Polar DC: DRA01

Latest Podcast Kleppeveien 302
Operational
Fully operational facility
Operated by:

Polar DC: DRA01

Year Built: 2026
PUE: 1.12
Utility Provider: De Nett
Ownership: Polar DC owns the real estate.
Lot Size: 15 acres

Sites leasing space from Polar DC:

░░░░ Request Dataset MW
Operational Power

DRA01 is building 1 of 2 on Polar DC's Tørdal campus in Drangedal, Telemark. Polar's local company, PolarDC DRA, owns the building, CBRE operates it, and Crusoe leases all of it for Crusoe Cloud. The building uses free cooling with rear-door heat exchangers or direct liquid cooling, runs on hydropower and has N+1 electrical infrastructure. It went live in early 2026, and Polar is building DRA02 next door.

Site History

  • March 2026: Polar announced that construction was complete.
  • December 2025: The site's grid connection was energized.
  • June 2025: Crusoe signed its lease.
  • October 2024: H.I.G. Capital took a majority stake in Polar DC.

Map and Nearby Locations

Kleppeveien 302 ( Kleppeveien 313 )
Polar DC Sites
Nearby Facilities

Polar DC: DRA01 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Polar DC: DRA01

Distance Site
0.01 miles Crusoe: Tordal
0.05 miles Polar DC: DRA02
0.06 miles Crusoe: Tordal DRA02

Operating Company

Operated by:

As a leading European data center operator, Polar DC is dedicated to meeting the unique and complex needs of HPC and AI workloads. Our vision is to accelerate infrastructure by developing state-of-the-art, very high-density data centers. We provide reliable, flexible, secure, and sustainable solutions, powered by the latest technology and a strong commitment to renewable energy.

0
Facilities
0
Markets

News See all

Read Crusoe Takes 40MW Second Phase At Polar's Hydro-Powered Norway Campus
[Crusoe](https://baxtel.com/data-centers/crusoe) will take a second, larger building at [Polar Data Centers](https://baxtel.com/data-centers/polar-dc)' Tørdal campus in Norway. Polar announced the ...

Crusoe Takes 40MW Second Phase At Polar's Hydro-Powered Norway Campus

October 22, 2026 Crusoe

Crusoe will take a second, larger building at Polar Data Centers' Tørdal campus in Norway. Polar announced the expansion on Oct. 21 (announcement). The new building, DRA02, will add 40MW of liquid-cooled critical IT capacity on hydroelectric power and is due online in late 2027. Crusoe plans...

Read more
Read Polar DC Secures €800 Million Senior Secured Bond for Norway Data Center Project
Polar DC Secures €800 Million Senior Secured Bond for Norway Data Center Project

Polar DC Secures €800 Million Senior Secured Bond for Norway Data Center Project

June 01, 2026 Polar DC

Nordic AI data center developer Polar DC has raised an €800 million ($932.2 million) senior secured bond in the Nordic bond market.The company, which is owned by alternative investment firm H.I.G. Capital, plans to use the proceeds to refinance existing debt tied to its first data center in...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.