Digital Realty Plans New Data Center in Milan
March 24, 2026
Digital Realty Trust
FRA13 was constructed in two phases, providing 4,800 sqm of equipped space. The capital expenditure associated with FRA13 was approximately €90 million.
• 4,800 m² IT-Space
• 2N UPS redundancy
• N+1 generator backup with SLA on refuelling
• 60 hrs diesel capacity with SLA
• Up to 99,999% availability
• High-density power configurations available
• Full range of AC and DC output currents
• 2N-Hexaload configuration
• ISO 27001
• ISO 22301
• ISO 9001
• ISO 14001
• ISO 50001
• PCI-DSS
| Distance | Site | About |
|---|---|---|
| 0.03 miles | Digital Realty: FRA11 |
|
| 0.05 miles | Digital Realty: FRA16 |
|
| 0.06 miles | Digital Realty: FRA10 |
|
| 0.08 miles | Digital Realty: FRA12 |
FRA12 provides approximately 1,100 square meters of equipped space. The capital expenditure associated with FRA12 is approximately €19 million.
|
| 0.09 miles | Digital Realty Frankfurt Campus |
Digital Realty, formerly known as Interxion, has a significant presence in Frankfurt with a campus that has the densest concentration of networks in the city.
|
| 0.10 miles | Digital Realty: FRA8 |
FRA 8 was built in four phases, with each phase providing approximately 900 square meters of equipped space. The facility was commissioned in 2014.
|
| 0.12 miles | Digital Realty: FRA9 |
Digital Realty's FRA9 is located within the Frankfurt Campus.
|
| 0.12 miles | Colt: Frankfurt 1 |
The site is in Frankfurt city center which is a prime location for data centres.
|
| 0.13 miles | Hyperscale Data Center Request Dataset | |
| 0.14 miles | Digital Realty: FRA5 |
|
| 0.14 miles | Digital Realty: FRA14 |
FRA14 was constructed in two phases with 5,000 sqm of equipped space. The total capital expenditure associated with FRA14 was €76 million.
|
| 0.17 miles | Digital Realty: FRA3 |
Digital Realty, formerly Interxion, has been operating its third data center in Frankfurt, Germany, FRA3, since 2000.
|
| 0.17 miles | Digital Realty: FRA2 |
|
| 0.19 miles | Digital Realty: FRA6 |
In 2018, Interxion (now Digital Realty) expanded its FRA6 data center in Frankfurt, Germany, by 400 sqm at a cost of €5 million.
|
| 0.21 miles | Digital Realty: FRA4 |
|
| 0.23 miles | Digital Realty: FRA7 |
|
| 0.31 miles | Digital Realty: FRA15 |
FRA15 was built in four phases, providing in total 9,600 square meters of equipped space. The capital expenditure was expected to be around €175 million for the full build-out.
|
| 0.50 miles | Digital Realty: FRA23 | |
| 0.50 miles | Carrier-Neutral Data Center Request Dataset |
Construction of FRA27 started in 2022 and topped out in 2023. The facility features an IT area of around 4,700 square meters, alongside four white spaces for colocation.
|
| 0.56 miles | NTT Frankfurt 2 |
|
| 0.66 miles | FirstColo: Frankfurt Hanauer (AOC) |
The firstcolo data center AOC, located on Hanauer Landstraße in Frankfurt am Main, offers a capacity of 390 racks, accommodating approximately 7,500 server systems.
|
| 0.68 miles | Digital Realty: FRA20 |
FRA20, a new data center, is part of the Digital Realty's Digital Park Fechenheim campus in eastern Frankfurt, Germany. This five-level facility will offer approximately 8,140 square meters of white space.
|
| 0.70 miles | Digital Realty: FRA18 |
FRA18 offers 8,200 square meters of colocation space specifically designed to support high-performance computing (HPC) and artificial intelligence (AI) workloads.
|
| 0.73 miles | Vantage: FRA1 Bldg 3 | |
| 0.73 miles | Digital Realty: Digital Park Fechenheim |
Digital Realty is building a massive new campus in Digital Park Fechenheim, the former headquarters of the Neckermann mail-order company.
