Fujitsu Oslo

Latest Podcast
Østensjøveien 32
Operational
Fully operational facility
Operated by:

Fujitsu Oslo

Map and Nearby Locations:

Østensjøveien 32
Fujitsu Sites
Nearby Facilities

Sites within 15 miles of Fujitsu Oslo

Distance Site About
0.92 miles STACK OSL01 Ulven
1.16 miles TeliaSonera Oslo
1.28 miles Skygard: Hovinbyen, Oslo
Construction has begun on the first facility in Hovinbyen, Oslo, following a joint investment of NOK 2.4 billion (approximately $200 million).
1.78 miles Hyperscale Data Center Request Dataset
Microsoft launched its Azure cloud region in Norway in 2019
2.03 miles Bulk: Oslo Internet Exchange (OS-IX)
Bulk Infrastructure has begun the expansion of its Oslo Internet Exchange facility (OS-IX) in Norway. The expansion will see three new data halls built, adding 5.5MW of IT capacity.
2.03 miles IP-Only HMG9
2.03 miles Verizon Oslo
2.06 miles Polar DC: OSL01
2.46 miles Blix CJH Oslo
2.89 miles Basefarm Oslo OSL3
3.02 miles IP-Only: Availo DC0
3.03 miles Blix Gullhaugveien
3.04 miles Blix BDC Oslo
3.56 miles Orange: Grorud OSL3
Orange Business OSL3 Data Center is located in Grorud in Oslo, only 15 minutes from Oslo's city center. The facility is the company's first data center in Oslo and has been operational since 2005.
3.91 miles SSC Forskningsparken Oslo (Oslo Science Park)
4.63 miles Basefarm Oslo OSL5
4.67 miles Orange: Lorenskog OSL5
Orange Business OSL5 Data Center is located in Rasta in Oslo. The facility is the company's second data center in Norway and has been in operation since November 2017.
4.82 miles Blix: NR5 Oslo
Blix Solutions is building a new data center in Oslo, Norway, which is scheduled to open around July 2025.
6.24 miles STACK OSL02
12.25 miles Green Mountain OSL1-Enebakk
Green Mountain is building a data center campus on a 75,000 m2 (800,000 ft2) area. The OSL1-Enebakk data center campus is located in Enebakk, just 20 km outside Oslo, the capital of Norway.
12.28 miles Green Mountain: OSL1 DC2
The second building (DC2) of Green Mountain's OSL1-Enebakk campus was launched in 2021.
12.30 miles Green Mountain: OSL1 DC4
In April 2023, Green Mountain announced another expansion at its OSL1-Enebakk site (previously known as DC3-Oslo).
12.38 miles Green Mountain: OSL1 DC3
The third building (DC3) of Green Mountain's OSL1-Enebakk campus was launched in December 2022. The 10,000 sqm (107,700 sq ft) three-story colocation facility was first announced in late 2021.
12.41 miles Green Mountain: OSL1 DC5
Green Mountain is developing another three-story building at its Enebakk campus. The new facility will span 9,600 m² (103,335 sq ft).
13.92 miles STACK OSL03C
13.97 miles STACK OSL03D
STACK OSL03D is the newly built data center on its OSL03 Campus. The building spans an area of 1800 sqm of white space.
13.97 miles STACK OSL03B
14.03 miles STACK OSL03 Campus
STACK's OSL03 campus, situated in Fetsund, south of Oslo, spans two hectares and runs on 100% renewable energy.

Fujitsu Oslo Data Center Photos (See all)

Operating Company

Operated by:
9
Facilities
1
Markets
108MW
Megawatts

News (See all)