Utility Provider: Keravan Energia Sähköverkko; 2 × 110 kV line from Fingrid Anttila (Sipoo)

Site History

  • In June 2026, the regional permit authority decided the project needs no environmental impact assessment.
  • In May 2026, the detailed plan for the site became legally binding.

Project Profile

  • Developer: FCDC Corp Oy
  • Buildings: five data center buildings, built in phases
  • Backup power: UPS only, with no diesel generators

Map and Nearby Locations

Alikerava
FCDC Corp Oy Sites
Nearby Facilities

Sites within 15 miles of FCDC: Kerava

Distance Site About
3.34 miles Hetzner Finland
The entire site is 150,000 m², making it spacious enough to accommodate 20 data centers.
4.09 miles Verne: FL-HEL-DC03
This facility is part of Verne Global’s 'The Air' Campus, located in the Helsinki metropolitan area (Vantaa).
4.15 miles Verne: FL-HEL-DC02
This facility is part of Verne Global’s 'The Air' Campus, located in the Helsinki metropolitan area (Vantaa).
4.16 miles Verne: FL-HEL-DC01
Verne, the leading provider of sustainably powered HPC data centers across the Nordics, has acquired the land at its existing Helsinki data center campus, securing room for future expansion.
4.25 miles Verne: FL-HEL-DC04
This facility is part of Verne Global’s 'The Air' Campus, located in the Helsinki metropolitan area (Vantaa).
6.44 miles Brunswick: Heikinlaakso, Helsinki
This proposed data center development north of Helsinki is at the land-reservation and pre-zoning stage, filed by Brunswick Real Estate Finland Oy. The operator has not yet been disclosed and is expected to be named later in the planning process.
7.78 miles OnZero: Sipoo Söderkulla
OnZero operates a modular, liquid-cooled data center built from shipping containers at Keravan Energia's heating plant in Söderkulla, Sipoo. Its waste heat feeds the Söderkulla district heating network.
9.93 miles Prime: Järvenpää, Finland
US-based operator Prime Data Centers has announced plans for a significant expansion into Finland, targeting a 12-hectare site in the Vähänummi industrial area of Järvenpää.
10.80 miles Equinix Helsinki HE5
11.00 miles Hyperco: Vantaa
Hyperco owns the data center building at Myllynkivenkuja 4 in Vantaa, which houses Equinix HE4 and Thales. Hyperco has been part of DAMAC's data center business since 2025.
11.04 miles Equinix Helsinki HE4
12.85 miles Digita: Helsinki Data Center 2 (Pieni Paja)
Digita Helsinki Data Center 2, known as Pieni Paja, is a colocation data center on the Pasila campus at Televisiokatu 2 in Helsinki. It opened in 2023 next to Digita's original Pasila data center.
12.87 miles Digita Pasila Broadcasting Tower
12.90 miles Telia Pitäjänmäki (Nebula Oy)
The facility was acquired by Telia when it acquired Nebula Oy in 2017. The Nebula server room in the building has since closed.
12.94 miles atNorth: FIN01
FIN01 is located in the Vallila area of Helsinki with a gross space of 1,200 sqm.
12.96 miles Atomidata: Helsinki
Atomidata operates a small colocation data center at Valimotie 13A in Pitäjänmäki, Helsinki.
13.00 miles Creanova: Helsinki
Creanova operates a carrier-neutral colocation data center at Hiomotie 10 in Pitäjänmäki, Helsinki. The facility opened in 1996.
13.03 miles Equinix Helsinki HE1
13.03 miles Mediam Helsiki Data Center
13.06 miles Elisa Helsinki Pasila
13.08 miles Verda: Helsinki (Telia HDC)
Verda runs GPU cloud capacity inside Telia Helsinki Data Center in Pitäjänmäki, Helsinki, which Telia resells as Telia Sovereign AI Cloud.
13.09 miles Telia Helsinki Pitäjänmäki
The site is powered by 100 percent renewable energy and will recycle waste heat from the servers, producing 200,000 MWh per year - enough heat to supply 20,000 homes in the nearby town of Espoo.
13.09 miles Gcore: Helsinki (Telia HDC)
Gcore runs an AI GPU cloud cluster inside Telia Helsinki Data Center in Pitäjänmäki, Helsinki.
13.11 miles UpCloud: Helsinki FI-HEL2
UpCloud's FI-HEL2 cloud zone runs inside Telia Helsinki Data Center in Pitäjänmäki, Helsinki, and includes the company's GPU servers.
13.25 miles Equinix Helsinki HE3
13.33 miles DayOne: Nurmijärvi
Singapore-based developer DayOne announced plans for a large-scale data center campus in the Sudentulli area of Klaukkala, located within the municipality of Nurmijärvi in the Uusimaa region of Finland.
14.18 miles QTS: Jokela, Tuusula
QTS plans a two-building data center campus in the western employment area of Jokela, Tuusula, on a 16.8-hectare site along Vallunlenkki.
14.48 miles Equinix Helsinki HE2