|
| 0.75 miles | maincubes FRA01 |
The IT area is 4,200sqm, on three levels with two IT rooms of 700 sqm each
|
| 0.75 miles | Keppel Maincubes Frankfurt |
|
| 0.76 miles | Vantage: FRA1 Bldg 2 |
Vantage's second building FRA12 is located at its Offenbach data center campus in Frankfurt, Germany.
|
| 0.78 miles | Vantage FRA1 |
The facility was acquired from Etix Everywhere in 2020. Vantage announced that it had acquired full ownership of the first data center, buying out its joint venture partners Energieversorgung Offenbach (EVO) and DataCenter-Group (DCG).
|
| 0.94 miles | Iron Mountain Frankfurt FRA-1 |
Iron Mountain developed FRA-1 thanks to a joint venture with AGC Equity Partners and in 2021 added FRA-2 through acquisition.
|
| 1.08 miles | Mainova: Gwinnerstrasse 2 |
Mainova's new facility offers 10,500 square meters (113,000 sq ft) of space across two buildings.
|
| 1.11 miles | Mainova: Gwinnerstrasse |
Mainova's new facility offers 10,500 square meters (113,000 sq ft) of space across two buildings.
|
| 1.26 miles | Equinix FR13 |
Equinix launched FR13 data center in Frankfurt, Germany. Located within Equinix’s Frankfurt North-East campus, the data center was first announced in November 2023.
|
| 1.29 miles | Equinix Frankfurt FR11x | |
| 1.36 miles | FirstColo: Werkhaus |
FirstColo's Werkhaus facility has a capacity for more than 1,000 racks across 1,200 sqm (12,917 sq ft) of technical space.
|
| 1.51 miles | Equinix Frankfurt FR9x | |
| 1.59 miles | Equinix Frankfurt FR2 |
Located in Frankfurt, Germany's capital, Equinix FR2 is a financial low latency trading hub where many financial market participants deploy to get a low latency edge.
|
| 1.62 miles | Rackspace: FRA2 |
|
| 2.63 miles | NorthC: Frankfurt |
European data center firm NorthC has acquired a plot of land in Frankfurt and commenced the development of a new data center.
|
| 2.63 miles | Crypto Mining Data Center Request Dataset |
Northern Data AG’s Frankfurt am Main data center was launched in December 2020,
|
| 2.63 miles | NorthC: Frankfurt II |
European data center company NorthC is expanding its presence in Germany by building a second facility in Frankfurt, set to open in 2026.
|
| 2.63 miles | Edged Energy: Frankfurt |
Edged Energy plans to build a data center in Frankfurt, Germany.
|
| 2.73 miles | Equinix Frankfurt FR1 | |
| 2.96 miles | Colt Frankfurt City |
|
| 2.99 miles | CloudHQ: Offenbach Campus |
CloudHQ, a hyperscale data center developer and operator in the United States and Europe, is currently constructing a 1.2 million sqft (108k sqm), hyperscale data center campus in Offenbach, Germany, a city which borders Frankfurt to the southeast.
|
| 3.07 miles | CloudHQ: FRA-02 |
CloudHQ, a hyperscale data center developer and operator in the United States and Europe, is currently constructing a 1.2 million sqft (108k sqm), hyperscale data center campus in Offenbach, Germany, a city which borders Frankfurt to the southeast.
|
| 4.21 miles | euNetworks Frankfurt | |
| 4.52 miles | INAP FRA Gutleutstraße 310 | |
| 4.53 miles | Equinix Frankfurt FR7 | |
| 4.62 miles | EdgeConneX: Maintal Campus |
In Germany’s tightening data center market, EdgeConneX is making a strategic push into the Frankfurt metropolitan area with a proposed campus in Maintal.
|
| 4.68 miles | EdgeConneX: Heusenstamm |
EdgeConneX plans a €600 million investment in Heusenstamm, near Frankfurt, Germany, to build two data centers.
|
| 4.97 miles | Hyperscale Data Center Request Dataset | |
| 4.98 miles | Equinix Frankfurt FR5 |
|
| 4.98 miles | ITENOS Frankfurt | |
| 4.98 miles | NewTelco Frankfurt (Rebstöckerstrasse) | |
| 4.98 miles | Equinix FR16 | |
| 5.01 miles | Carrier-Neutral Data Center Request Dataset | |
| 5.03 miles | Carrier-Neutral Data Center Request Dataset |
Vantage is building another data center campus called FRA61 in Frankfurt.
