Aventus: Milwaukee (Lakes)

Latest Podcast 7901 W Clinton Ave
OperationalPlannedProspective Expansion
Fully operational facility with future phases planned and prospective expansion planned
Operated by:

Aventus: Milwaukee (Lakes)

Year Built: 2007
Utility Provider: We Energies
Lot Size: 2 acres
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Aventus Lakes is a Tier III colocation facility in the Granville Station area of north Milwaukee, run by Aventus Data Centers, a division of Vincent Companies. It offers single-cabinet, cage and private-suite colocation. The 26,432 sq ft masonry building-in-a-building has a 4,900 sq ft primary vault with raised floor and hot/cold aisles, plus a 4,000 sq ft air-cooled expansion vault.

Site History

  • Nov 2022 — Acquired by Aventus Data Centers (division of Vincent Companies)
  • ~2007 — Data center operations begin (originally VCPI / Agility Colo)
  • 1974 — Building constructed (masonry, building-in-a-building)

Project Profile

  • Power: No behind-the-meter generation. Backup: dual full-load diesel generators and dual UPS (concurrent maintenance). 4,000 A underground utility feed from We Energies.
  • Carriers: Lumen (two entrances), AT&T, WIN; four disparate carrier entrances; dark fiber available
  • Certifications: SOC 2 Type 2, HIPAA, FDIC, Wisconsin Act 73
  • Security: fenced perimeter, security gates, tailgate-detection vestibule, video surveillance; automatic FE25 fire suppression

Map and Nearby Locations

7901 W Clinton Ave
Aventus Data Centers Sites
Nearby Facilities

Aventus: Milwaukee (Lakes) Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Aventus: Milwaukee (Lakes)

Distance Site
2.34 miles AT&T: 5825 N 99th St
2.54 miles AT&T: 7721 W Fond du Lac Ave
2.73 miles FIS: Brown Deer
4.06 miles Johnson Controls: Glendale
4.22 miles Affordable Family Storage: Midtown Milwaukee
7.58 miles AT&T: 6812 Aetna Ct
7.92 miles Data Holdings Milwaukee
8.18 miles AT&T: 918 N 26th St
8.71 miles Ethoplex
8.89 miles Vaultas Milwaukee
9.29 miles AT&T: 722 N Broadway
9.32 miles Cogent: 324 E Wisconsin
9.32 miles 1547: Wells Building
9.32 miles Netwurx 324 E Wisconsin
9.33 miles TSR 324 E Wisconsin
9.36 miles Windstream Brookfield
9.36 miles Windstream Milwaukee
9.38 miles AT&T: 405 N Fairway Dr
10.11 miles TierPoint Milwaukee-Burnham
10.20 miles Lumen Milwaukee 1
10.48 miles Fiserv: Brookfield
12.00 miles Cogent: Milwaukee 2
12.22 miles Verizon Wireless: New Berlin
13.08 miles Mapletree: N15 W24250 Riverwood
14.80 miles AT&T: 220 Wisconsin Ave, Waukesha
17.05 miles Northwestern Mutual: Franklin
19.80 miles AT&T: W277 S4747 Saylesville Rd
19.97 miles Expedient Franklin
19.97 miles StratCap: 4777 Ironwood

Operating Company

Operated by:
0
Facilities
0
Markets

News See all

Read Potawatomi Seeks Milwaukee Data Center Expansion Up To 59,000 Sq Ft
Data Holdings, the Forest County Potawatomi Community's data center business, has filed a zoning request to expand its [Milwaukee](https://baxtel.com/regions/milwaukee) facility, [the Milwaukee Jou...

Potawatomi Seeks Milwaukee Data Center Expansion Up To 59,000 Sq Ft

November 12, 2026 Data Holdings

Data Holdings, the Forest County Potawatomi Community's data center business, has filed a zoning request to expand its Milwaukee facility, the Milwaukee Journal Sentinel reported. The application describes an expansion of up to 59,000 square feet beside the existing 46,000-square-foot data...

Read more
Read Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine
Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected tax...

Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine

October 12, 2026 Microsoft Azure

Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected taxable value by about 24 percent, or nearly $1.9 billion, the Milwaukee Business Journal reported...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.