Switch Adopts Nvidia Omniverse DSX Blueprint for EVO AI Data Center Design
March 16, 2026
Switch
The Grand Rapids campus is designed for up to 1.8 million square feet of data center space and up to 120 megawatts (MW) of power. It features one of the most unusual data center structures in the country, the Switch Pyramid.
The building was originally built in 1989 to house offices for the Steelcase furniture company. The first phase of construction is an adaptive reuse of the pyramid that will create 225,000 square feet of data center space.
The site has a Foucault pendulum suspended from the ceiling in the main lobby of the massive data center.
Switch acquired the 138-acre pyramid property in late 2017 for $22.2 million, two years after Steelcase sold the property for $4 million.
| Distance | Site | About |
|---|---|---|
| 0.20 miles | Switch: Grand Rapids 1 |
After gaining approval in 2021, construction on the first 312,000-square-foot (29,000 sqm) expansion of Pyramid Campus began in 2022.
|
| 0.25 miles | Switch: Grand Rapids 2 |
Switch is planning second expansion of its data center campus in Grand Rapids, Michigan. Construction of a third data center building on the site is expected to begin "sooner rather than later," with the investment projected to be "several hundred million dollars."
|
| 0.39 miles | Switch: Grand Rapids 3 |
This facility is part of Switch's Pyramid Campus in Grand Rapids.
|
| 1.52 miles | Hyperscale Data Center Request Dataset |
Microsoft has filed a rezoning request for a 40.5-acre portion of its 316-acre holding in Gaines Township.
|
| 1.69 miles | US Signal: MI01 Grand Rapids East |
Purpose-built from the ground up for data center operations, the Grand Rapids East, Michigan data center is benchmarked to TIA 942 Tier 3 and 4 standards.
|
| 6.00 miles | 123NET: DC4 | |
| 6.00 miles | US Signal Grand Rapids South |
(2) - 800a 480V 3 phase
(2) 500kW diesel generators with 24 run time at full load
675kVa UPS with battery backup
|
| 6.04 miles | ManagedWay Byron Center | |
| 9.24 miles | Hyperscale Data Center Request Dataset |
In 2024, Microsoft acquired a 144-acre property in Dorr Township, Allegan County, located along U.S. 131 at 14th st.
|
| 9.35 miles | Hyperscale Data Center Request Dataset |
Microsoft has revealed that it is behind a data center project in Lowell Township, Kent County. The project would see 235 acres developed into a data center campus.
|
| 9.60 miles | Hyperscale Data Center Request Dataset |
In 2024, Microsoft acquired a 128-acre property in Dorr Township, Allegan County, located along U.S. 131 at 144th Avenue.
|
Switch, the technology infrastructure corporation headquartered in Las Vegas, Nevada is built on the intelligent and sustainable growth of the internet. Switch founder and CEO Rob Roy has developed more than 500 issued and pending patent claims covering data center designs that have manifested into the company’s world-renowned data centers.
Switch has PRIME campuses located in Las Vegas and Tahoe Reno, Nevada; Grand Rapids, Michigan; and Atlanta, Georgia.
March 16, 2026
Switch
September 01, 2023
Switch
January 02, 2023
Switch
December 09, 2022
DigitalBridge
June 02, 2022
Switch
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas