E11: Building India’s Digital Backbone with Sharad Agarwal
Mar 12, 2026 Eric Bell World
Go to PodcastLEG Centrum, a developer that entitles sites and delivers them as powered land or powered shells, plans a data center on the former Standards Testing Laboratories property on Harsh Avenue SE. The site sits south of Washington High School, next to the Crown Cork & Seal plant, and holds two existing laboratory buildings. The data center would use about 5,000 gallons of water a day.
The project needs the city to rezone the land from I-1 to I-2 industrial. The Planning Commission endorsed the change, and City Council expects to debate it for several weeks after a public hearing on December 14, 2026.
| Distance | Site | About |
|---|---|---|
| 2.41 miles | BitDeer: Massillon, OH |
Bitdeer's fully operational cryptocurrency mining campus in Massillon, Ohio, featuring multiple purpose-built mining buildings and a dedicated electrical substation connected to FirstEnergy's transmission network. The facility underwent phased development and energization throughout 2025 and 2026, including the reconstruction of two fire-damaged buildings, before reaching full operational capacity in October 2026.
|
| 3.76 miles | Panattoni: Perry Township DC |
The Perry Township Data Center is a planned multi building campus situated on a 100 acre site in Stark County, Ohio, developed by Panattoni Development Company.
|
| 3.77 miles | Hyperscale Data CenterInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 4.67 miles | Ark: Canton |
The facility is a colocation data center delivering 1.5 Megawatts of existing capacity expandable to 3.0 Megawatts.
|
| 7.23 miles | Corscale: Midwest Digital Gateway |
Corscale's Midwest Digital Gateway is a planned four-building hyperscale campus at Millerton Street SE and Central Avenue SE in southeast Canton, Ohio.
|
| 8.96 miles | Real Estate Data CenterInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 9.65 miles | DAMAC: Canton Orchard View |
DAMAC Digital's Canton Orchard View project is a planned two-building data center at Trump Avenue SE and Orchard View Drive SE in southeast Canton, Ohio.
|
| 17.29 miles | Quantum HPC: Norton DC |
A proposal to build Project Triton, a data center, at a former mine in Norton City, Ohio, was canceled following strong opposition from local community groups.
|
| 18.06 miles | HPC Data CenterInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 18.06 miles | Crypto Mining Data CenterInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 18.53 miles | Ark: Akron |
|
| 19.33 miles | Lumen Akron 2 |
LEG Centrum is a privately held company based in Westlake, Ohio. It finds and controls sites, manages zoning, permitting and municipal approvals, and plans the power and utility infrastructure a site needs. It then delivers each project as entitled land, powered land, or a completed powered shell ready for fit-out.
In 2026, LEG Centrum proposed a data center at a former testing laboratory at 1835 and 1845 Harsh Avenue SE in Massillon, Ohio, a site of about 10 acres that it is in line to buy. The Massillon Planning Commission recommended rezoning the site for heavier industrial use in October 2026.
Mar 12, 2026 Eric Bell World
Go to Podcast
Jan 15, 2026 Eric Bell Applied Digital
Go to Podcast
Jan 05, 2026 Eric Bell Dallas
Go to Podcast
Sep 04, 2025 Eric Bell Texas
Go to PodcastTell us what you're looking for. We respond within one business day.