Grain Backs Parent Company of Prime Data Centers
April 09, 2026
Prime Data Centers
Prime Data Centers is building a $1.3 billion data center campus in Caldwell County, outside of Austin, Texas. The development will be located along Farm to Market Road 2720 in the county and will be a "turn-key" data center campus. Three buildings are scheduled to be completed during the $1.3 billion phase 1 of the project. Each data center building is 262,000-square-feet and two stories.
Update: Prime Data Centers LLC on March 2024 secured approval for financial incentives from the Caldwell County Commissioners Court for the $1.3 billion first phase of the planned turnkey data center campus. Phase 1 will consist a 262,000-square-foot building.
| Distance | Site | About |
|---|---|---|
| 0.21 miles | Prime: Austin 2 |
The facility is a part of Prime's Austin Data Center Campus in Texas.
|
| 0.27 miles | Prime: Austin 3 |
The facility is a part of Prime's Austin Data Center Campus in Texas.
|
| 1.45 miles | Tract: Caldwell Valley |
Tract plans to develop a data center park in Uhland, Texas, a city spanning Caldwell and Hays counties approximately 30 miles south of Austin.
|
| 15.87 miles | Sabey: San Macros, TX |
Sabey, a US data center firm, plans to develop a new campus on 786 acres in San Marcos, Texas.
|
| 17.37 miles | Highlander SM One: San Marcos, TX |
Highlander SM One LLC, represented by Armbrust & Brown PLLC, is seeking to rezone the land from Conservation Cluster to Light Industrial and annex 53.57 acres of the property.
|
| 18.24 miles | CloudBurst: San Marcos, TX |
CloudBurst, a new US data center developer focused on artificial intelligence (AI), is building a natural gas-powered facility in Texas.
|
| 18.79 miles | EdgeConneX: Austin AUS01 |
Located in the tech-forward Cedar Creek area of Bastrop County, EdgeConneX AUS01 is the high-performance anchor of a massive new data center campus.
|
| 18.83 miles | EdgeConneX: AUS02 |
The upcoming AUS02 facility is designed as a massive two-story structure, set to encompass 578,000 square feet (approximately 54,000 square meters) of high-density data center space.
|
| 19.02 miles | Lumen Austin 1 (4207 Smith School) | |
| 19.10 miles | EdgeConneX: AUS03 |
This facility is part of the EdgeConneX data center campus in Bastrop, Texas.
|
| 19.17 miles | EdgeConneX: AUS04 |
This facility is part of the EdgeConneX data center campus in Bastrop, Texas.
|
| 19.20 miles | Switch: Texas 1 |
Built in 2011, Texas 1 resides on the Data Ranch. The 40-acre campus has plenty of expansion capability. The campus can grow to over 1 million sqft and 100 MW of power.
The first phase of Data Foundry's Texas 2 site was opened in 2018.
|
| 19.20 miles | Switch: Texas 2 |
2nd building on the former Data Foundry Campus
|
| 19.35 miles | Switch: Smith School Rd |
Switch Inc. reportedly intends to build a 300,000-square-foot (27,870 sqm) data center alongside a new Austin Energy substation.
|
| 19.39 miles | LightEdge Austin2 Burleson |
The site was formerly operated by OnRamp before being acquired in July 2018.
|
| 19.77 miles | DataCanopy: Austin, TX |
Data Canopy's Austin, TX facility delivers exceptional connectivity and 100% power uptime within a state-of-the-art environment secured by industry-leading features.
|
| 19.79 miles | CyrusOne Austin II |
Supports 250 wpsf with the ability to support over 1,000 wpsf
Raised Floor: 48"
|
| 19.82 miles | CyrusOne: Austin III |
CyrusOne's AUS3 data center is projected to be the company's largest facility in Austin, spanning 172,000 total square feet, which includes 120,000 square feet of colocation space (CSF) and over 25,000 square feet of Class A office space.
|
Prime Data Centers develops, acquires, and operates data centers for large enterprises and hyper-scalers. Through our own properties, customer assets (sale-leaseback), or greenfield developments, Prime delivers build-to-suit, powered-shell and turn-key solutions.
April 09, 2026
Prime Data Centers
March 27, 2026
Prime Data Centers
February 13, 2025
Austin
November 14, 2024
Prime Data Centers
May 21, 2024
Prime Data Centers
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas