Aventus: Milwaukee (Lakes)

Latest Podcast 7901 W Clinton Ave
OperationalPlannedProspective Expansion
Fully operational facility with future phases planned and prospective expansion planned
Operated by:

Aventus: Milwaukee (Lakes)

Year Built: 2007
Utility Provider: We Energies
Lot Size: 2 acres
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Aventus Lakes is a Tier III colocation facility in the Granville Station area of north Milwaukee, run by Aventus Data Centers, a division of Vincent Companies. It offers single-cabinet, cage and private-suite colocation. The 26,432 sq ft masonry building-in-a-building has a 4,900 sq ft primary vault with raised floor and hot/cold aisles, plus a 4,000 sq ft air-cooled expansion vault.

Site History

  • Nov 2022 — Acquired by Aventus Data Centers (division of Vincent Companies)
  • ~2007 — Data center operations begin (originally VCPI / Agility Colo)
  • 1974 — Building constructed (masonry, building-in-a-building)

Project Profile

  • Power: No behind-the-meter generation. Backup: dual full-load diesel generators and dual UPS (concurrent maintenance). 4,000 A underground utility feed from We Energies.
  • Carriers: Lumen (two entrances), AT&T, WIN; four disparate carrier entrances; dark fiber available
  • Certifications: SOC 2 Type 2, HIPAA, FDIC, Wisconsin Act 73
  • Security: fenced perimeter, security gates, tailgate-detection vestibule, video surveillance; automatic FE25 fire suppression

Map and Nearby Locations

7901 W Clinton Ave
Aventus Data Centers Sites
Nearby Facilities

Aventus: Milwaukee (Lakes) Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Aventus: Milwaukee (Lakes)

Distance Site About
2.34 miles AT&T: 5825 N 99th St
AT&T built a mobile switching center at 5825 North 99th Street in Milwaukee in 1995. The site closed and sold at the end of 2025, and the 29,500 sq ft building now markets for sale or lease as the 99th Street Technology Center.
2.54 miles AT&T: 7721 W Fond du Lac Ave
2.73 miles FIS: Brown Deer
FIS owns a data center on its 20-acre former Metavante campus at 4900 West Brown Deer Road in Brown Deer, Wisconsin, north of Milwaukee. Ascent operates the facility.
4.06 miles Johnson Controls: Glendale
4.22 miles Affordable Family Storage: Midtown Milwaukee
Affordable Family Storage proposed a 19,000 sq ft computing facility inside the former Walmart at 5825 West Hope Avenue in Milwaukee's Midtown neighborhood. It dropped the data center in July 2026 after community opposition, and the redevelopment went ahead with housing, a library branch and self-storage.
7.58 miles AT&T: 6812 Aetna Ct
7.92 miles Data Holdings Milwaukee
Data Holdings runs a Tier III colocation data center at 3135 West Highland Boulevard in Milwaukee. The Forest County Potawatomi Community owns the business. The two-story building opened in 2013, added a 7,500 sq ft suite in 2019 and has hosted the MKE-IX internet exchange since 2025.
8.18 miles AT&T: 918 N 26th St
8.71 miles Ethoplex
8.89 miles Vaultas Milwaukee
9.29 miles AT&T: 722 N Broadway
AT&T's Broadway central office at 722-740 North Broadway in downtown Milwaukee is the main telephone exchange of Wisconsin Bell and its former headquarters. Reign Capital bought the 20-story 1930 tower and its 1953 annex in 2021, and AT&T leases them back.
9.32 miles Cogent: 324 E Wisconsin
9.32 miles 1547: Wells Building
The Wells Building at 324 East Wisconsin Avenue is a 15-story carrier hotel in downtown Milwaukee. 1547 Critical Systems Realty bought the 1901 building in 2020 and runs it as a multi-tenant data center and interconnection hub.
9.32 miles Netwurx 324 E Wisconsin
9.33 miles TSR 324 E Wisconsin
9.36 miles Windstream Brookfield
9.36 miles Windstream Milwaukee
9.38 miles AT&T: 405 N Fairway Dr
10.11 miles TierPoint Milwaukee-Burnham
TierPoint runs a Tier III colocation and business-continuity data center at 3701 West Burnham Street on Milwaukee's south side. The site came to TierPoint with its 2016 purchase of Cosentry and offers about 3,600 sq ft of raised floor.
10.20 miles Lumen Milwaukee 1
10.48 miles Fiserv: Brookfield
Fiserv runs a data center in its former headquarters campus at 255 Fiserv Drive in Brookfield, Wisconsin. Fiserv kept the data center when it moved its headquarters to downtown Milwaukee in 2023, and put the 186,000 sq ft campus up for sale in 2024.
12.00 miles Cogent: Milwaukee 2
Cogent Communications runs its Milwaukee 2 data center at 2915 South 5th Court in Milwaukee's Bay View area, in a former Sprint network building. The site offers about 3,900 sq ft of colocation with UPS and generator backup.
12.22 miles Verizon Wireless: New Berlin
13.08 miles Mapletree: N15 W24250 Riverwood
N15 W24250 Riverwood Drive in Pewaukee, Wisconsin, is a two-story, 142,952 sq ft data center built in 1985 with about 40,000 sq ft of raised floor. AT&T used the building for decades. It is now vacant and offered for lease.
14.80 miles AT&T: 220 Wisconsin Ave, Waukesha
17.05 miles Northwestern Mutual: Franklin
19.80 miles AT&T: W277 S4747 Saylesville Rd
19.97 miles Expedient Franklin
Expedient runs MKE1, its Milwaukee-area data center, at 4777 West Ironwood Drive in Franklin, Wisconsin. Expedient opened the former Harley-Davidson data center in 2021 and leases the whole building from StratCap Data Centers.
19.97 miles StratCap: 4777 Ironwood
4777 West Ironwood Drive in Franklin, Wisconsin, is a 28,500 sq ft data center built in 2008 for Harley-Davidson. StratCap Data Centers bought it in 2022, and Expedient leases the whole building as its Milwaukee facility.

Operating Company

Operated by:
0
Facilities
0
Markets

News See all

Read Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine
Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected tax...

Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine

October 12, 2026 Microsoft Azure

Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected taxable value by about 24 percent, or nearly $1.9 billion, the Milwaukee Business Journal reported...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.