Brunswick: Heikinlaakso, Helsinki

Latest Podcast Kääpätie
Land Bank
Land secured for future development
Operated by:

Brunswick: Heikinlaakso, Helsinki

Lot Size: 18 acres

This site is a proposed data center development being advanced by Brunswick Real Estate Finland Oy on the outskirts of Helsinki. The project is currently at the land-reservation stage, with a formal zoning process still to follow, since the area is not yet designated for this type of use. City authorities are expected to review the reservation application through their standard planning process, with a decision to follow resident feedback. As with several of Brunswick's other Nordic projects, the company appears to be developing the site as landlord rather than operator, and the entity that will ultimately run the facility has not been named.

Map and Nearby Locations

Kääpätie
Brunswick Real Estate Finland Oy Sites
Nearby Facilities

Sites within 15 miles of Brunswick: Heikinlaakso, Helsinki

Distance Site About
2.21 miles Verne: FL-HEL-DC04
This facility is part of Verne Global’s 'The Air' Campus, located in the Helsinki metropolitan area (Vantaa).
2.30 miles Verne: FL-HEL-DC01
Verne, the leading provider of sustainably powered HPC data centers across the Nordics, has acquired the land at its existing Helsinki data center campus, securing room for future expansion.
2.31 miles Verne: FL-HEL-DC02
This facility is part of Verne Global’s 'The Air' Campus, located in the Helsinki metropolitan area (Vantaa).
2.38 miles Verne: FL-HEL-DC03
This facility is part of Verne Global’s 'The Air' Campus, located in the Helsinki metropolitan area (Vantaa).
4.85 miles Equinix Helsinki HE5
5.25 miles Hetzner Finland
The entire site is 150,000 m², making it spacious enough to accommodate 20 data centers.
6.98 miles atNorth: FIN01
FIN01 is located in the Vallila area of Helsinki with a gross space of 1,200 sqm.
7.09 miles Equinix Helsinki HE3
7.15 miles Elisa Helsinki Pasila
7.17 miles Digita Pasila Broadcasting Tower
7.84 miles Telia Pitäjänmäki (Nebula Oy)
The facility was acquired by Telia when it acquired Nebula Oy in 2017.
7.96 miles Telia Helsinki Pitäjänmäki
The site is powered by 100 percent renewable energy and will recycle waste heat from the servers, producing 200,000 MWh per year - enough heat to supply 20,000 homes in the nearby town of Espoo.
8.06 miles Equinix Helsinki HE1
8.06 miles Mediam Helsiki Data Center
8.23 miles Equinix Helsinki HE2
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
8.34 miles Edgnex: Vantaa
In 2025, Edgnex expanded its presence in Finland by acquiring data center developer Hyperco.
8.36 miles Equinix Helsinki HE4
8.79 miles Telia Helsinki Kansakoulukuja
10.13 miles Elisa Espoo Säterinportti
10.60 miles Telia Lauttasaari (Nebula Oy)
The facility was acquired by Telia when it acquired Nebula Oy in 2017.
10.62 miles Elisa Helsinki Lauttasaari
10.97 miles Technopolis Innopoli
10.97 miles IP-Only Espoo
10.98 miles DataCenter Finland Espoo
11.43 miles Equinix Helsinki HE6
11.47 miles Equinix Helsinki HE7 Sinimäki
11.62 miles atNorth: FIN02
Located in Sinimäentie, Espoo, within the Helsinki metropolitan area, the new campus spans 23,000 square meters at full buildout. The initial phase of FIN02 offers 2,196 square meters of white space.
11.65 miles Elisa Espoo Tapiola
12.02 miles atNorth: FIN03
FIN03 is located in Espoo with a gross space of 1,200 sqm.
12.66 miles Hyperco: Espoo
Hyperco, a Nordic data center firm, is eyeing a significant expansion with plans to construct a new campus in Espoo, Finland, a municipality adjacent to Helsinki.
13.65 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.37 miles DayOne: Nurmijärvi
Singapore-based developer DayOne announced plans for a large-scale data center campus in the Sudentulli area of Klaukkala, located within the municipality of Nurmijärvi in the Uusimaa region of Finland.
16.14 miles Prime: Järvenpää, Finland
US-based operator Prime Data Centers has announced plans for a significant expansion into Finland, targeting a 12-hectare site in the Vähänummi industrial area of Järvenpää.
19.94 miles Park TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Operating Company

