Equinix: Helsinki HE8

Latest Podcast Sinimäentie 8
Land Bank
Land secured for future development
Operated by:

Equinix: Helsinki HE8

Utility Provider: Caruna Espoo

Site History

  • In October 2025, the Espoo planning board sent the Suosaari plan change to the City Board.
  • In February 2024, Equinix applied for the plan change.

Project Profile

  • Owner: Equinix Finland Oy
  • Floor area: about 23,700 m²
  • Heat: the plan requires data center heat to be recovered into district heating

Map and Nearby Locations

Sinimäentie 8
Equinix Sites
Nearby Facilities

Sites within 15 miles of Equinix: Helsinki HE8

Distance Site About
0.05 miles Equinix Helsinki HE7 Sinimäki
0.15 miles atNorth: FIN02
Located in Sinimäentie, Espoo, within the Helsinki metropolitan area, the new campus spans 23,000 square meters at full buildout. The initial phase of FIN02 offers 2,196 square meters of white space.
0.16 miles Equinix Helsinki HE6
0.94 miles atNorth: FIN03
FIN03 is located in Espoo with a gross space of 1,200 sqm.
0.97 miles atNorth: FIN03 Kilo, Espoo
atNorth FIN03 is a colocation data center in the Kilo district of Espoo. DataCenter Finland built the facility, which passed to Valtti and then Advania before atNorth acquired it in January 2023.
1.37 miles Enterprise Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.42 miles Elisa Espoo Säterinportti
1.81 miles GlobalConnect: Espoo Innopoli
1.96 miles Technopolis Innopoli
1.98 miles Elisa Espoo Tapiola
3.47 miles Equinix Helsinki HE1
3.47 miles Mediam Helsiki Data Center
3.62 miles Creanova: Helsinki
Creanova operates a carrier-neutral colocation data center at Hiomotie 10 in Pitäjänmäki, Helsinki. The facility opened in 1996.
3.62 miles UpCloud: Helsinki FI-HEL2
UpCloud's FI-HEL2 cloud zone runs inside Telia Helsinki Data Center in Pitäjänmäki, Helsinki, and includes the company's GPU servers.
3.63 miles Gcore: Helsinki (Telia HDC)
Gcore runs an AI GPU cloud cluster inside Telia Helsinki Data Center in Pitäjänmäki, Helsinki.
3.64 miles Telia Helsinki Pitäjänmäki
The site is powered by 100 percent renewable energy and will recycle waste heat from the servers, producing 200,000 MWh per year - enough heat to supply 20,000 homes in the nearby town of Espoo.
3.64 miles Verda: Helsinki (Telia HDC)
Verda runs GPU cloud capacity inside Telia Helsinki Data Center in Pitäjänmäki, Helsinki, which Telia resells as Telia Sovereign AI Cloud.
3.71 miles Atomidata: Helsinki
Atomidata operates a small colocation data center at Valimotie 13A in Pitäjänmäki, Helsinki.
3.76 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.77 miles Telia Pitäjänmäki (Nebula Oy)
The facility was acquired by Telia when it acquired Nebula Oy in 2017. The Nebula server room in the building has since closed.
4.38 miles Hyperco: Espoo
Hyperco, a Nordic data center firm, is eyeing a significant expansion with plans to construct a new campus in Espoo, Finland, a municipality adjacent to Helsinki.
5.07 miles Digita Pasila Broadcasting Tower
5.09 miles Elisa Helsinki Lauttasaari
5.10 miles LocalNet: Lauttasaari
LocalNet Lauttasaari is a colocation data center in the former Nebula server room at Kiviaidankatu 2 in Lauttasaari, Helsinki. Local Loop Oy, which trades as LocalNet, took over the facility from Telia in July 2026.
5.13 miles Digita: Helsinki Data Center 2 (Pieni Paja)
Digita Helsinki Data Center 2, known as Pieni Paja, is a colocation data center on the Pasila campus at Televisiokatu 2 in Helsinki. It opened in 2023 next to Digita's original Pasila data center.
5.59 miles Elisa Helsinki Pasila
5.91 miles atNorth: FIN01
FIN01 is located in the Vallila area of Helsinki with a gross space of 1,200 sqm.
5.93 miles Equinix Helsinki HE4
5.97 miles Hyperco: Vantaa
Hyperco owns the data center building at Myllynkivenkuja 4 in Vantaa, which houses Equinix HE4 and Thales. Hyperco has been part of DAMAC's data center business since 2025.
6.03 miles Telia Helsinki Kansakoulukuja
6.36 miles Carrier Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.80 miles Equinix Helsinki HE2
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
6.83 miles Equinix Helsinki HE3
7.35 miles Equinix Helsinki HE5
7.96 miles CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.50 miles Brunswick: Heikinlaakso, Helsinki
This proposed data center development north of Helsinki is at the land-reservation and pre-zoning stage, filed by Brunswick Real Estate Finland Oy. The operator has not yet been disclosed and is expected to be named later in the planning process.
12.99 miles Hetzner Finland
The entire site is 150,000 m², making it spacious enough to accommodate 20 data centers.
13.05 miles Verne: FL-HEL-DC04
This facility is part of Verne Global’s 'The Air' Campus, located in the Helsinki metropolitan area (Vantaa).
13.12 miles Verne: FL-HEL-DC02
This facility is part of Verne Global’s 'The Air' Campus, located in the Helsinki metropolitan area (Vantaa).
13.15 miles Verne: FL-HEL-DC01
Verne, the leading provider of sustainably powered HPC data centers across the Nordics, has acquired the land at its existing Helsinki data center campus, securing room for future expansion.
13.20 miles Verne: FL-HEL-DC03
This facility is part of Verne Global’s 'The Air' Campus, located in the Helsinki metropolitan area (Vantaa).
14.93 miles DayOne: Nurmijärvi
Singapore-based developer DayOne announced plans for a large-scale data center campus in the Sudentulli area of Klaukkala, located within the municipality of Nurmijärvi in the Uusimaa region of Finland.
16.11 miles FCDC: Kerava
FCDC plans a data center campus of five buildings in the Alikerava area of southern Kerava, between the Lahti motorway and the Keravanjoki river.
17.71 miles Valley TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.42 miles OnZero: Sipoo Söderkulla
OnZero operates a modular, liquid-cooled data center built from shipping containers at Keravan Energia's heating plant in Söderkulla, Sipoo. Its waste heat feeds the Söderkulla district heating network.

