Deep Green to Deploy Compute at Manchester Leisure Center
June 26, 2025
Manchester
The Asanti Manchester data centre was acquired from Daisy Group in November 2022. The Manchester data centre offers 4000 sq ft of secure colocation hosting space.
| Distance | Site | About |
|---|---|---|
| 0.07 miles | Wavenet: Manchester ServerBank |
Wavenet Limited operates the ServerBank Manchester data center (also referred to as Manchester DC 13) at Bank House, Manchester, United Kingdom.
|
| 0.75 miles | Level3 Manchester | |
| 1.01 miles | iomart DC6 Manchester |
The iomart DC6 data center in Manchester (also known as Turing House) became part of iomart's portfolio in August 2012.
|
| 1.01 miles | iomart: Melbourne Turing House |
|
| 1.06 miles | Lunar 2 |
Lunar 2 in Manchester offers colocation with two data halls, 1,500 kg/m² floor load, an N+1 DX CRAC and In-Row cooling system, a 1.5 MVA incoming feed capacity and N+1 generator redundancy with 168-hour fuel capacity at full load.
|
| 1.06 miles | CapitaLand: Reynolds House |
|
| 1.06 miles | Equinix Manchester MA2 |
|
| 1.07 miles | Lunar 1 |
The Lunar 1 data center, located at Reynolds House in the Manchester Technopark, is an enterprise-grade colocation facility managed by Lunar Digital Solutions Ltd.
|
| 1.07 miles | iomart: DC7 Manchester |
In 2012, iomart Group plc acquired Melbourne Server Hosting, gaining two Manchester data centers—Turing House (DC6) and Reynolds House (DC7).
|
| 1.07 miles | DRT Manchester |
Reynold House is a three-storey triple net powered shell data centre located 13 km from Manchester International Airport and 290 km north west of London.
|
| 1.15 miles | ANS: MaNOC 8 | |
| 1.16 miles | Equinix Manchester MA4 |
|
| 1.19 miles | Equinix Manchester MA1 |
|
| 1.76 miles | Nasstar: Salford | |
| 1.98 miles | MSAI: Manchester |
Media Stream AI (MSAI) has unveiled a £50m ($67.2m) investment to develop a state-of-the-art AI data centre, robotics lab, and production facility at Anchorage Place in Salford’s Media City.
|
| 2.10 miles | Lunar 3 |
Lunar 3 offers four data halls, three IT zones, a 1,000 kg/m² floor load, 1.2 MVA DX CRAC cooling, and 2 MVA power with N+1 redundancy from two independent sources and one substation.
|
| 2.36 miles | Equinix Manchester MA3 |
|
| 2.36 miles | Computacenter: Manchester | |
| 2.43 miles | iomart: DC13 Manchester |
iomart acquired the LDeX Group in December 2018, and what was previously known as the LDeX2 Manchester site is now integrated into iomart's network as DC13.
|
| 2.47 miles | Datacentreplus: Manchester | |
| 2.88 miles | AtlasEdge: MAN001 | |
| 3.62 miles | Kao Data: Manchester |
Kao Data is developing a £350m data center at Kenwood Point, Stockport, UK.
|
| 3.68 miles | ANS: MaNOC 5, 6 & 7 |
The ANS MaNOC 5, 6, and 7 complex is a high-density data center campus in Trafford Park, Manchester, comprising three interconnected buildings designed for secure colocation and managed services.
|
| 3.73 miles | Pulsant: Manchester NW-1 |
|
| 3.82 miles | ANS: MaNOC 4 |
ANS MaNOC 4 is a high-security, carrier-neutral data center featuring approximately 20,000 sq ft of gross space and a capacity for over 300 racks.
|
| 5.76 miles | Digital L&D: Manchester, UK. |
Salford City Council has approved a £250m data center at Peel Waters’ Halo West site in Eccles, Salford, northwest of Manchester.
|
| 5.80 miles | Deep Green: Manchester DG01 |
Deep Green is to deploy an edge data center at the Move Urmston Leisure Center in southwest Manchester.
|
| 6.94 miles | TeleData | |
| 8.68 miles | LCRDC: Manchester Core |
LCRDC's Manchester data centre facility is located close to Manchester Airport’s City Enterprise Zone and is one of the best connected and well protected data centres in the UK.
|
| 13.90 miles | Intercity: Bolton |
The Intercity Technology data center in Bolton is a Tier 3 facility located at Hallmark House, Paragon Business Park.
|
| 16.00 miles | Level3 Warrington |
Asanti is a specialized colocation data centre provider led by a leadership team with extensive experience in the design, deployment, and management of mission-critical infrastructure. The company operates six strategically located data centres across the UK, selected for their superior network coverage and high power availability. By utilizing paired locations, Asanti provides robust business-live and disaster recovery options for critical IT workloads, all backed by a 99.99% uptime SLA and powered by 100% certified green energy.
June 26, 2025
Manchester
January 19, 2024
Manchester
November 10, 2022
Manchester
July 29, 2021
Manchester
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas