STACK: Rabbit Run Technology Park

Latest Podcast 14433 Germanna Hwy
Planned
Future facility in planning stage
Operated by:

STACK: Rabbit Run Technology Park

PUE: 1.5
Lot Size: 32 acres

The campus is designed for high-density AI and cloud workloads, with each data hall supporting 720 racks at 15kW apiece. Power will draw from a dedicated 230kV transmission project Dominion Energy is building specifically to serve the surrounding tech corridor, backed by on-site generators for redundancy. Sitting within Culpeper's Entrance Corridor Overlay District, the design incorporates textured precast concrete, screened rooftop equipment, and dark-sky compliant lighting to meet the county's architectural and environmental standards. The project remains under state and county regulatory review, with the broader corridor's buildout expected to continue into the 2030s.

Map and Nearby Locations

14433 Germanna Hwy
STACK INFRASTRUCTURE Sites
Nearby Facilities

Sites within 15 miles of STACK: Rabbit Run Technology Park

Distance Site About
0.25 miles Swift: Culpeper, VA
Swift operates a 90,000-square-foot facility on a 30-acre campus in Culpeper, Virginia.
0.31 miles Equinix Culpeper CU1
Equinix CU1 is a colocation data center in Building A at 18155 Technology Drive, Culpeper, Virginia. Terremark opened it in 2008 as the first building of the NAP of the Capital Region.
0.31 miles DataBank: IAD6
IAD6 will be the first data center constructed on DataBank’s new Culpeper campus in the Northern Virginia market.; it will offer 383,220 raised square feet of space.
0.38 miles Equinix Culpeper CU2
Equinix CU2 is a colocation data center in Building B at 18155 Technology Drive, Culpeper, Virginia. Terremark opened it in 2010 as the second building of the NAP of the Capital Region.
0.42 miles DataBank: IAD5
DataBank has acquired 85 acres of land in Culpeper, Virginia, for a new data center campus. The new Culpeper Campus will host two two-story data centers.
0.44 miles Equinix Culpeper CU4
Equinix CU4 is a colocation data center in Building D at 18155 Technology Drive, Culpeper, Virginia. Verizon opened the fourth building of the campus before Equinix bought it in 2017; Equinix expanded it in 2018.
0.45 miles Equinix Culpeper CU3
Equinix CU3 is a colocation data center in Building C at 18155 Technology Drive, Culpeper, Virginia. Terremark opened it in 2010 as the third building of the NAP of the Capital Region.
0.52 miles Peterson: Culpeper Bldg 7
0.58 miles Peterson: Culpeper Bldg 6
0.65 miles Peterson: Culpeper Bldg 5
0.68 miles CloudHQ: CLP 2
0.69 miles Peterson: Culpeper Bldg 4
0.69 miles CloudHQ: CLP 3
0.72 miles Peterson: Culpeper Bldg 3
0.76 miles CloudHQ: CLP1
Proposed campus in CulpeperIn early 2022, CloudHQ acquired a 40-hectare plot in Culpepper, Virginia.
0.76 miles Peterson: Culpeper Bldg 2
0.81 miles Peterson: Culpeper Bldg 1
Peterson Companies has obtained approval for its 150-acre data center campus. The campus is located on land along Route 799 (McDevitt Drive) and Route 699 (East Chandler Street) in Culpeper and will span 2,049,058 SF.
0.92 miles Peterson: Culpeper Bldg 8
0.98 miles STACK: Copper Ridge Expansion
1.24 miles STACK: CUL01
The proposed Copper Ridge site is immediately adjacent to Peterson Companies’ proposed 2.1 million sq ft data center campus.
1.31 miles Red Ace Bldg B
The Culpeper County Board of Supervisors in Virginia has approved the rezoning of the Red Ace Data Center campus, also known as the Keyser Road Data Center.
1.34 miles STACK: Culpeper
1.39 miles Red Ace Bldg A
The Culpeper County Board of Supervisors in Virginia has approved the rezoning of the Red Ace Data Center campus, also known as the Keyser Road Data Center.
1.42 miles Red Ace Bldg C
The Culpeper County Board of Supervisors in Virginia has approved the rezoning of the Red Ace Data Center campus, also known as the Keyser Road Data Center.
1.47 miles Red Ace Bldg D
The Culpeper County Board of Supervisors in Virginia has approved the rezoning of the Red Ace Data Center campus, also known as the Keyser Road Data Center.
1.59 miles EdgeCore: Culpeper
Data center firm EdgeCore is expanding in Virginia again with plans for a new campus in Culpeper County.
4.94 miles XX Tech Park
The proposed XX Tech Park rezoning could include over 4.6 million square feet of data centers in an area characterized by working farmland, less than a mile from the new State Park at Culpeper Battlefields.
5.74 miles Plaza GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.83 miles Ridge BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.88 miles Convergent Technology Park
Convergent VA has submitted revised conceptual plans for the Convergent Technology Park in Remington, Fauquier County, Virginia.
12.20 miles PointOne: Remington Expansion
12.20 miles PointOne: Remington 1
First building of PointOne's Remington Technology Park on Lucky Hill Road in Remington, Virginia, one of five planned buildings on the 234-acre campus.
12.25 miles Gigaland: Remington, VA
Gigaland has scrapped its initial plans for an 800MW data center campus in Fauquier County, Virginia, after facing local opposition. However, the company now plans to propose a smaller project for the site.
12.35 miles SAMX data center campus
SAMX Data LLC submitted an application in October 2023 to rezone approximately 55.26 acres of property at 11825 Remington Road.
16.00 miles Prime TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.13 miles Hub UltraInterested in this information?Contact us

STACK: Rabbit Run Technology Park Data Center Photos See all

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Source: Baxtel

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Operating Company

Operated by:

STACK Infrastructure is a privately held platform sponsored by IPI Partners that focuses on large scale wholesale capacity and campus development for hyperscale and enterprise customers.

