STACK FRAL1

Latest Podcast
65835 Liederbach am Taunus
Under ConstructionPlanned
Multi-phase construction project
Operated by:

STACK FRAL1

Short Code: FRA01A
Year Planned: 2026
Lot Size: 17 acres

In 2022, STACK acquired the 17-acre site from Coca-Cola Europacific Partners Deutschland GmbH (CCEP DE), who operated a bottling and distribution plant at the location for more than 50 years.

The campus will accommodate up to two buildings.

Map and Nearby Locations:

65835 Liederbach am Taunus
STACK INFRASTRUCTURE Sites
Nearby Facilities

Sites within 15 miles of STACK FRAL1

Distance Site About
2.90 miles CloudHQ: FRA05
The facility will be located at CloudHQ's Höchst Campus (FRA03) in Frankfurt, Germany.
2.90 miles CloudHQ: FRA04
The facility will be located at CloudHQ's Höchst Campus (FRA03) in Frankfurt, Germany.
3.02 miles CloudHQ: Hochst Campus FRA03
CloudHQ's second Frankfurt-area campus is strategically located west of the Frankfurt metro, on the Höchst campus.
3.20 miles nLighten Frankfurt
3.50 miles maincubes: FRA03
maincubes is building its third data center in Frankfurt. The 27,000 sqm (290,600 sq ft) FRA03 will offer 7,500 sqm of white space across three floors and 6 data halls.
3.52 miles CyrusOne Frankfurt FRA3
3.57 miles Aroundtown: Frankfurt
German real estate company Aroundtown aims to repurpose the "tricubes" building at Wilhelm-Fay-Straße 30-34, a four-story office complex built in 2003 that previously housed IBM.
3.58 miles Cyrusone FRA6
FRA6 will offer a total IT capacity of 72MW over four floors, with each level delivering 18MW.
3.64 miles Data Castle: Frankfurt 1
Data Castle has started construction on its first data center in the town of Schwalbach am Taunus, just outside of Frankfurt.
3.64 miles CyrusOne Frankfurt IV
3.70 miles CyrusOne Frankfurt I
3.70 miles CyrusOne Frankfurt II
The facility was previously known as Zenium Frankfurt Two.
3.71 miles NTT Frankfurt 4
3.75 miles Digital Realty FRA29
3.76 miles CyrusOne Frankfurt FRA7
Construction is currently underway for the FRA7 data center campus, with first phase expected to be operational by Q2 2026.
3.77 miles maincubes: FRA02
Maincubes opened its second Frankfurt data center in 2024. The FRA02 facility offers 4,700 sqm of IT white space.
3.80 miles Digital Realty FRA32
3.80 miles Digital Realty FRA31
3.80 miles Digital Frankfurt Sossenheim
Located within an established data centre hub to the north west of Frankfurt, Digital Frankfurt – Wilhelm Fay Strasse provides a campus of 3 buildings, totaling 180,000 sqft. of net technical space. Each building provides 6 data suites of 10,000 sqft (Net space), together with 60,000 sq. ft. of ancillary space including dedicated offices, de-box rooms, test rooms and dedicated plant areas.
3.85 miles Colt Frankfurt Three
3.87 miles FKQ I Data Center
3.88 miles Colt Frankfurt West
Colt's new data center in Sossenheim is under construction and will be delivered in Q4 2021
3.90 miles Equinix Frankfurt FR8
Located in the Lärchenstrasse Campus, FR8 data center provides secure, resilient colocation services covered by 100% renewable energy.
3.94 miles Aruba: Germany DE1
The data center is equipped with autonomous power generators with underground fuel tanks able to provide energy to the entire data center even at full capacity.
3.95 miles Equinix Frankfurt FR4 FR6
4.39 miles Global Switch: Frankfurt North
Global Switch's Frankfurt campus – comprising two data centers – Frankfurt North (launched in 2019) and Frankfurt South, is located close to the financial district, city center, and Frankfurt International Airport, which is just 15 minutes away by car.
4.39 miles Global Switch: Frankfurt South
Global Switch's Frankfurt campus – comprising two data centers – Frankfurt North (launched in 2019) and Frankfurt South, is located close to the financial district, city center, and Frankfurt International Airport, which is just 15 minutes away by car.
4.42 miles Keppel Kelsterbach
The data centre has a total lettable area of approximately 540,869 sqft, and fully leased on a triple-net basis until the end of 2025.
