Gerald R. Ford International Airport is building an operations center in Grand Rapids, Michigan
June 30, 2021
Grand Rapids MI
| Distance | Site | About |
|---|---|---|
| 0.05 miles | US Signal Grand Rapids South |
(2) - 800a 480V 3 phase
(2) 500kW diesel generators with 24 run time at full load
675kVa UPS with battery backup
|
| 0.05 miles | 123NET: DC4 | |
| 4.27 miles | Hyperscale Data Center Request Dataset |
Planned Microsoft AI data center campus on ~414 acres at the northwest corner of Patterson Avenue SE and 76th Street SE in Gaines Charter Township, Kent County, southeast of Grand Rapids. Microsoft assembled the site through three transactions beginning August 2024 with a 316-acre purchase from Steelcase, expanded with 40.5 adjacent acres from Republic National Distributing in late 2024, and a third 57.8-acre Steelcase wood plant parcel under contract in 2026. Rezoning to light industrial is pending: the Gaines Township Planning Commission voted 7-0 to table the recommendation on April 15, 2026 following significant community opposition.
|
| 5.16 miles | Hyperscale Data Center Request Dataset |
In 2024, Microsoft acquired a 144-acre property in Dorr Township, Allegan County, located along U.S. 131 at 14th st.
|
| 5.64 miles | Hyperscale Data Center Request Dataset |
In 2024, Microsoft acquired a 128-acre property in Dorr Township, Allegan County, located along U.S. 131 at 144th Avenue.
|
| 5.68 miles | Switch: Grand Rapids 3 |
This facility is part of Switch's Pyramid Campus in Grand Rapids.
|
| 5.85 miles | Switch: Grand Rapids 1 |
After gaining approval in 2021, construction on the first 312,000-square-foot (29,000 sqm) expansion of Pyramid Campus began in 2022.
|
| 6.04 miles | Switch: Grand Rapids (The Pyramid Campus) |
The Grand Rapids campus is designed for up to 1.8 million square feet of data center space and up to 120 megawatts (MW) of power. It features one of the most unusual data center structures in the country, the Switch Pyramid.
|
| 6.15 miles | Switch: Grand Rapids 2 |
Switch is planning second expansion of its data center campus in Grand Rapids, Michigan. Construction of a third data center building on the site is expected to begin "sooner rather than later," with the investment projected to be "several hundred million dollars."
|
| 6.58 miles | US Signal: MI01 Grand Rapids East |
Purpose-built from the ground up for data center operations, the Grand Rapids East, Michigan data center is benchmarked to TIA 942 Tier 3 and 4 standards.
|
| 15.37 miles | Hyperscale Data Center Request Dataset |
Microsoft has revealed that it is behind a data center project in Lowell Township, Kent County. The project would see 235 acres developed into a data center campus.
|
June 30, 2021
Grand Rapids MI
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas