwaukee-Burnham
TierPoint runs a Tier III colocation and business-continuity data center at 3701 West Burnham Street on Milwaukee's south side. The site came to TierPoint with its 2016 purchase of Cosentry and offers about 3,600 sq ft of raised floor.
17.78 miles Cogent: 324 E Wisconsin
17.79 miles Netwurx 324 E Wisconsin
17.79 miles 1547: Wells Building
The Wells Building at 324 East Wisconsin Avenue is a 15-story carrier hotel in downtown Milwaukee. 1547 Critical Systems Realty bought the 1901 building in 2020 and runs it as a multi-tenant data center and interconnection hub.
17.79 miles TSR 324 E Wisconsin
17.85 miles Windstream Milwaukee

Operating Company

Operated by:

Ethoplex is a Wireless Internet Service Provider offering High-Speed Internet Access and Colocation

0
Facilities
0
Markets

News See all

Read Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine
Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected tax...

Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine

October 12, 2026 Microsoft Azure

Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected taxable value by about 24 percent, or nearly $1.9 billion, the Milwaukee Business Journal reported...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.