Switch: Grand Rapids 3

Latest Podcast 6100 E Paris Ave SE
Planned
Future facility in planning stage
Operated by:

Switch: Grand Rapids 3

This facility is part of Switch's Pyramid Campus in Grand Rapids.

Map and Nearby Locations

6100 E Paris Ave SE
Switch Sites
Nearby Facilities

Switch: Grand Rapids 3 Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Switch: Grand Rapids 3

Distance Site About
0.19 miles Switch: Grand Rapids 1
After gaining approval in 2021, construction on the first 312,000-square-foot (29,000 sqm) expansion of Pyramid Campus began in 2022.
0.39 miles Switch: Grand Rapids (The Pyramid Campus)
The Grand Rapids campus is designed for up to 1.8 million square feet of data center space and up to 120 megawatts (MW) of power. It features one of the most unusual data center structures in the country, the Switch Pyramid.
0.58 miles Switch: Grand Rapids 2
Switch is planning second expansion of its data center campus in Grand Rapids, Michigan. Construction of a third data center building on the site is expected to begin "sooner rather than later," with the investment projected to be "several hundred million dollars."
1.42 miles Hyperscale Data Center Request Dataset
Planned Microsoft AI data center campus on ~414 acres at the northwest corner of Patterson Avenue SE and 76th Street SE in Gaines Charter Township, Kent County, southeast of Grand Rapids. Microsoft assembled the site through three transactions beginning August 2024 with a 316-acre purchase from Steelcase, expanded with 40.5 adjacent acres from Republic National Distributing in late 2024, and a third 57.8-acre Steelcase wood plant parcel under contract in 2026. Rezoning to light industrial is pending: the Gaines Township Planning Commission voted 7-0 to table the recommendation on April 15, 2026 following significant community opposition.
1.69 miles US Signal: MI01 Grand Rapids East
Purpose-built from the ground up for data center operations, the Grand Rapids East, Michigan data center is benchmarked to TIA 942 Tier 3 and 4 standards.
5.63 miles 123NET: DC4
5.63 miles US Signal Grand Rapids South
(2) - 800a 480V 3 phase (2) 500kW diesel generators with 24 run time at full load 675kVa UPS with battery backup
5.68 miles ManagedWay Byron Center
8.99 miles Hyperscale Data Center Request Dataset
In 2024, Microsoft acquired a 144-acre property in Dorr Township, Allegan County, located along U.S. 131 at 14th st.
9.37 miles Hyperscale Data Center Request Dataset
In 2024, Microsoft acquired a 128-acre property in Dorr Township, Allegan County, located along U.S. 131 at 144th Avenue.
9.72 miles Hyperscale Data Center Request Dataset
Microsoft has revealed that it is behind a data center project in Lowell Township, Kent County. The project would see 235 acres developed into a data center campus.

Switch: Grand Rapids 3 Data Center Photos See all

Operating Company

Operated by:

Switch, the technology infrastructure corporation headquartered in Las Vegas, Nevada is built on the intelligent and sustainable growth of the internet. Switch founder and CEO Rob Roy has developed more than 500 issued and pending patent claims covering data center designs that have manifested into the company’s world-renowned data centers.

Switch has PRIME campuses located in Las Vegas and Tahoe Reno, Nevada; Grand Rapids, Michigan; and Atlanta, Georgia.

40
Facilities
8
Markets

News See all

Read Iron County, Utah Data Center Proposal Gets Green Light
Plans for a 640-acre data center in Iron County, Utah, have been approved by local authorities. The Iron County Planning Commission voted in favor of the proposal during a meeting on June 4.

The...

Iron County, Utah Data Center Proposal Gets Green Light

June 13, 2026 Switch

Plans for a 640-acre data center in Iron County, Utah, have been approved by local authorities. The Iron County Planning Commission voted in favor of the proposal during a meeting on June 4. The Antelope Data Center campus will include five buildings totaling around 1.35 million sq ft (125,000...

Read more
Read Switch Expands Debt Facility to $9.5B to Fund AI Data Center Expansion
Data center firm Switch has increased its available debt capacity to $9.5 billion. The company now has access to a more than $6 billion corporate revolving credit facility, alongside an expanded $3...

Switch Expands Debt Facility to $9.5B to Fund AI Data Center Expansion

June 10, 2026 Switch

Data center firm Switch has increased its available debt capacity to $9.5 billion. The company now has access to a more than $6 billion corporate revolving credit facility, alongside an expanded $3.5 billion syndicated uncommitted performance letter of credit facility (LCF). In April, Switch...

Read more
Read Switch Plans New Data Center Campus Near Pittsburgh
Switch Plans New Data Center Campus Near Pittsburgh

Switch Plans New Data Center Campus Near Pittsburgh

May 01, 2026 Switch

US data center firm Switch is planning a new campus outside Pittsburgh, Pennsylvania. The company this week announced plans for a 382-acre development in Big Beaver Borough, Beaver County. The site is located around 40 miles (64km) northwest of Pittsburgh, near the Ohio state border. Full details...

Read more
Read Switch Adopts Nvidia Omniverse DSX Blueprint for EVO AI Data Center Design
Switch Adopts Nvidia Omniverse DSX Blueprint for EVO AI Data Center Design

Switch Adopts Nvidia Omniverse DSX Blueprint for EVO AI Data Center Design

March 16, 2026 Switch

Data center operator Switch has integrated Nvidia’s Omniverse DSX Blueprint into its EVO AI Factory architecture and LDC EVO operating system. The company introduced EVO last year, describing it as a new data center design capable of supporting up to 2MW per rack.LDC EVO is Switch's answer to...

Read more
Read Switch invests $772m in another Georgia facility outside Atlanta
Switch invests $772m in another Georgia facility outside Atlanta

Switch invests $772m in another Georgia facility outside Atlanta

September 01, 2023 Switch

Switch is preparing to construct a new data center facility in Bartow County, Georgia. Switch is preparing to build the "Switch KEEP 2.0 Atlanta North Campus" in Cartersville, according to the Developments of Regional Impact filings (DRI, 1-2). The 126-acre site is located in Cartersville, south...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?