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
14.75 miles Elisa Espoo Säterinportti
14.92 miles Telia Helsinki Kansakoulukuja
15.13 miles Carrier Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.26 miles Hyperco: Espoo
Hyperco, a Nordic data center firm, is eyeing a significant expansion with plans to construct a new campus in Espoo, Finland, a municipality adjacent to Helsinki.
15.79 miles Enterprise Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.05 miles Equinix Helsinki HE6
16.09 miles Equinix Helsinki HE7 Sinimäki
16.11 miles Equinix: Helsinki HE8
Equinix plans a new data center, HE8, attached to its HE7 building at Sinimäentie 8 in Espoo's Laajalahti district. The Suosaari detailed plan change would allow the extension in place of a vacant office wing.
16.14 miles GlobalConnect: Espoo Innopoli
16.18 miles Technopolis Innopoli
16.20 miles atNorth: FIN02
Located in Sinimäentie, Espoo, within the Helsinki metropolitan area, the new campus spans 23,000 square meters at full buildout. The initial phase of FIN02 offers 2,196 square meters of white space.
16.34 miles atNorth: FIN03
FIN03 is located in Espoo with a gross space of 1,200 sqm.
16.48 miles atNorth: FIN03 Kilo, Espoo
atNorth FIN03 is a colocation data center in the Kilo district of Espoo. DataCenter Finland built the facility, which passed to Valtti and then Advania before atNorth acquired it in January 2023.
16.56 miles LocalNet: Lauttasaari
LocalNet Lauttasaari is a colocation data center in the former Nebula server room at Kiviaidankatu 2 in Lauttasaari, Helsinki. Local Loop Oy, which trades as LocalNet, took over the facility from Telia in July 2026.
16.57 miles Elisa Helsinki Lauttasaari
16.85 miles Elisa Espoo Tapiola
17.07 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.01 miles Nebius: Mäntsälä Finland
The data center was originally acquired from Yandex, which purchased the land in 2013 and opened it in 2014 as the company's first 'greenfield' project.
19.42 miles FCDC: Mäntsälä 2
FCDC is developing a data center building at Graniittitie 6 in the Kapuli business area of Mäntsälä, on a plot leased from the municipality, for a single operator.
19.44 miles Nebius Mäntsälä 2
Nebius is developing a second data center in Mäntsälä's Kapuli business district on a separate site from its existing facility.
19.57 miles Verne: Mäntsälä FI-VDC03
Verne has started construction of a purpose-built data centre campus in Mäntsälä’s Kapuli industrial area. The AI and high-performance computing facility is planned to begin operating in 2027, using renewable electricity supplied through Nivos and offering its waste heat for local heating projects
19.68 miles FCDC: Mäntsälä 1
FCDC is the developer of the first data center building at Gneissitie 3 in the Kapuli industrial area of Mäntsälä, which Verne operates.
19.69 miles Verne: Mäntsälä DC05
Verne has started construction of a purpose-built data centre campus in Mäntsälä’s Kapuli industrial area. The AI and high-performance computing facility uses renewable electricity supplied through Nivos and offers its waste heat for local heating projects.
19.73 miles Verne: Mäntsälä DC06

Operating Company

Operated by:

Fincap DC Corp was founded in 2023. According to Joonas Viita-aho, despite its name, the company is not part of the Fincap Group. The Fincap Group is an investment company, where in addition to Janne Kotamäki, investor and football influencer Raimo Sarajärvi is also responsible .

0
Facilities
0
Markets

News See all

Read Hyperco To Develop two 50MW Facilities in Helsinki, Finland
Baxtel

Hyperco To Develop two 50MW Facilities in Helsinki, Finland

December 14, 2022 Helsinki

Hyperco has announced its plan to expand its data center presence in New Zealand with two new data center campus developments. The Nordic data center company said it would develop the facilities in Helsinki, Finland, with each having an initial capacity of 50MW. The company did not reveal the...

Read more
Read Hyperco Acquires Equinix and Thales-Occupied Data Center in Helsinki, Finland
Baxtel

Hyperco Acquires Equinix and Thales-Occupied Data Center in Helsinki, Finland

June 16, 2022 Helsinki

Hyperco has made its first acquisition as it takes over a property belonging to TS-Yhtyma. The company paid more than €35 million ($36.4m) for the property. The building is located at Myllynkivenkuja 4 in Vantaa, Helsinki, Finland. Thales and Equinix are also occupying the property. The building...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?