|
| 5.14 miles | Telehouse: Frankfurt Campus |
A major 2026 expansion is planned for the Telehouse campus, bringing the total number of facilities to six.
|
| 5.17 miles | Telehouse: FRA Bldg-B |
This facility is part of Telehouse Germany's Frankfurt campus.
|
| 5.20 miles | Verizon Frankfurt | |
| 5.20 miles | Telehouse: FRA Bldg-C |
This facility is part of Telehouse Germany's Frankfurt campus.
|
| 5.20 miles | Telehouse: FRA Bldg-N |
This facility is part of Telehouse Germany's Frankfurt campus.
|
| 5.21 miles | Telehouse: FRA Bldg-D |
This facility is part of Telehouse Germany's Frankfurt campus.
|
| 5.21 miles | Telehouse: FRA Bldg-M |
This facility is part of Telehouse Germany's Frankfurt campus.
|
| 5.43 miles | NorthC: Frankfurt III |
The NorthC Frankfurt 3 data center is a strategic colocation facility situated in the heart of Frankfurt's digital district.
|
| 5.80 miles | Digital Lyoner Strasse 28 |
|
| 5.80 miles | Rackspace Frankfurt FRA1 |
Rackspace maintains a small data center in Frankfurt
|
| 5.81 miles | Goodman: FRA02-B |
This facility is part of Goodman Group's Frankfurt II campus in Frankfurt.
|
| 5.87 miles | Goodman: FRA II Campus |
The former printing plant of the German newspaper Frankfurter Rundschau is being transformed into a state-of-the-art powered shell data centre campus situated just south of Frankfurt.
|
| 6.09 miles | Citigroup Frankfurt | |
| 6.17 miles | NTT Frankfurt 1 Campus |
The almost 54,000 sqm campus, which is owned by e-shelter, offers space for five free-standing buildings
|
| 6.21 miles | Hyperscale Data Center Request Dataset | |
| 6.30 miles | Global Switch: Frankfurt South |
Global Switch's Frankfurt campus – comprising two data centers – Frankfurt North (launched in 2019) and Frankfurt South, is located close to the financial district, city center, and Frankfurt International Airport, which is just 15 minutes away by car.
|
| 6.32 miles | Global Switch: Frankfurt North |
Global Switch's Frankfurt campus – comprising two data centers – Frankfurt North (launched in 2019) and Frankfurt South, is located close to the financial district, city center, and Frankfurt International Airport, which is just 15 minutes away by car.
|
| 6.73 miles | Colt Frankfurt West |
Colt's new data center in Sossenheim is under construction and will be delivered in Q4 2021
|
| 6.73 miles | Colt Frankfurt Three |
|
| 6.83 miles | Iron Mountain Frankfurt FRA-2 |
The facility was previously known as "Keppel DC Frankfurt 1 (KDC FRA 1)" before being acquired by Iron Mountain in July 2021.
|
| 6.84 miles | Digital Realty FRA32 | |
| 6.84 miles | Digital Frankfurt Sossenheim |
Located within an established data centre hub to the north west of Frankfurt, Digital Frankfurt – Wilhelm Fay Strasse provides a campus of 3 buildings, totaling 180,000 sqft. of net technical space. Each building provides 6 data suites of 10,000 sqft (Net space), together with 60,000 sq. ft. of ancillary space including dedicated offices, de-box rooms, test rooms and dedicated plant areas.
|
| 6.84 miles | Digital Realty FRA31 | |
| 6.87 miles | Digital Realty FRA29 | |
| 6.91 miles | Equinix Frankfurt FR4 FR6 |
|
| 6.93 miles | Aruba: Germany DE1 |
The data center is equipped with autonomous power generators with underground fuel tanks able to provide energy to the entire data center even at full capacity.
|
| 6.96 miles | CyrusOne Frankfurt I |
|
| 6.96 miles | CyrusOne Frankfurt II |
The facility was previously known as Zenium Frankfurt Two.
|
| 6.97 miles | Equinix Frankfurt FR8 |
Located in the Lärchenstrasse Campus, FR8 data center provides secure, resilient colocation services covered by 100% renewable energy.
|
| 7.01 miles | CyrusOne Frankfurt IV | |
| 7.08 miles | FKQ I Data Center | |
| 7.08 miles | Cyrusone FRA6 |
FRA6 will offer a total IT capacity of 72MW over four floors, with each level delivering 18MW.
