Hetzner Finland

Latest Podcast Huurrekuja 10
Under ConstructionOperational
Fully operational with expansion in progress
Operated by:

Hetzner Finland

Short Code: HEL1
Site was first built in 2019 and has expansions through 2026
░░░ Request Dataset MW
Operational Power
░░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

As of 2025, Data Center Park Helsinki has 12 operational data centers and four more under construction. Each data center houses tens of thousands of servers.

The entire site is 150,000 m², making it spacious enough to accommodate 20 data centers. The site is surrounded by a protective fence, which is almost one and a half kilometers long.

Map and Nearby Locations

Huurrekuja 10
Hetzner Online GmbH Sites
Nearby Facilities

Hetzner Finland Power Growth Over Time

+36% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Hetzner Finland

Distance Site About
3.34 miles FCDC: Kerava
FCDC plans a data center campus of five buildings in the Alikerava area of southern Kerava, between the Lahti motorway and the Keravanjoki river.
3.65 miles Verne: FL-HEL-DC03
This facility is part of Verne Global’s 'The Air' Campus, located in the Helsinki metropolitan area (Vantaa).
3.66 miles Verne: FL-HEL-DC02
This facility is part of Verne Global’s 'The Air' Campus, located in the Helsinki metropolitan area (Vantaa).
3.70 miles Verne: FL-HEL-DC01
Verne, the leading provider of sustainably powered HPC data centers across the Nordics, has acquired the land at its existing Helsinki data center campus, securing room for future expansion.
3.71 miles Verne: FL-HEL-DC04
This facility is part of Verne Global’s 'The Air' Campus, located in the Helsinki metropolitan area (Vantaa).
5.25 miles Brunswick: Heikinlaakso, Helsinki
This proposed data center development north of Helsinki is at the land-reservation and pre-zoning stage, filed by Brunswick Real Estate Finland Oy. The operator has not yet been disclosed and is expected to be named later in the planning process.
7.68 miles Hyperco: Vantaa
Hyperco owns the data center building at Myllynkivenkuja 4 in Vantaa, which houses Equinix HE4 and Thales. Hyperco has been part of DAMAC's data center business since 2025.
7.73 miles Equinix Helsinki HE4
8.56 miles Equinix Helsinki HE5
9.95 miles OnZero: Sipoo Söderkulla
OnZero operates a modular, liquid-cooled data center built from shipping containers at Keravan Energia's heating plant in Söderkulla, Sipoo. Its waste heat feeds the Söderkulla district heating network.
10.03 miles Telia Pitäjänmäki (Nebula Oy)
The facility was acquired by Telia when it acquired Nebula Oy in 2017. The Nebula server room in the building has since closed.
10.08 miles Atomidata: Helsinki
Atomidata operates a small colocation data center at Valimotie 13A in Pitäjänmäki, Helsinki.
10.10 miles Creanova: Helsinki
Creanova operates a carrier-neutral colocation data center at Hiomotie 10 in Pitäjänmäki, Helsinki. The facility opened in 1996.
10.11 miles Mediam Helsiki Data Center
10.11 miles Equinix Helsinki HE1
10.20 miles Verda: Helsinki (Telia HDC)
Verda runs GPU cloud capacity inside Telia Helsinki Data Center in Pitäjänmäki, Helsinki, which Telia resells as Telia Sovereign AI Cloud.
10.22 miles Gcore: Helsinki (Telia HDC)
Gcore runs an AI GPU cloud cluster inside Telia Helsinki Data Center in Pitäjänmäki, Helsinki.
10.22 miles Telia Helsinki Pitäjänmäki
The site is powered by 100 percent renewable energy and will recycle waste heat from the servers, producing 200,000 MWh per year - enough heat to supply 20,000 homes in the nearby town of Espoo.
10.23 miles UpCloud: Helsinki FI-HEL2
UpCloud's FI-HEL2 cloud zone runs inside Telia Helsinki Data Center in Pitäjänmäki, Helsinki, and includes the company's GPU servers.
10.27 miles Digita: Helsinki Data Center 2 (Pieni Paja)
Digita Helsinki Data Center 2, known as Pieni Paja, is a colocation data center on the Pasila campus at Televisiokatu 2 in Helsinki. It opened in 2023 next to Digita's original Pasila data center.
10.28 miles Digita Pasila Broadcasting Tower
10.54 miles atNorth: FIN01
FIN01 is located in the Vallila area of Helsinki with a gross space of 1,200 sqm.
10.60 miles Elisa Helsinki Pasila
11.05 miles DayOne: Nurmijärvi
Singapore-based developer DayOne announced plans for a large-scale data center campus in the Sudentulli area of Klaukkala, located within the municipality of Nurmijärvi in the Uusimaa region of Finland.
11.05 miles Equinix Helsinki HE3
11.26 miles Prime: Järvenpää, Finland
US-based operator Prime Data Centers has announced plans for a significant expansion into Finland, targeting a 12-hectare site in the Vähänummi industrial area of Järvenpää.
11.67 miles Elisa Espoo Säterinportti
11.93 miles Hyperco: Espoo
Hyperco, a Nordic data center firm, is eyeing a significant expansion with plans to construct a new campus in Espoo, Finland, a municipality adjacent to Helsinki.
12.28 miles Equinix Helsinki HE2
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
12.57 miles Enterprise Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.57 miles Telia Helsinki Kansakoulukuja
12.83 miles Carrier Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.95 miles Equinix Helsinki HE6
12.97 miles Equinix Helsinki HE7 Sinimäki
12.99 miles Equinix: Helsinki HE8
Equinix plans a new data center, HE8, attached to its HE7 building at Sinimäentie 8 in Espoo's Laajalahti district. The Suosaari detailed plan change would allow the extension in place of a vacant office wing.
13.07 miles atNorth: FIN02
Located in Sinimäentie, Espoo, within the Helsinki metropolitan area, the new campus spans 23,000 square meters at full buildout. The initial phase of FIN02 offers 2,196 square meters of white space.
13.15 miles atNorth: FIN03
FIN03 is located in Espoo with a gross space of 1,200 sqm.
13.19 miles GlobalConnect: Espoo Innopoli
13.24 miles Technopolis Innopoli
13.30 miles atNorth: FIN03 Kilo, Espoo
atNorth FIN03 is a colocation data center in the Kilo district of Espoo. DataCenter Finland built the facility, which passed to Valtti and then Advania before atNorth acquired it in January 2023.
13.75 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.90 miles Elisa Espoo Tapiola
14.02 miles LocalNet: Lauttasaari
LocalNet Lauttasaari is a colocation data center in the former Nebula server room at Kiviaidankatu 2 in Lauttasaari, Helsinki. Local Loop Oy, which trades as LocalNet, took over the facility from Telia in July 2026.
14.03 miles Elisa Helsinki Lauttasaari
14.42 miles QTS: Jokela, Tuusula
QTS plans a two-building data center campus in the western employment area of Jokela, Tuusula, on a 16.8-hectare site along Vallunlenkki.

