Bitdeer Massillon is a cryptocurrency mining facility located at 1115 Industrial Avenue SW in Massillon, Stark County, Ohio. Developed and operated by Bitdeer Technologies Group, the approximately 29.64-acre campus comprises multiple purpose-built mining buildings, supporting infrastructure, and a dedicated electrical substation supplied through FirstEnergy's transmission network.
The facility commenced operations in November 2025, with additional capacity brought online progressively throughout 2026. Development included electrical infrastructure upgrades, equipment installations, and the reconstruction of two buildings damaged by an earlier fire. By October 2026, Bitdeer had completed the facility's phased energization programme, bringing the entire campus into operation.