4.46 miles Hyperscale Data Center Request Dataset
4.46 miles Digital Realty: FRA 34
Digital Realty's FRA33 and FRA34 facilities are situated within Digital's new campus on Kastengrund (known as Digital Park Hattersheim).
4.48 miles NTT Frankfurt 1 Campus
The almost 54,000 sqm campus, which is owned by e-shelter, offers space for five free-standing buildings
4.56 miles Digital Realty: Hattersheim FRA33
Digital Realty's FRA33 and FRA34 facilities are situated within Digital's new campus on Kastengrund (known as Digital Park Hattersheim).
5.28 miles NorthC: Frankfurt III
The NorthC Frankfurt 3 data center is a strategic colocation facility situated in the heart of Frankfurt's digital district.
5.73 miles Telehouse: FRA Bldg-C
This facility is part of Telehouse Germany's Frankfurt campus.
5.73 miles Verizon Frankfurt
5.73 miles Telehouse: FRA Bldg-M
This facility is part of Telehouse Germany's Frankfurt campus.
5.74 miles Telehouse: FRA Bldg-D
This facility is part of Telehouse Germany's Frankfurt campus.
5.76 miles Telehouse: FRA Bldg-N
This facility is part of Telehouse Germany's Frankfurt campus.
5.78 miles Telehouse: FRA Bldg-B
This facility is part of Telehouse Germany's Frankfurt campus.
5.79 miles Telehouse: Frankfurt Campus
A major 2026 expansion is planned for the Telehouse campus, bringing the total number of facilities to six.
5.81 miles Digital Lyoner Strasse 28
5.81 miles Rackspace Frankfurt FRA1
Rackspace maintains a small data center in Frankfurt
5.82 miles Equinix FR16
5.83 miles NewTelco Frankfurt (Rebstöckerstrasse)
5.86 miles ITENOS Frankfurt
5.86 miles Equinix Frankfurt FR5
5.88 miles Hyperscale Data Center Request Dataset
6.40 miles Equinix Frankfurt FR7
6.40 miles INAP FRA Gutleutstraße 310
6.46 miles euNetworks Frankfurt
6.73 miles IBM Frankfurt
7.19 miles Vantage FRA II
Vantage has completed the first data center on its Frankfurt II campus in 2022. The four-story facility offers 350,000 sq ft (33,000 sqm) of space.
7.27 miles VANTAGE: FRA II Bldg 2
Vantage's second data center on its Frankfurt II (FRA22) campus is a 130,000ft² facility situated on seven acres in Raunheim.
7.58 miles Colt Frankfurt City
7.74 miles Carrier-Neutral Data Center Request Dataset
Vantage plans to build another data center called FRA41 in Frankfurt.
7.80 miles Equinix Frankfurt FR1
7.97 miles Crypto Mining Data Center Request Dataset
Northern Data AG’s Frankfurt am Main data center was launched in December 2020,
7.97 miles NorthC: Frankfurt
European data center firm NorthC has acquired a plot of land in Frankfurt and commenced the development of a new data center.
7.97 miles NorthC: Frankfurt II
European data center company NorthC is expanding its presence in Germany by building a second facility in Frankfurt, set to open in 2026.
7.97 miles Edged Energy: Frankfurt
Edged Energy plans to build a data center in Frankfurt, Germany.
8.31 miles Iron Mountain Frankfurt FRA-2
The facility was previously known as "Keppel DC Frankfurt 1 (KDC FRA 1)" before being acquired by Iron Mountain in July 2021.
8.51 miles Citigroup Frankfurt
9.48 miles Goodman: FRA02-B
This facility is part of Goodman Group's Frankfurt II campus in Frankfurt.
9.53 miles China Mobile Frankfurt
9.54 miles Goodman: FRA II Campus
The former printing plant of the German newspaper Frankfurter Rundschau is being transformed into a state-of-the-art powered shell data centre campus situated just south of Frankfurt.
9.61 miles Goodman: FRA I Bldg2
This facility will be part of Goodman's Frankfurt I Campus in Germany.
9.67 miles Goodman: Frankfurt I
The Goodman FRA I Data Centre is a powered shell facility situated in Mörfelden-Walldorf, Germany.
9.91 miles FirstColo: Frankfurt Hanauer (AOC)
The firstcolo data center AOC, located on Hanauer Landstraße in Frankfurt am Main, offers a capacity of 390 racks, accommodating approximately 7,500 server systems.
9.94 miles Hyperscale Data Center Request Dataset
9.97 miles NTT Frankfurt 3
e-shelter Frankfurt 3 Campus is located in the business park "Blauer See" in Rüsselsheim.
10.00 miles NTT Frankfurt 2
