QTS Richmond

Login to Add Favorite Login to Get a Quote
Login to Add Favorite Login to Get a Quote
Site: QTS Richmond

Company: QTS Data Centers
Metro: Richmond
Country: Virginia
Country: United States
Region: North America
Region: Americas
Address:
Utility Provider: Dominion
Site Stats:
Current Under Construction Potential Expansion Total at Full Buildout
Building SqFt: 1,300,000 1,300,000
Gross SqFt: 550,000 550,000
Usable SqFt: 183,000 183,000
Office SqFt: 100,000 100,000
Power (MW): 44.00 66.00 110.00

QTS massive data center in Richmond sits on 110 acres with an additional 100 acres available for future development. There are 3 building on the campus with a total potential floor space of 550,000 square feet

Building 1: A 150,000 sqft building
Building 2: A 200,000 sqft building with 130,000 of datacenter space

In years since QTS acquired the former Qimonda semiconductor plant in the White Oak Technology Park, the company has been steadily outfitting the 1.5 million-square-foot complex as one of its “mega” data centers.

Data Center Notes:


  • QTS acquired the former 1.3 million SF Qimonda semiconductor fabrication facility in April 2010. [1]
  • Plans to build out over 500,000 Sqft of raised floor, although only approximately 183,000 SqFt is currently built out.
  • Office space is available

References:


1. Data Center Knowledge article April 5, 2010

Map and Nearby Locations:

6000 Technology Blvd, Sandston, VA