|
| 7.11 miles | Aroundtown: Frankfurt |
German real estate company Aroundtown aims to repurpose the "tricubes" building at Wilhelm-Fay-Straße 30-34, a four-story office complex built in 2003 that previously housed IBM.
|
| 7.17 miles | CyrusOne Frankfurt FRA3 |
|
| 7.27 miles | maincubes: FRA04 |
Located in the Rhine-Main metropolitan area, south of Frankfurt in Dietzenbach, FRA04 will provide approximately 12,500 square meters (134,548 sq ft) of whitespace.
|
| 7.30 miles | CyrusOne Frankfurt FRA7 |
Construction is currently underway for the FRA7 data center campus, with first phase expected to be operational by Q2 2026.
|
| 7.34 miles | EdgeConneX: Frankfurt EDCFRA01 |
The EdgeConneX EDCFRA01 data center in Dietzenbach is a high-density facility currently under construction on a 3.6-hectare campus.
|
| 8.23 miles | Hyperscale Data Center Request Dataset |
AWS is expanding its Frankfurt-area footprint with a new data center in Schöneck, Hesse.
|
| 8.24 miles | nLighten Frankfurt | |
| 8.26 miles | IBM Frankfurt | |
| 9.19 miles | CyrusOne Frankfurt V |
CyrusOne has broken ground on its fifth data center in Frankfurt, FRA5. FRA5 is located in Hanau, 25km east of Frankfurt's city center.
The facility will span 18,000 sqm (193,750 sq ft) across two buildings. |
| 9.21 miles | CloudHQ: FRA05 |
The facility will be located at CloudHQ's Höchst Campus (FRA03) in Frankfurt, Germany.
|
| 9.23 miles | CloudHQ: Hochst Campus FRA03 |
CloudHQ's second Frankfurt-area campus is strategically located west of the Frankfurt metro, on the Höchst campus.
|
| 9.30 miles | CloudHQ: FRA04 |
The facility will be located at CloudHQ's Höchst Campus (FRA03) in Frankfurt, Germany.
|
| 9.50 miles | maincubes: FRA03 |
maincubes is building its third data center in Frankfurt. The 27,000 sqm (290,600 sq ft) FRA03 will offer 7,500 sqm of white space across three floors and 6 data halls.
|
| 9.50 miles | Data Castle: Frankfurt 1 |
Data Castle has started construction on its first data center in the town of Schwalbach am Taunus, just outside of Frankfurt.
|
| 9.50 miles | Mainova: Langen |
Stadtwerke Langen and Mainova WebHouse GmbH & Co. KG, a wholly owned subsidiary of Mainova AG, plan to build an innovative data center in Langen's Neurott business center.
|
| 9.74 miles | maincubes: FRA02 |
Maincubes opened its second Frankfurt data center in 2024. The FRA02 facility offers 4,700 sqm of IT white space.
|
| 9.88 miles | Data4: Frankfurt |
French data center firm Data4 is building a huge campus in Hanau, Germany.
|
| 9.92 miles | Data4: Frankfurt DC2 |
This data center is a part of Data4's Frankfurt Campus in Germany.
|
| 9.94 miles | Data4: Frankfurt DC7 |
This data center is a part of Data4's Frankfurt Campus in Germany.
|
| 9.96 miles | Data4: Frankfurt DC3 |
This data center is a part of Data4's Frankfurt Campus in Germany.
|
| 10.00 miles | Data4: Frankfurt DC4 |
This data center is a part of Data4's Frankfurt Campus in Germany.
|
| 10.00 miles | Data4: Frankfurt DC8 |
This data center is a part of Data4's Frankfurt Campus in Germany.
|
| 10.03 miles | Data4: Frankfurt DC5 |
This data center is a part of Data4's Frankfurt Campus in Germany.
|
| 10.07 miles | Data4: Frankfurt DC6 |
This data center is a part of Data4's Frankfurt Campus in Germany.
|
| 10.38 miles | Hyperscale Data Center Request Dataset |
In 2020, Google acquired 11.6 hectares of land in Zum Fliegerhorst, Germany.
|
| 10.39 miles | Hyperscale Data Center Request Dataset |
Google has opened its first data centre in Hanau, Germany.