10.23 miles Digital Realty: FRA15
FRA15 was built in four phases, providing in total 9,600 square meters of equipped space. The capital expenditure was expected to be around €175 million for the full build-out.
10.30 miles Digital Realty: FRA7
10.32 miles Digital Realty: FRA4
10.33 miles Digital Realty: FRA6
In 2018, Interxion (now Digital Realty) expanded its FRA6 data center in Frankfurt, Germany, by 400 sqm at a cost of €5 million.
10.36 miles Digital Realty: FRA2
10.37 miles Digital Realty: FRA3
Digital Realty, formerly Interxion, has been operating its third data center in Frankfurt, Germany, FRA3, since 2000.
10.39 miles Digital Realty: FRA5
10.40 miles Digital Realty: FRA14
FRA14 was constructed in two phases with 5,000 sqm of equipped space. The total capital expenditure associated with FRA14 was €76 million.
10.40 miles Hyperscale Data Center Request Dataset
10.41 miles Digital Realty: FRA9
Digital Realty's FRA9 is located within the Frankfurt Campus.
10.44 miles Digital Realty Frankfurt Campus
Digital Realty, formerly known as Interxion, has a significant presence in Frankfurt with a campus that has the densest concentration of networks in the city.
10.44 miles Digital Realty: FRA8
FRA 8 was built in four phases, with each phase providing approximately 900 square meters of equipped space. The facility was commissioned in 2014.
10.44 miles Digital Realty: FRA12
FRA12 provides approximately 1,100 square meters of equipped space. The capital expenditure associated with FRA12 is approximately €19 million.
10.47 miles Digital Realty: FRA10
10.48 miles Digital Realty: FRA16
10.50 miles Digital Realty: FRA11
10.53 miles Digital Realty: FRA13
FRA13 was constructed in two phases, providing 4,800 sqm of equipped space. The capital expenditure associated with FRA13 was approximately €90 million.
10.53 miles Mainova: Gwinnerstrasse 2
Mainova's new facility offers 10,500 square meters (113,000 sq ft) of space across two buildings.
10.55 miles Colt: Frankfurt 1
The site is in Frankfurt city center which is a prime location for data centres.
10.59 miles Mainova: Gwinnerstrasse
Mainova's new facility offers 10,500 square meters (113,000 sq ft) of space across two buildings.
10.64 miles Rackspace: FRA2
10.64 miles maincubes FRA01
The IT area is 4,200sqm, on three levels with two IT rooms of 700 sqm each
10.64 miles Keppel Maincubes Frankfurt
10.64 miles Equinix Frankfurt FR9x
10.65 miles Iron Mountain Frankfurt FRA-1
Iron Mountain developed FRA-1 thanks to a joint venture with AGC Equity Partners and in 2021 added FRA-2 through acquisition.
10.67 miles Equinix FR13
Equinix launched FR13 data center in Frankfurt, Germany. Located within Equinix’s Frankfurt North-East campus, the data center was first announced in November 2023.
10.68 miles Equinix Frankfurt FR11x
10.68 miles Vantage FRA1
The facility was acquired from Etix Everywhere in 2020. Vantage announced that it had acquired full ownership of the first data center, buying out its joint venture partners Energieversorgung Offenbach (EVO) and DataCenter-Group (DCG).
10.71 miles Equinix Frankfurt FR2
Located in Frankfurt, Germany's capital, Equinix FR2 is a financial low latency trading hub where many financial market participants deploy to get a low latency edge.
10.72 miles Vantage: FRA1 Bldg 3
10.75 miles Vantage: FRA1 Bldg 2
Vantage's second building FRA12 is located at its Offenbach data center campus in Frankfurt, Germany.
10.81 miles FirstColo: Werkhaus
FirstColo's Werkhaus facility has a capacity for more than 1,000 racks across 1,200 sqm (12,917 sq ft) of technical space.
10.95 miles Carrier-Neutral Data Center Request Dataset
Construction of FRA27 started in 2022 and topped out in 2023. The facility features an IT area of around 4,700 square meters, alongside four white spaces for colocation.
10.95 miles Digital Realty: FRA23
11.10 miles Mainova: Langen
Stadtwerke Langen and Mainova WebHouse GmbH & Co. KG, a wholly owned subsidiary of Mainova AG, plan to build an innovative data center in Langen's Neurott business center.
11.12 miles Digital Realty: FRA18
