123NET: DC4

Latest Podcast 400 76th Street SW
Operational
Fully operational facility
Operated by:

123NET: DC4

Year Built: 2012
░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Total Power
░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Map and Nearby Locations

400 76th Street SW ( Suite 12 )
123.net Sites
Nearby Facilities

123NET: DC4 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of 123NET: DC4

Distance Site About
0.01 miles US Signal Grand Rapids South
(2) - 800a 480V 3 phase (2) 500kW diesel generators with 24 run time at full load 675kVa UPS with battery backup
0.05 miles ManagedWay Byron Center
4.22 miles Plaza OneInterested in this information?Contact us
Planned Microsoft AI data center campus on ~414 acres at the northwest corner of Patterson Avenue SE and 76th Street SE in Gaines Charter Township, Kent County, southeast of Grand Rapids. Microsoft assembled the site through three transactions beginning August 2024 with a 316-acre purchase from Steelcase, expanded with 40.5 adjacent acres from Republic National Distributing in late 2024, and a third 57.8-acre Steelcase wood plant parcel under contract in 2026. Rezoning to light industrial is pending: the Gaines Township Planning Commission voted 7-0 to table the recommendation on April 15, 2026 following significant community opposition.
5.19 miles Metro RidgeInterested in this information?Contact us
In 2024, Microsoft acquired a 144-acre property in Dorr Township, Allegan County, located along U.S. 131 at 14th st.
5.63 miles Switch: Grand Rapids 3
This facility is part of Switch's Pyramid Campus in Grand Rapids.
5.67 miles TwoInterested in this information?Contact us
In 2024, Microsoft acquired a 128-acre property in Dorr Township, Allegan County, located along U.S. 131 at 144th Avenue.
5.80 miles Switch: Grand Rapids 1
After gaining approval in 2021, construction on the first 312,000-square-foot (29,000 sqm) expansion of Pyramid Campus began in 2022.
6.00 miles Switch: Grand Rapids (The Pyramid Campus)
The Grand Rapids campus is designed for up to 1.8 million square feet of data center space and up to 120 megawatts (MW) of power. It features one of the most unusual data center structures in the country, the Switch Pyramid.
6.10 miles Switch: Grand Rapids 2
Switch is planning second expansion of its data center campus in Grand Rapids, Michigan. Construction of a third data center building on the site is expected to begin "sooner rather than later," with the investment projected to be "several hundred million dollars."
6.53 miles US Signal: MI01 Grand Rapids East
Purpose-built from the ground up for data center operations, the Grand Rapids East, Michigan data center is benchmarked to TIA 942 Tier 3 and 4 standards.
15.32 miles Edge RidgeInterested in this information?Contact us
Microsoft has revealed that it is behind a data center project in Lowell Township, Kent County. The project would see 235 acres developed into a data center campus.

Operating Company

Operated by:

Founded in 1995, 123Net is privately owned and headquartered in Southfield, Michigan.

The company is a wireless, fiber, and data center provider.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Gerald R. Ford International Airport is building an operations center in Grand Rapids, Michigan
Gerald R. Ford International Airport is building an operations center in Grand Rapids, Michigan

Gerald R. Ford International Airport is building an operations center in Grand Rapids, Michigan

June 30, 2021 Grand Rapids MI

Gerald R. Ford International Airport is building a new operations and communications center, which includes, a data center in Grand Rapids, Michigan. The project will cost the Company $7.7 million. Gerald R. Ford International airport says the new facility will be on the east side of the...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?