Crusoe: Tordal

Latest Podcast
Varpet Industrial Area
Under ConstructionPlanned
Multi-phase construction project
Operated by:

Crusoe: Tordal

Year Planned: 2026
Ownership: Crusoe does not own the building.
This site is leased from Polar DC in the Polar DC: DRA1 building

Crusoe has finalized a lease agreement for a data center in Norway to house Crusoe Cloud, its GPU cloud services. This facility is anticipated to be operational later 2025 and has the potential to expand up to 52 megawatts (MW).

Map and Nearby Locations:

Varpet Industrial Area
Crusoe Sites
Nearby Facilities

Sites within 15 miles of Crusoe: Tordal

Distance Site About
0.04 miles Polar DC: DRA1
European data center firm Polar DC's DRA1 facility is located on a 60,600 sqm plot in southeast Norway.

Crusoe: Tordal Data Center Photos (See all)

Crusoe’s DFM system converts natural gas into electricity that powers wellsite digital operations
Source: Source: Crusoe Energy Systems

Operating Company

Operated by:

Crusoe is a privately held AI infrastructure developer and GPU cloud provider that builds AI data center campuses and offers GPU cloud services in the United States. The company began as Crusoe Energy Systems, a flare mitigation provider that powered onsite computing from stranded natural gas, with bitcoin mining as an early use case.

Crusoe is developing an AI campus at the Lancium Clean Campus in Abilene, Texas, planned for 1.2 GW, and in May 2025 it secured $11.6 billion in debt and equity to expand the site from two to eight buildings.

For this project, it is reported that Crusoe’s direct customer is Oracle and that OpenAI is Oracle’s customer; the Abilene campus is tied to OpenAI’s Stargate program;

OpenAI later announced an additional 4.5 GW Stargate partnership with Oracle that references the Abilene Stargate I site. Crusoe also expanded in-house manufacturing capability through the acquisition of Easter-Owens Electric in 2022.

Crusoe History:

  • In July 2025 announced a 1.8 GW AI data center campus with Tallgrass near Cheyenne, Wyoming.
  • In May, 2025, secured $11.6 billion in debt and equity to expand the Abilene, Texas campus to eight buildings, with Crusoe noting Oracle as the direct customer and OpenAI as Oracle’s customer for the site.
  • In March 2025 began construction on the second phase of the Abilene, Texas campus to bring total planned capacity to 1.2 GW.
  • In April 2022 raised Series C financing that included plans to launch the CrusoeCloud platform for high performance computing.
  • In June 2022 acquired Easter-Owens Electric to vertically integrate modular data center manufacturing.
  • Founded in 2018 as Crusoe Energy Systems to mitigate gas flaring by powering onsite computing, including bitcoin mining.