FRA18 offers 8,200 square meters of colocation space specifically designed to support high-performance computing (HPC) and artificial intelligence (AI) workloads.
11.14 miles Digital Realty: FRA20
FRA20, a new data center, is part of the Digital Realty's Digital Park Fechenheim campus in eastern Frankfurt, Germany. This five-level facility will offer approximately 8,140 square meters of white space.
11.18 miles Digital Realty: Digital Park Fechenheim
Digital Realty is building a massive new campus in Digital Park Fechenheim, the former headquarters of the Neckermann mail-order company.
11.24 miles Yondr: Frankfurt
In 2025, Yondr Group completed its data center project in Bischofsheim, near Frankfurt, Germany.
11.32 miles Carrier-Neutral Data Center Request Dataset
Vantage is building another data center campus called FRA61 in Frankfurt.
11.34 miles Carrier-Neutral Data Center Request Dataset
13.11 miles Green Mountain: FRA Mainz 3
Norwegian data center firm Green Mountain is developing a new campus outside of Frankfurt, Germany, forming a new joint venture with energy firm KMW.
13.13 miles Green Mountain: FRA Mainz 2
Norwegian data center firm Green Mountain is developing a new campus outside of Frankfurt, Germany, forming a new joint venture with energy firm KMW.
13.15 miles Green Mountain: FRA Mainz
Norwegian data center firm Green Mountain is developing a new campus outside of Frankfurt, Germany, forming a new joint venture with energy firm KMW.
13.40 miles CloudHQ: Offenbach Campus
CloudHQ, a hyperscale data center developer and operator in the United States and Europe, is currently constructing a 1.2 million sqft (108k sqm), hyperscale data center campus in Offenbach, Germany, a city which borders Frankfurt to the southeast.
13.50 miles CloudHQ: FRA-02
CloudHQ, a hyperscale data center developer and operator in the United States and Europe, is currently constructing a 1.2 million sqft (108k sqm), hyperscale data center campus in Offenbach, Germany, a city which borders Frankfurt to the southeast.
13.61 miles EdgeConneX: Heusenstamm
EdgeConneX plans a €600 million investment in Heusenstamm, near Frankfurt, Germany, to build two data centers.
14.09 miles DCP: Mainz
Data Center Partners (DCP), a German investor in data centers, has secured land in Mainz to develop a new data center.
14.18 miles Carrier-Neutral Data Center Request Dataset
Vantage plans to build a multi-building data center campus called FRA51 in Frankfurt.
14.23 miles Carrier-Neutral Data Center Request Dataset
This planned facility is part of Vantage's FRA-51 campus in Frankfurt.
14.27 miles Carrier-Neutral Data Center Request Dataset
This planned facility is part of Vantage's FRA-51 campus in Frankfurt.
14.30 miles Carrier-Neutral Data Center Request Dataset
This planned facility is part of Vantage's FRA-51 campus in Frankfurt.
14.34 miles Carrier-Neutral Data Center Request Dataset
This planned facility is part of Vantage's FRA-51 campus in Frankfurt.
14.57 miles maincubes: FRA04
Located in the Rhine-Main metropolitan area, south of Frankfurt in Dietzenbach, FRA04 will provide approximately 12,500 square meters (134,548 sq ft) of whitespace.
14.80 miles EdgeConneX: Maintal Campus
In Germany’s tightening data center market, EdgeConneX is making a strategic push into the Frankfurt metropolitan area with a proposed campus in Maintal.
14.92 miles EdgeConneX: Frankfurt EDCFRA01
The EdgeConneX EDCFRA01 data center in Dietzenbach is a high-density facility currently under construction on a 3.6-hectare campus.
15.27 miles ITecon Mainz
15.39 miles Firstcolo: Rosbach
German data center provider Firstcolo is constructing a new €250 million facility in Rosbach vor der Höhe, near Frankfurt.
17.35 miles Hyperscale Data Center Request Dataset
AWS is expanding its Frankfurt-area footprint with a new data center in Schöneck, Hesse.
19.72 miles CyrusOne Frankfurt V
CyrusOne has broken ground on its fifth data center in Frankfurt, FRA5. FRA5 is located in Hanau, 25km east of Frankfurt's city center.
The facility will span 18,000 sqm (193,750 sq ft) across two buildings.