The company was launched in 2019 when IPI combined the remaining Infomart Data Centers assets with selected T5 Data Centers facilities, and industry coverage at launch cited eight data centers across six U.S. markets totaling about 100 MW. In March 2022, IPI unified DigiPlex in the Nordics and SUPERNAP Italia in Milan under the STACK brand to form STACK EMEA, expanding the platform across Europe. STACK has since added international sites, including the first phase of a 56 MW campus in Toronto and its first Australian data center in Melbourne. Core services referenced by the company and trade press include wholesale colocation, build to suit, and powered shell solutions.

STACK Infrastructure History:

  • 2025: Sold its European enterprise colocation business (seven data centers in Stockholm, Oslo, Copenhagen, Milan and Geneva) to Apollo-managed funds; it now operates as Vaultica. STACK EMEA kept its hyperscale campuses.
  • 2023: Opened the first Australian data center in Melbourne on a multi-building campus.
  • 2023: Delivered the first 8 MW phase of a planned 56 MW campus in Toronto.
  • 2022: Rebranded DigiPlex (Nordics) and SUPERNAP Italia (Milan) as STACK EMEA.
  • 2019: IPI Partners launched STACK Infrastructure by combining the three Infomart Data Centers sites with selected T5 Data Centers assets. The company was rebranded as STACK INFRASTRUCTURE
  • 2018: ASB Real Estate Investments sold the three remaining Infomart Data Centers facilities in San Jose, Hillsboro, and Ashburn to IPI Partners; the Dallas Infomart carrier hotel was sold separately to Equinix earlier that year.
  • 2014: Acquired a facility in Ashburn that had been owned by AOL.
  • 2014: ASB Real Estate Fund, a subsidiary of DCI Technology Holdings, merged Infomart with Fortune Data Centers. The combined company was renamed to Infomart Data Centers.
  • 2012: Expanded to Oregon with a building in Hillsboro
  • 2007: John Sheputis purchased first Fortune Data Center in San Jose, CA, backed by ASB Real Estate
  • 2006: ASB Real Estate purchased Infomart Dallas building
  • 2006: Fortune Founded as Fortune Data Centers
0
Facilities
0
Markets

News See all

Read Amazon Settles With Two Former AWS Managers Over Data Center Kickbacks
Amazon has settled its civil claims against two former AWS real estate managers it accused of taking kickbacks on Northern Virginia data center deals. The company told a federal court on October 20...

Amazon Settles With Two Former AWS Managers Over Data Center Kickbacks

October 27, 2026 Amazon AWS

Amazon has settled its civil claims against two former AWS real estate managers it accused of taking kickbacks on Northern Virginia data center deals. The company told a federal court on October 20 that it had reached the agreement with Carl Nelson and Casey Kirschner, less than two weeks before...

Read more
Read Clayco and Kiewit Top Out First Building at Project Jupiter in New Mexico
Clayco and Kiewit New Mexico Co. topped out the 855,000-square-foot first building at Project Jupiter, a data center campus in Doña Ana County, [New Mexico](https://baxtel.com/regions/new-mexico). ...

Clayco and Kiewit Top Out First Building at Project Jupiter in New Mexico

October 27, 2026 STACK INFRASTRUCTURE

Clayco and Kiewit New Mexico Co. topped out the 855,000-square-foot first building at Project Jupiter, a data center campus in Doña Ana County, New Mexico. The contractors placed the final structural beam atop the building, completing its primary structural framework, Clayco announced on October...

Read more
Read Virginia Senator Perry Proposes Three-Year Statewide Data Center Moratorium
State Sen. Russet Perry on Tuesday released draft legislation that would halt approvals for new data centers across Virginia for three years, escalating the political fight over the industry's grow...

Virginia Senator Perry Proposes Three-Year Statewide Data Center Moratorium

October 15, 2026 Virginia

State Sen. Russet Perry on Tuesday released draft legislation that would halt approvals for new data centers across Virginia for three years, escalating the political fight over the industry's growth in the world's largest data center market. Senate Bill 843 would take effect July 1, 2027 and...

Read more
Read 2026 Is the Year Texas Passes Virginia in Data Center Capacity
[Texas](https://baxtel.com/data-center/texas) now has more data center capacity operating and under construction than [Virginia](https://baxtel.com/data-center/virginia). Baxtel tracks 28.3 GW buil...

2026 Is the Year Texas Passes Virginia in Data Center Capacity

October 13, 2026 Texas

Texas now has more data center capacity operating and under construction than Virginia. Baxtel tracks 28.3 GW built or building in Texas, against 17.8 GW in Virginia. On capacity already online, Virginia still leads, 12.3 GW to 11.1 GW. If projects scheduled for this year deliver on time, Texas...

Read more
Read Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations
Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations

Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations

August 23, 2024 Northern Virginia

A report from Synergy Research Group found that just twenty state or metro markets account for 62 percent of the world’s current hyperscale data center capacity. Northern Virginia tops this list while the Greater Beijing Area takes the second place, with both making up 22 percent of global...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?