Equinix: Helsinki HE8 Data Center Photos See all

Equinix cage door
Source: Baxtel

Operating Company

Operated by:

Equinix connects the world’s leading businesses to their customers, employees and partners inside the most interconnected data centers.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Schneider Electric and Equinix Trial Software-Defined Switchgear for Data Centers
Equinix and Schneider Electric have partnered to pilot software-defined medium-voltage switchgear at an undisclosed Equinix data center. The technology, developed by Schneider Electric, is designed...

Schneider Electric and Equinix Trial Software-Defined Switchgear for Data Centers

September 30, 2026 Equinix

Equinix and Schneider Electric have partnered to pilot software-defined medium-voltage switchgear at an undisclosed Equinix data center. The technology, developed by Schneider Electric, is designed to reduce the need for specialized cabling and hardware in data centers. Schneider said the...

Read more
Read Diraq And Equinix To Deploy Australia’s First Commercial Quantum Computer
Australian quantum startup Diraq has partnered with Equinix to deploy a quantum computer at an Equinix data center in Sydney. The eight-qubit system will use a silicon chip with self-contained cryo...

Diraq And Equinix To Deploy Australia’s First Commercial Quantum Computer

September 03, 2026 Equinix

Australian quantum startup Diraq has partnered with Equinix to deploy a quantum computer at an Equinix data center in Sydney. The eight-qubit system will use a silicon chip with self-contained cryogenic cooling and control electronics. The chip can be replaced to increase the qubit count without...

Read more
Read Equinix to Reuse Data Center Heat to Warm Homes in Milan
Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, E...

Equinix to Reuse Data Center Heat to Warm Homes in Milan

July 10, 2026 Equinix

Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, Equinix will design and operate the heat recovery system, while A2A will use four large-scale heat...

Read more
Read Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland
Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deploy...

Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland

June 19, 2026 Equinix

Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deployed two hydrogen-powered generators at its DB3 Data Center facility. The 12-week trial will support...

Read more
Read Equinix is Building its Fourth Data Center in Malaysia
Equinix is Building its Fourth Data Center in Malaysia

Equinix is Building its Fourth Data Center in Malaysia

May 12, 2026 Equinix

Equinix will build its fourth data center in Malaysia, KL2, in Kuala Lumpur. The US$190 million facility will house over 2,200 cabinets at full build-out, though its size and IT capacity were not disclosed. Equinix said the new data center will be located less than 1 km from its KL1 facility in...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?