Data Center Campus

Volta Manchester Campus

Volta's Manchester campus is the MAN1 and MAN2 data halls inside Reynolds House, 4 Archway, Hulme.

2 sites Manchester
OperationalProspective Expansion
Fully operational facility with prospective expansion planned
Developed by:

Campus at a Glance

2 data centers on this campus
First built in 2024
Total building size: ░░░░░░ Request Dataset SqFt
Coordinates: 53.4644, -2.24751
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

Volta's Manchester campus holds the MAN1 (upper floor) and MAN2 (ground floor) data halls inside Reynolds House in Hulme, a powered shell owned by CapitaLand Ascendas REIT. Lunar Digital signed a 15-year lease in 2023 and opened the halls in January 2024 as Lunar 1 and Lunar 2. Volta Data Centres bought Lunar Digital's Manchester business in October 2026.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Volta: MAN1 Volta Data Centres
OperationalProspective Expansion
░░░ Request Dataset MW ░░░░░░ Request Dataset SqFt 2024
Volta: MAN2 Volta Data Centres
Operational
░░░░ Request Dataset MW — 2024

Map and Nearby Locations

Volta Manchester Campus Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Developer

Developed by:

Volta Data Centres is owned by Arcus Infrastructure Partners through its European Infrastructure Fund 4. It runs LON1, a stand-alone colocation data center at 36-43 Great Sutton Street in Clerkenwell, central London, and since October 2026 the former Lunar Digital data centers at Reynolds House in Manchester. The company was incorporated in 2011 as GSS Data Centre Limited.

Volta Data Centres History:

  • In October 2026, Volta bought Lunar Digital's Reynolds House business in Manchester, its first expansion outside London.
  • In July 2026, Arcus bought Volta from Verne, and the London site returned to the Volta name.
  • In September 2022, Volta began trading under the Verne Global brand.
  • In April 2022, Digital 9 Infrastructure bought Volta for £45 million.
  • Founded in 2011 in London.
0
Facilities
0
Markets
0MW
Megawatts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.