MCR2 is the newer of two data centres on Datum's Wythenshawe site. It stands next to MCR1, inside the same security perimeter. It replaced Simon House, a vacant two-storey office that once held a job centre, and opened after almost two years of demolition and construction.
The building holds up to 1,200 racks across several data halls, at 3.5 kW per rack as standard and up to 30 kW per rack on dual circuits with 2N power. Cooling uses chilled water with free cooling, designed for outdoor temperatures above 40°C, and the plant is ready to export waste heat to a future local heating network. Standby generators run on HVO fuel, and solar panels cover part of the roof. A police-linked alarm receiving centre on site serves both buildings, and IX Manchester has a core point of presence there. Keysource designed and built the facility.
Site History
- 2025-06-26: Councillor Emma Taylor cut the ribbon to open MCR2.
- 2025-03: Switchgear installation finished.
- 2024-07: The steel frame went up. The roof was complete by September 2024.
- 2024-04: Foundation work began on the cleared plot.
- 2023-10-03: Manchester City Council approved the plan to replace Simon House with a two-storey data centre.
- 2023-08: Demolition of Simon House began.
- 2023-02: Datum announced MCR2 as an expansion of the Teledata site it bought in September 2022.