Operated by:

Brunswick Real Estate Finland Oy is the Finnish subsidiary of Brunswick Real Estate AB, a Nordic real estate investment manager founded in 2003 and headquartered in Stockholm. The Finnish entity, registered under business ID 3505633-8, was incorporated in early 2025 and is headed locally by Managing Director Mathias Vuorelma, who also serves as Brunswick's Partner and Head of Finland. It operates alongside related Finnish Brunswick entities involved in real estate asset management. Through its parent platform, the company draws on a specific track record in data center real estate, including prior partnerships with Prime DC on projects near Helsinki and in Denmark, an ongoing collaboration with QTS on a large planned Finnish campus in Forssa, and a previously acquired and sold Digital Realty-occupied facility in Stockholm.

0
Facilities
0
Markets

News See all

Read Google Apologizes And Halts Work At Two Finnish Data Center Sites
Finland's Licensing and Supervision Authority has told Google subsidiary Tuike Finland to keep preparatory work at its [Muhos](https://baxtel.com/data-center/google-muhos) and [Kajaani](https://bax...

Google Apologizes And Halts Work At Two Finnish Data Center Sites

October 26, 2026 Google

Finland's Licensing and Supervision Authority has told Google subsidiary Tuike Finland to keep preparatory work at its Muhos and Kajaani data center sites suspended. The agency set an Oct. 23 deadline for felling, excavation, blasting and road building to stop at both sites, according to its...

Read more
Read Finland Halts Two Google Data Center Builds Over 300-Hectare Forest Clearing
Finnish regulators have ordered a halt to work at two planned [Google](https://baxtel.com/data-centers/google) data centers after more than 300 hectares of forest were cleared before mandatory envi...

Finland Halts Two Google Data Center Builds Over 300-Hectare Forest Clearing

October 10, 2026 Google

Finnish regulators have ordered a halt to work at two planned Google data centers after more than 300 hectares of forest were cleared before mandatory environmental impact assessments were completed, the BBC reported. The order covers the company's project sites in Muhos and Kajaani, both in the...

Read more
Read Sesterce Plans €10B, 600MW AI Campus at Former Finnish Paper Mill
French AI infrastructure company [Sesterce](https://baxtel.com/data-centers/sesterce) said Thursday it plans to invest more than €10 billion ($11.2 billion) to convert the former Kaipola paper mill...

Sesterce Plans €10B, 600MW AI Campus at Former Finnish Paper Mill

October 08, 2026 Sesterce

French AI infrastructure company Sesterce said Thursday it plans to invest more than €10 billion ($11.2 billion) to convert the former Kaipola paper mill in Jämsä, Central Finland, into a 600 MW AI data center campus. The company's announcement outlines a 200 MW first phase and confirms an anchor...

Read more
Read Applied Digital Secures 1 GW Of Finnish Power For First Campus Outside US
[Applied Digital](https://baxtel.com/data-centers/applied-digital) (NASDAQ: APLD) has secured access to as much as 1 GW of potential power capacity in Finland, its first development opportunity out...

Applied Digital Secures 1 GW Of Finnish Power For First Campus Outside US

October 06, 2026 Applied Digital

Applied Digital (NASDAQ: APLD) has secured access to as much as 1 GW of potential power capacity in Finland, its first development opportunity outside the United States, the Dallas-based AI data center developer said on October 6. The planned AI Factory campus can scale to 1 GW, with initial...

Read more
Read atNorth Plans €2B Salo Data Center With 75MW First Phase, 230MW Path
atNorth will develop a €2 billion data center, FIN05, in Salo, [Finland](https://baxtel.com/regions/finland), on a 28.6-hectare site, with 75 MW of power secured for the first phase and a path to a...

atNorth Plans €2B Salo Data Center With 75MW First Phase, 230MW Path

October 05, 2026 atNorth

atNorth will develop a €2 billion data center, FIN05, in Salo, Finland, on a 28.6-hectare site, with 75 MW of power secured for the first phase and a path to as much as 230 MW. The Nordic operator announced the plan on October 5. Power will arrive through a new Fingrid substation.The first phase...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?