Equinix Manchester MA4

Latest Podcast Unit 4 Synergy House
Operational
Fully operational facility
Operated by:

Equinix Manchester MA4

Year Built: 2007
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

MA4 is situated in a strategic location within the Manchester Science Park campus, close to MA1 and less than a mile from MA2.

This was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.

Map and Nearby Locations

Unit 4 Synergy House
Equinix Sites
Nearby Facilities

Equinix Manchester MA4 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Equinix Manchester MA4

Distance Site About
0.10 miles Equinix Manchester MA1
0.34 miles ANS: MaNOC 8
0.41 miles CapitaLand: Reynolds House
0.41 miles Lunar 2
Lunar 2 in Manchester offers colocation with two data halls, 1,500 kg/m² floor load, an N+1 DX CRAC and In-Row cooling system, a 1.5 MVA incoming feed capacity and N+1 generator redundancy with 168-hour fuel capacity at full load.
0.42 miles DRT Manchester
Reynold House is a three-storey triple net powered shell data centre located 13 km from Manchester International Airport and 290 km north west of London.
0.42 miles iomart DC6 Manchester
The iomart DC6 data center in Manchester (also known as Turing House) became part of iomart's portfolio in August 2012.
0.42 miles iomart: Melbourne Turing House
0.42 miles iomart: DC7 Manchester
In 2012, iomart Group plc acquired Melbourne Server Hosting, gaining two Manchester data centers—Turing House (DC6) and Reynolds House (DC7).
0.42 miles Lunar 1
The Lunar 1 data center, located at Reynolds House in the Manchester Technopark, is an enterprise-grade colocation facility managed by Lunar Digital Solutions Ltd.
0.43 miles Equinix Manchester MA2
1.12 miles Wavenet: Manchester ServerBank
Wavenet Limited operates the ServerBank Manchester data center (also referred to as Manchester DC 13) at Bank House, Manchester, United Kingdom.
1.16 miles Asanti: Manchester
The Asanti Manchester data centre was acquired from Daisy Group in November 2022. The Manchester data centre offers 15,000 sq ft of secure colocation hosting space.
1.67 miles Nasstar: Salford
1.73 miles Level3 Manchester
1.86 miles Lunar 3
Lunar 3 offers four data halls, three IT zones, a 1,000 kg/m² floor load, 1.2 MVA DX CRAC cooling, and 2 MVA power with N+1 redundancy from two independent sources and one substation.
2.16 miles MSP Data Center Request Dataset
Media Stream AI (MSAI) has unveiled a £50m ($67.2m) investment to develop a state-of-the-art AI data centre, robotics lab, and production facility at Anchorage Place in Salford’s Media City.
2.28 miles Equinix Manchester MA3
2.33 miles iomart: DC13 Manchester
iomart acquired the LDeX Group in December 2018, and what was previously known as the LDeX2 Manchester site is now integrated into iomart's network as DC13.
2.42 miles Computacenter: Manchester
2.78 miles Datacentreplus: Manchester
3.08 miles AtlasEdge: MAN001
3.15 miles Kao Data: Manchester
Kao Data is developing a £350m data center at Kenwood Point, Stockport, UK.
3.48 miles ANS: MaNOC 5, 6 & 7
The ANS MaNOC 5, 6, and 7 complex is a high-density data center campus in Trafford Park, Manchester, comprising three interconnected buildings designed for secure colocation and managed services.
3.56 miles Pulsant: Manchester NW-1
3.65 miles ANS: MaNOC 4
ANS MaNOC 4 is a high-security, carrier-neutral data center featuring approximately 20,000 sq ft of gross space and a capacity for over 300 racks.
5.54 miles Deep Green: Manchester DG01
Deep Green is to deploy an edge data center at the Move Urmston Leisure Center in southwest Manchester.
5.80 miles TeleData
5.82 miles Digital L&D: Manchester, UK.
Salford City Council has approved a £250m data center at Peel Waters’ Halo West site in Eccles, Salford, northwest of Manchester.
7.55 miles LCRDC: Manchester Core
LCRDC's Manchester data centre facility is located close to Manchester Airport’s City Enterprise Zone and is one of the best connected and well protected data centres in the UK.
14.57 miles Intercity: Bolton
The Intercity Technology data center in Bolton is a Tier 3 facility located at Hallmark House, Paragon Business Park.
15.60 miles Level3 Warrington

Equinix Manchester MA4 Data Center Photos See all

Equinix cage door
Source: Baxtel

Operating Company

Operated by:

Equinix connects the world’s leading businesses to their customers, employees and partners inside the most interconnected data centers.

318
Facilities
84
Markets
2093MW
Megawatts

News See all

Read Equinix to Reuse Data Center Heat to Warm Homes in Milan
Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, E...

Equinix to Reuse Data Center Heat to Warm Homes in Milan

July 10, 2026 Equinix

Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, Equinix will design and operate the heat recovery system, while A2A will use four large-scale heat...

Read more
Read Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland
Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deploy...

Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland

June 19, 2026 Equinix

Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deployed two hydrogen-powered generators at its DB3 Data Center facility. The 12-week trial will support...

Read more
Read Equinix is Building its Fourth Data Center in Malaysia
Equinix is Building its Fourth Data Center in Malaysia

Equinix is Building its Fourth Data Center in Malaysia

May 12, 2026 Equinix

Equinix will build its fourth data center in Malaysia, KL2, in Kuala Lumpur. The US$190 million facility will house over 2,200 cabinets at full build-out, though its size and IT capacity were not disclosed. Equinix said the new data center will be located less than 1 km from its KL1 facility in...

Read more
Read Equinix Begins Construction on DB7x Data Center in Dublin
Equinix Begins Construction on DB7x Data Center in Dublin

Equinix Begins Construction on DB7x Data Center in Dublin

March 30, 2026 Equinix

Equinix has begun construction on a new $92 million data center in Dublin, Ireland. The DB7x facility will be located in Blanchardstown, near the company’s existing sites in the city. Equinix is allocating $78 million toward high-performance infrastructure for AI workloads and $14 million for its...

Read more
Read EuroCTP Selects Equinix's FR2 Data Center for Equity Trading Consildated Tape
EuroCTP Selects Equinix's FR2 Data Center for Equity Trading Consildated Tape

EuroCTP Selects Equinix's FR2 Data Center for Equity Trading Consildated Tape

January 29, 2026 Equinix

EuroCTP, a new provider of an EU real-time pre and post-trade Consolidated Tape (CT) for financial equity trades, has selected Equinix's FR2 data center to host its 'tape' in Frankfurt, Germany.“Equinix FR2 provides EuroCTP with the ideal foundation to drive growth, ensuring we can reliably meet...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?