Hetzner Finland Data Center Photos See all

Exterior of Hetzner Data Center Campus North of Helsinki
Source: Hetzner
ISO 27001 Certification acquired in 2019
Source: Hetzner
Data Center Park Helsinki
Source: https://www.hetzner.com/pressroom/five-years-helsinki/

Operating Company

Operated by:

Hetzner is primarily a managed hosting provider, but does provide colocation too. Minimum colocation is 1/3 rack (14 RU).

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Hyperco To Develop two 50MW Facilities in Helsinki, Finland
Baxtel

Hyperco To Develop two 50MW Facilities in Helsinki, Finland

December 14, 2022 Helsinki

Hyperco has announced its plan to expand its data center presence in New Zealand with two new data center campus developments. The Nordic data center company said it would develop the facilities in Helsinki, Finland, with each having an initial capacity of 50MW. The company did not reveal the...

Read more
Read Hyperco Acquires Equinix and Thales-Occupied Data Center in Helsinki, Finland
Baxtel

Hyperco Acquires Equinix and Thales-Occupied Data Center in Helsinki, Finland

June 16, 2022 Helsinki

Hyperco has made its first acquisition as it takes over a property belonging to TS-Yhtyma. The company paid more than €35 million ($36.4m) for the property. The building is located at Myllynkivenkuja 4 in Vantaa, Helsinki, Finland. Thales and Equinix are also occupying the property. The building...

Read more
Read Hetzner completes expansion at Finnish campus, starts work on two more
Hetzner completes expansion at Finnish campus, starts work on two more

Hetzner completes expansion at Finnish campus, starts work on two more

November 09, 2021 Hetzner Finland

German cloud and hosting firm Hetzner has completed the expansion of its Finish data center campus. It has also broken ground on other buildings on the same campus. Earlier in July, Hetzner completed the development of a new building at the Tuusula campus which is to the north of Helsinki. It...

Read more
Read Hetzner received the ISO 27001 certification for Helsinki data center
Hetzner received the ISO 27001 certification for Helsinki data center

Hetzner received the ISO 27001 certification for Helsinki data center

September 30, 2019 Hetzner Finland

Hetzner‘s Data Center Park Helsinki has reached a new milestone by receiving the ISO 27001 certificate for information security. Only 18 months after going live, the park today already has 6,000 m² of web hosting infrastructure in operation. In addition to information security, several other...

Read more
Read Germany’s Hetzner opens major colocation campus in Helsinki
The site in Tuusula offers cloud and colocation services, with 2,000 square meters of space available immediately. It benefits from fast connectivity to central Europe, thanks to Hetzner’s investme...

Germany’s Hetzner opens major colocation campus in Helsinki

October 02, 2018 Hetzner Finland

The site in Tuusula offers cloud and colocation services, with 2,000 square meters of space available immediately. It benefits from fast connectivity to central Europe, thanks to Hetzner’s investment into C-Lion 1 cable system (also known as the Northern Digital Highway) between Helsinki and...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?