|
| 10.53 miles | STACK FRAL1 |
In 2022, STACK acquired the 17-acre site from Coca-Cola Europacific Partners Deutschland GmbH (CCEP DE), who operated a bottling and distribution plant at the location for more than 50 years.
|
| 10.62 miles | Keppel Kelsterbach |
The data centre has a total lettable area of approximately 540,869 sqft, and fully leased on a triple-net basis until the end of 2025.
|
| 11.56 miles | China Mobile Frankfurt | |
| 11.61 miles | Goodman: FRA I Bldg2 |
This facility will be part of Goodman's Frankfurt I Campus in Germany.
|
| 11.65 miles | Goodman: Frankfurt I |
The Goodman FRA I Data Centre is a powered shell facility situated in Mörfelden-Walldorf, Germany.
|
| 12.02 miles | NTT Frankfurt 4 |
|
| 12.66 miles | Firstcolo: Rosbach |
German data center provider Firstcolo is constructing a new €250 million facility in Rosbach vor der Höhe, near Frankfurt.
|
| 13.18 miles | Digital Realty: FRA 34 |
Digital Realty's FRA33 and FRA34 facilities are situated within Digital's new campus on Kastengrund (known as Digital Park Hattersheim).
|
| 13.28 miles | Digital Realty: Hattersheim FRA33 |
Digital Realty's FRA33 and FRA34 facilities are situated within Digital's new campus on Kastengrund (known as Digital Park Hattersheim).
|
| 13.77 miles | NewTelco: Karlstein, Germany |
German data center provider NewTelco has opened a new data center with an IT capacity of 5MW in Karlstein am Main, Germany. The facility is located in the Karlstein municipality just east of Frankfurt.
|
| 14.34 miles | Vantage FRA II |
Vantage has completed the first data center on its Frankfurt II campus in 2022. The four-story facility offers 350,000 sq ft (33,000 sqm) of space.
|
| 14.38 miles | VANTAGE: FRA II Bldg 2 |
Vantage's second data center on its Frankfurt II (FRA22) campus is a 130,000ft² facility situated on seven acres in Raunheim.
|
| 15.00 miles | Hyperscale Data Center Request Dataset |
In 2021, Google acquired a plot of land approximately 58,000 square meters in Dietzenbach, suitable for data center construction.
|
| 15.35 miles | Carrier-Neutral Data Center Request Dataset |
Vantage plans to build another data center called FRA41 in Frankfurt.
|
| 16.33 miles | NTT Frankfurt 3 |
e-shelter Frankfurt 3 Campus is located in the business park "Blauer See" in Rüsselsheim.
|
| 16.34 miles | Hyperscale Data Center Request Dataset | |
| 18.23 miles | Carrier-Neutral Data Center Request Dataset |
Vantage plans to build a multi-building data center campus called FRA51 in Frankfurt.
|
| 18.27 miles | Carrier-Neutral Data Center Request Dataset |
This planned facility is part of Vantage's FRA-51 campus in Frankfurt.
|
| 18.30 miles | Carrier-Neutral Data Center Request Dataset |
This planned facility is part of Vantage's FRA-51 campus in Frankfurt.
|
| 18.33 miles | Carrier-Neutral Data Center Request Dataset |
This planned facility is part of Vantage's FRA-51 campus in Frankfurt.
|
| 18.36 miles | Carrier-Neutral Data Center Request Dataset |
This planned facility is part of Vantage's FRA-51 campus in Frankfurt.
|
| 19.96 miles | Yondr: Frankfurt |
In 2025, Yondr Group completed its data center project in Bischofsheim, near Frankfurt, Germany.
|
Digital Realty Trust is a data center public REIT that owns and operates facilities in the United States and Europe. The company provides colocation and interconnection services and develops large multi‑tenant data centers for enterprise and cloud customers.
Its European platform expanded through the combination with Interxion, and through the purchase of European sites divested by Equinix following Equinix’s acquisition of TelecityGroup. The Telx acquisition added a U.S. interconnection and colocation business to Digital Realty’s portfolio.
Digital Realty Trust History:
March 24, 2026
Digital Realty Trust
March 11, 2026
Digital Realty Trust
March 04, 2026
Digital Realty Trust
November 27, 2025
Digital Realty Trust
November 21, 2025
Digital Realty Trust
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas