Go to PodcastA proposal to build Project Triton, a data center, at a former mine in Norton City, Ohio, was canceled following strong opposition from local community groups. The developer, Quantum HPC, had planned a 485,000-square-foot center and a 157,000-square-foot power yard with six natural gas turbines on the 90-acre site off South Cleveland-Massillon Road. The property was the former PPG Industries limestone mine, which closed about 50 years ago.
| Distance | Site | About |
|---|---|---|
| 7.19 miles | Ark: Akron |
|
| 8.08 miles | AT&T: 50 W Bowery St |
AT&T's central office on West Bowery Street in downtown Akron, Ohio, is a seven-story telephone exchange that AT&T leases back after a 2025 sale.
|
| 8.31 miles | FairlawnGig: Fairlawn |
FairlawnGig, the City of Fairlawn's municipal broadband utility, runs a small colocation data center inside the city's service department building in Fairlawn, Ohio.
|
| 8.63 miles | Cogent: Akron |
Cogent Communications' Akron data center is a two-story telecom building in downtown Akron, Ohio, that Cogent offers for sale, net lease or wholesale colocation.
|
| 9.00 miles | Lumen Akron 2 | |
| 9.39 miles | HPC Data CenterInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 9.41 miles | Crypto Mining Data CenterInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 16.84 miles | Ark: Canton |
The facility is a colocation data center delivering 1.5 Megawatts of existing capacity expandable to 3.0 Megawatts.
|
| 17.29 miles | LEG Centrum: Massillon |
LEG Centrum proposes a data center on the former Standards Testing Laboratories site on Harsh Avenue SE in Massillon, Ohio, pending a rezoning.
|
| 17.71 miles | BitDeer: Massillon, OH |
Bitdeer's fully operational cryptocurrency mining campus in Massillon, Ohio, featuring multiple purpose-built mining buildings and a dedicated electrical substation connected to FirstEnergy's transmission network. The facility underwent phased development and energization throughout 2025 and 2026, including the reconstruction of two fire-damaged buildings, before reaching full operational capacity in October 2026.
|
| 18.83 miles | Cleveland Clinic Brecksville |
Cleveland Clinic's primary enterprise data center, built in Brecksville, Ohio, and in service since January 2012.
|
Mar 12, 2026 Eric Bell World
Go to Podcast
Jan 15, 2026 Eric Bell Applied Digital
Go to Podcast
Jan 05, 2026 Eric Bell Dallas
Go to Podcast
Sep 04, 2025 Eric Bell Texas
Go to PodcastTell us what you're looking for. We respond within one business day.