STACK FRAL1 Data Center Photos (See all)

Rendering of Stack's FRAL1 data center in Frankfurt, Germany
Source: STACK Infrastructure

Operating Company

Operated by:

STACK Infrastructure is a privately held platform sponsored by IPI Partners that focuses on large scale wholesale capacity and campus development for hyperscale and enterprise customers.

The company was launched in 2019 when IPI combined the remaining Infomart Data Centers assets with selected T5 Data Centers facilities, and industry coverage at launch cited eight data centers across six U.S. markets totaling about 100 MW. In March 2022,

IPI unified DigiPlex in the Nordics and SUPERNAP Italia in Milan under the STACK brand to form STACK EMEA, expanding the platform across Europe. STACK has since added international sites, including the first phase of a 56 MW campus in Toronto and its first Australian data center in Melbourne. Core services referenced by the company and trade press include wholesale colocation, build to suit, and powered shell solutions.

STACK Infrastructure History:

  • 2023: Opened the first Australian data center in Melbourne on a multi-building campus.
  • 2023: Delivered the first 8 MW phase of a planned 56 MW campus in Toronto.
  • 2022: Rebranded DigiPlex (Nordics) and SUPERNAP Italia (Milan) as STACK EMEA.
  • 2019: IPI Partners launched STACK Infrastructure by combining the three Infomart Data Centers sites with selected T5 Data Centers assets. The company was rebranded as STACK INFRASTRUCTURE
  • 2018: ASB Real Estate Investments sold the three remaining Infomart Data Centers facilities in San Jose, Hillsboro, and Ashburn to IPI Partners; the Dallas Infomart carrier hotel was sold separately to Equinix earlier that year.
  • 2014: Acquired a facility in Ashburn that had been owned by AOL.
  • 2014: ASB Real Estate Fund, a subsidiary of DCI Technology Holdings, merged Infomart with Fortune Data Centers. The combined company was renamed to Infomart Data Centers.
  • 2012: Expanded to Oregon with a building in Hillsboro
  • 2007: John Sheputis purchased first Fortune Data Center in San Jose, CA, backed by ASB Real Estate
  • 2006: ASB Real Estate purchased Infomart Dallas building
  • 2006: Fortune Founded as Fortune Data Centers
118
Facilities
8
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?