Polar DC: DRA01

Latest Podcast Varpet Industrial Area
Operational
Fully operational facility
Operated by:

Polar DC: DRA01

Year Built: 2026
PUE: 1.12
Lot Size: 15 acres

Sites on this Campus:

Sites leasing space from Polar DC:

░░░░ Request Dataset MW
Operational Power

European data center firm Polar DC's DRA1 facility is located on a 60,600 sqm plot in southeast Norway. The site uses free cooling, with rear door heat exchangers or direct liquid cooling options for HPC. It lies in Norway's NO2 region, 219 km from Oslo, and is in phased development.

Specification


  • Highly connected and resilient interconnectivity
  • Energy source: 100% hydro power
  • Design: Redundant Utility Power. N+1 Electrical Infrastructure
  • Free cooling. Rear door heat exchangers or direct liquid cooling options for HPC

Map and Nearby Locations

Varpet Industrial Area ( Kleppeveien 313 )
Polar DC Sites
Nearby Facilities

Polar DC: DRA01 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Polar DC: DRA01

Distance Site About
0.04 miles Crusoe: Tordal
Crusoe has finalized a lease agreement for a data center in Norway to house Crusoe Cloud, its GPU cloud services.
0.05 miles Polar DC: DRA02
Polar DC is developing DRA02, an AI-ready expansion situated directly adjacent to its flagship DRA01 campus in Drangedal, Norway.

Operating Company

Operated by:

As a leading European data center operator, Polar DC is dedicated to meeting the unique and complex needs of HPC and AI workloads. Our vision is to accelerate infrastructure by developing state-of-the-art, very high-density data centers. We provide reliable, flexible, secure, and sustainable solutions, powered by the latest technology and a strong commitment to renewable energy.

0
Facilities
0
Markets

News See all

Read Crusoe Takes 40MW Second Phase At Polar's Hydro-Powered Norway Campus
[Crusoe](https://baxtel.com/data-centers/crusoe) will take a second, larger building at [Polar Data Centers](https://baxtel.com/data-centers/polar-dc)' Tørdal campus in Norway. Polar announced the ...

Crusoe Takes 40MW Second Phase At Polar's Hydro-Powered Norway Campus

October 22, 2026 Crusoe

Crusoe will take a second, larger building at Polar Data Centers' Tørdal campus in Norway. Polar announced the expansion on Oct. 21 (announcement). The new building, DRA02, will add 40MW of liquid-cooled critical IT capacity on hydroelectric power and is due online in late 2027. Crusoe plans...

Read more
Read Polar DC Secures €800 Million Senior Secured Bond for Norway Data Center Project
Polar DC Secures €800 Million Senior Secured Bond for Norway Data Center Project

Polar DC Secures €800 Million Senior Secured Bond for Norway Data Center Project

June 01, 2026 Polar DC

Nordic AI data center developer Polar DC has raised an €800 million ($932.2 million) senior secured bond in the Nordic bond market.The company, which is owned by alternative investment firm H.I.G. Capital, plans to use the proceeds to refinance existing debt tied to its first data center in...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.