Purpose-built from the ground up for data center operations, the Grand Rapids East, Michigan data center is benchmarked to TIA 942 Tier 3 and 4 standards, and incorporates enhanced security, power, and fire suppression. This West Michigan colocation facility is the newest of our two Grand Rapids data centers. With over 40,000 square feet of space for cages, cabinets, or racks, US Signal's Grand Rapids East data center is ready to meet any customers' colocation needs and specifications.
| Distance | Site | About |
|---|---|---|
| 1.69 miles | Switch: Grand Rapids 1 |
After gaining approval in 2021, construction on the first 312,000-square-foot (29,000 sqm) expansion of Pyramid Campus began in 2022.
|
| 1.69 miles | Switch: Grand Rapids 3 |
This facility is part of Switch's Pyramid Campus in Grand Rapids.
|
| 1.69 miles | Switch: Grand Rapids (The Pyramid Campus) |
The Grand Rapids campus is designed for up to 1.8 million square feet of data center space and up to 120 megawatts (MW) of power. It features one of the most unusual data center structures in the country, the Switch Pyramid.
|
| 1.90 miles | Switch: Grand Rapids 2 |
Switch is planning second expansion of its data center campus in Grand Rapids, Michigan. Construction of a third data center building on the site is expected to begin "sooner rather than later," with the investment projected to be "several hundred million dollars."
|
| 3.21 miles | Hyperscale Data Center Request Dataset |
Microsoft has filed a rezoning request for a 40.5-acre portion of its 316-acre holding in Gaines Township.
|
| 6.53 miles | 123NET: DC4 | |
| 6.53 miles | US Signal Grand Rapids South |
(2) - 800a 480V 3 phase
(2) 500kW diesel generators with 24 run time at full load
675kVa UPS with battery backup
|
| 6.58 miles | ManagedWay Byron Center | |
| 9.35 miles | Hyperscale Data Center Request Dataset |
Microsoft has revealed that it is behind a data center project in Lowell Township, Kent County. The project would see 235 acres developed into a data center campus.
|
| 10.45 miles | Hyperscale Data Center Request Dataset |
In 2024, Microsoft acquired a 144-acre property in Dorr Township, Allegan County, located along U.S. 131 at 14th st.
|
| 10.85 miles | Hyperscale Data Center Request Dataset |
In 2024, Microsoft acquired a 128-acre property in Dorr Township, Allegan County, located along U.S. 131 at 144th Avenue.
|
US Signal rings the Midwest with its fiber-optic network. The network connects subscribers in the metropolitan areas of Indianapolis, Detroit, Chicago, and 12 other cities. US Signal provides telecommunications services to institutional, enterprise, and wholesale customers in Illinois, Indiana, Michigan, and Wisconsin. It also provides Internet access, dark fiber capacity, and colocation services. The company's related infrastructure services include network design and construction. US Signal has supply partnerships with equipment manufacturers including ADTRAN and Cisco Systems. Source: hoovers.com
February 23, 2023
US Signal
June 30, 2021
Grand Rapids MI
October 21, 2018
US Signal
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas