7 data centers on this campus
First built in 1998 with expansions through 2027
Total building size: 674,200 SqFt
Coordinates: 37.24162, -121.78322
░░░░ Request Dataset MW
Operational
░░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

The four building Equinix campus in Silicon Valley lies to the far south in San Jose, yet it is one of the best-connected data centers in the Bay Area.

The campus consists of 3 buildings (SV1, SV5, and SV10). SV1 was the original data center at 11 Great Oaks when Equinix launched in 1999. SV5 was opened in 2010 and SV10 was completed in late 2017.

Peering Exchanges

Equinix's Silicon Valley campus is home to 2 Internet Exchanges (IXPs).

  • Equinix Exchange San Jose: Equinix's traditional IXP that has been managed by Equinix since inception
  • Equinix Exchange PAIX: The historic Palo Alto Internet Exchange, previously owned by DEC, AboveNet, and Switch and Data. Equinix acquired Switch and Data in 2010.

Connectivity

Equinix operates SV1, SV5, and SV10 as a campus and has extensive fiber conduits connecting the buildings. Cross Connects between buildings are treated as a standard cross-connect.

Equinix also operates Metro Connect (formerly IBXLink) that provides Layer 1 and switch-based Layer 2 services from FastE to 10GE Ethernet circuits between other Equinix facilities in the bay area. (SV2, SV3, SV4, SV6, SV8)

SV10

Built in 2017, SV10 was constructed on an adjacent log. The building is 183,000sqft.

Equinix San Jose Future Expansion

Equinix has plans to expand the San Jose Campus. In 2015, Xilinx sold to Equinix an 18-acre parcel of undeveloped land. The new lot is approximately 1 mile South on Great Oaks Boulevard at the corner of Via Del Oro. Equinix plans to build SV12, SV13, and SV14 on the site. Each new building will be 188,000sqft for a total of 564,000 sqft.

Included in the project's plan is a new PG&E substation (Saint Teresa) that will supplement the Edenvale Service Center Substation at 6402 Sain Teresa Boulevard. The proposed substation would be located between the two campuses on a 1.9-acre lot.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Equinix: SV1 Equinix
Operational
░░░ Request Dataset MW — 1998
Equinix SV10 Equinix
Operational
░░░░ Request Dataset MW 183,000 SqFt 2017
Equinix SV11 Equinix
Operational
░░░ Request Dataset MW — 2021
Equinix: SV12x Equinix
Operational
░░░░ Request Dataset MW 182,350 SqFt 2026
Equinix: SV18 Equinix
Under ConstructionOperational
░░░░ Request Dataset MW 182,350 SqFt 2026
Equinix: SV19 Equinix
Under Construction
— — 2027
Equinix SV5 Equinix
Operational
░░░ Request Dataset MW 126,500 SqFt 2011

Map and Nearby Locations

Equinix: San Jose Campus Power Growth Over Time

+137% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

Equinix connects the world’s leading businesses to their customers, employees and partners inside the most interconnected data centers.

0
Facilities
0
Markets
0MW
Megawatts

News

Read Equinix plans to open $142m Silicon Valley data center this month
Equinix plans to open $142m Silicon Valley data center this month

Equinix plans to open $142m Silicon Valley data center this month

June 03, 2021 Equinix SV11

Equinix will be opening its new $142 million data center at its Silicon Valley on the 30th of June. The data center dubbed SV11 has a colocation space of 61,000 sqft with enough room for 1,450 cabinets. Also, Equinix plans to expand its existing Bloom Energy fuel cell deployment to use as a...

Read more
Read More News

Documents

Ready to Level up Your
Data Center Strategy?