|
0.00 miles
|
CapitaLand: Reynolds House
|
Reynolds House is a three-storey powered shell data centre at 4 Archway, Hulme, Manchester. CapitaLand Ascendas REIT has owned it since 2021, and Volta and iomart run data halls inside.
|
|
0.02 miles
|
Volta: MAN1
|
Volta MAN1 is a colocation data centre on the upper floor of Reynolds House, 4 Archway, Hulme, Manchester. Lunar Digital opened it as Lunar 1 in January 2024, and Volta Data Centres has run it since October 2026.
|
|
0.02 miles
|
iomart: DC7 Manchester
|
In 2012, iomart Group plc acquired Melbourne Server Hosting, gaining two Manchester data centers—Turing House (DC6) and Reynolds House (DC7).
|
|
0.02 miles
|
Equinix Manchester MA2
|
Equinix MA2 was a colocation data center at Reynolds House, 4 Archway, Hulme, Manchester, that came to Equinix with Telecity in 2016. Equinix closed MA2 on 30 June 2023 when its lease ended; Lunar Digital, owned by Volta since October 2026, now runs the building.
|
|
0.05 miles
|
iomart DC6 Manchester
|
The iomart DC6 data center in Manchester (also known as Turing House) became part of iomart's portfolio in August 2012.
|
|
0.11 miles
|
ANS: MaNOC 8
|
|
|
0.41 miles
|
Equinix Manchester MA4
|
|
|
0.44 miles
|
Equinix Manchester MA1
|
|
|
1.07 miles
|
Wavenet: Manchester ServerBank
|
Wavenet Limited operates the ServerBank data centre at Bank House, Faulkner Street, Manchester, a carrier-neutral facility built in a former Bank of England bullion vault.
|
|
1.28 miles
|
Asanti: Manchester
|
Asanti's Manchester data centre is at Daisy House, 1 Brindley Road, Old Trafford, with about 4,000 sq ft of colocation space. Asanti bought it from Daisy Group in November 2022.
|
|
1.75 miles
|
Lumen: Manchester
|
Lumen Technologies operates the facility today, following CenturyLink's 2017 acquisition of Level 3's data centers and network and its subsequent rebranding to Lumen in 2020.
|
|
1.76 miles
|
AI End User Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
1.89 miles
|
Equinix Manchester MA3
|
|
|
1.94 miles
|
iomart: DC13 Manchester
|
iomart acquired the LDeX Group in December 2018, and what was previously known as the LDeX2 Manchester site is now integrated into iomart's network as DC13.
|
|
2.22 miles
|
Volta: MAN3
|
Volta MAN3 is a purpose-built colocation data centre at 545 Hyde Road, Belle Vue, Manchester, with four data halls and 2 MVA of power from a private substation. Lunar Digital opened it as Lunar 3 in 2023, and Volta Data Centres has owned it since October 2026.
|
|
2.37 miles
|
Datacentreplus: Manchester
|
|
|
2.53 miles
|
AtlasEdge: MAN001
|
|
|
2.98 miles
|
Latos: Manchester
|
Latos has submitted a planning application to Manchester City Council for a two-building Neural Edge data center on a vacant brownfield plot in Newton Heath, East Manchester. No decision has been issued and IT capacity has not been disclosed.
|
|
3.09 miles
|
LGIM: Ocean Estates Trafford Park
|
Ocean Estates is a 7.8-acre site on Trafford Park Road in Trafford Park, Manchester, with planning consent for a 280,000 sq ft data center, offered for sale by LGIM for the BMW (UK) pension fund.
|
|
3.11 miles
|
ANS: MaNOC 5, 6 & 7
|
The ANS MaNOC 5, 6, and 7 complex is a high-density data center campus in Trafford Park, Manchester, comprising three interconnected buildings designed for secure colocation and managed services.
|
|
3.19 miles
|
Pulsant: Manchester NW-1
|
Pulsant Manchester NW-1 is a colocation data center on Ball Green in Trafford Park, built and opened by M247 in 2013 and owned by Pulsant since January 2022.
|
|
3.28 miles
|
ANS: MaNOC 4
|
ANS MaNOC 4 is a high-security, carrier-neutral data center featuring approximately 20,000 sq ft of gross space and a capacity for over 300 racks.
|
|
3.56 miles
|
Kao Data: Manchester
|
Kao Data is building a data center for high-performance computing and AI at Kenwood Point in Reddish, Stockport, with power due in late 2027 and opening planned for 2028.
|
|
3.69 miles
|
Equinix: Manchester MA5
|
|
|
5.20 miles
|
Deep Green: Manchester DG01
|
Deep Green's DG01 is a high-density AI and HPC colocation data center at the Move Urmston Leisure Centre in Trafford, Greater Manchester. Heat from its servers warms the leisure centre's two swimming pools.
|
|
5.43 miles
|
Digital L&D: Manchester
|
Salford City Council approved a GBP 250m data center for Digital Land & Development at the former White's Reclamation site on Liverpool Road, Eccles, in July 2025. Work has not started.
|
|
5.91 miles
|
LCRDC: Manchester Core
|
LCRDC Manchester Core is Liverpool City Region Data Centres' colocation offer in Manchester, sold from space inside Datum's MCR1 data center at Delta House in Wythenshawe, near Manchester Airport.
|
|
5.91 miles
|
Datum: MCR1
|
|
|
5.95 miles
|
Datum: MCR2
|
Datum's second Manchester data centre, a purpose-built facility beside MCR1 in Wythenshawe that opened in June 2025.
|
|
6.61 miles
|
Future Point: Manchester
|
Future Point Manchester is a planned data center energy park at Carrington in Trafford, Greater Manchester, developed by Carlton Power and Eclipse Power around a private electricity network with a planned 1.4 GW grid connection.
|
|
9.25 miles
|
Energy Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.04 miles
|
Zen Internet: Rochdale Sandbrook Park
|
Zen Internet's data centre at its Sandbrook Park headquarters in Rochdale has two halls, about 10,000 sq ft and around 150 racks of colocation space.
|
|
14.17 miles
|
Intercity: Bolton
|
The Intercity Technology data center in Bolton is a Tier 3 facility located at Hallmark House, Paragon Business Park.
|
|
15.31 miles
|
Level3 Warrington
|
|