Keel Infrastructure: Sharon, PA

Latest Podcast 201 Clark St
DecommissionedPlanned
Future facility in planning stagefacility with some areas decommissioned
Operated by:

Keel Infrastructure: Sharon, PA

Site was first built in 2026 and has expansions through 2028
PUE: 1.15
Utility Provider: Penn Power
Ownership: Keel Infrastructure owns the building.
Lot Size: 17 acres

Keel Infrastructure, formerly Bitfarms, owns a former pipe-mill site on Clark Street in Sharon, Mercer County, next to the old Westinghouse Sharon plant. Mawson Infrastructure mined Bitcoin here from 2022 until early 2024, and Bitfarms ran its own mining at the site from January 2025 until Keel ended its U.S. mining in June 2026. Keel now plans two data center buildings and a new substation in three phases. One state DEP permit remains, and Keel ties the start of service to signing a tenant.

Site History

  • June 2026: Keel ceases Bitcoin mining at the site.
  • March 2026: Keel signs a four-year electricity supply agreement.
  • October 2025: Keel buys the site.
  • January 2025: Bitfarms begins mining at the site.
  • August 2024: Bitfarms takes control of the site under a lease.

Map and Nearby Locations

201 Clark St
Keel Infrastructure Sites
Nearby Facilities

Keel Infrastructure: Sharon, PA Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Keel Infrastructure: Sharon, PA

Distance Site About
5.49 miles Crane: Hubbard (Project Milo)
Crane Data Centers' Project Milo was a proposed data center campus on the former Deer Creek Golf Course in Hubbard, Ohio, dropped before voters banned data centers in 2026.
10.71 miles Prime PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.76 miles Edge 1343: Youngstown
Edge 1343 runs an on-site data center and carrier hotel inside its coworking building at 1343 Belmont Avenue in Youngstown, Ohio.
12.30 miles Oppidan: McDonald
Oppidan proposes a multi-building data center campus on the former McDonald Steel and U.S. Steel mill land off Ohio Avenue in McDonald, Ohio.
13.61 miles BitDeer: Niles, Ohio
Bitdeer is developing a bitcoin mining campus on the site of the former Niles Generating Station in Niles, Ohio.
16.42 miles Saadia: Union Township, PA
Saadia Holdings proposes a small data center off Route 422 near the Shenango River in Union Township, Lawrence County.
18.09 miles Stonebridge: Lawrence County
Maryland-based developer Stonebridge Associates has proposed a $15 billion, 16-building hyperscale data center campus on a 569-acre site in Lawrence County, Pennsylvania.
19.95 miles Bristolville 25 Developer: Lordstown

Operating Company

Operated by:

Founded in 2017, Bitfarms is a global Bitcoin self-mining company, running vertically integrated mining operations with onsite technical repair, proprietary data analytics and Company-owned electrical engineering and installation services to deliver high operational performance and uptime.

Operationally, Bitfarms has a diversified production platform with five industrial scale facilities located in Québec, one in Washington state, one in Argentina, and one in Paraguay. Each facility is over 99% powered with environmentally friendly hydro power and secured with long term power contracts. Bitfarms is currently the only publicly traded pure-play crypto mining company audited by a Big Four accounting firm.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read LS Electric Wins $138m Switchgear Order for Bloom Fuel Cells at Pennsylvania Data Center
South Korean electrical equipment maker LS Electric has secured a 185.3 billion won ($138.5m) order from Bloom Energy to supply switchgear and distribution transformers for fuel cells at a Pennsylv...

LS Electric Wins $138m Switchgear Order for Bloom Fuel Cells at Pennsylvania Data Center

October 14, 2026 Pennsylvania

South Korean electrical equipment maker LS Electric has secured a 185.3 billion won ($138.5m) order from Bloom Energy to supply switchgear and distribution transformers for fuel cells at a Pennsylvania data center. Deliveries of the 38kV equipment are expected between April and July next year....

Read more
Read Google Signs 20-Year Nuclear PPA With Constellation For 890MW In PJM
[Google](https://baxtel.com/data-centers/google) will buy 890 MW of new nuclear output from Constellation Energy under a 20-year power purchase agreement covering 11 reactors across the PJM Interco...

Google Signs 20-Year Nuclear PPA With Constellation For 890MW In PJM

October 07, 2026 Google

Google will buy 890 MW of new nuclear output from Constellation Energy under a 20-year power purchase agreement covering 11 reactors across the PJM Interconnection, the companies announced on Oct. 6. Constellation will spend more than $4.3 billion upgrading reactors in Illinois, Pennsylvania and...

Read more
Read 100MW Data Center Proposed In Allentown, Pennsylvania
A 100MW data center is being proposed in Allentown, Pennsylvania. J.G. Petrucci has submitted plans for a 146,000 sq ft (13,565 sqm) facility and on-site substation at 1024 N. Bradford Street. Cons...

100MW Data Center Proposed In Allentown, Pennsylvania

August 20, 2026 Pennsylvania

A 100MW data center is being proposed in Allentown, Pennsylvania. J.G. Petrucci has submitted plans for a 146,000 sq ft (13,565 sqm) facility and on-site substation at 1024 N. Bradford Street. Construction could begin in early 2027, with the facility potentially operational later that year. The...

Read more
Read PPL’s Advanced-Stage Data Center Pipeline Reaches 31.8GW
Pennsylvania utility PPL Corporation’s advanced-stage data center pipeline grew to 31.8GW in Q2, up from 28.3GW in Q1. Of the total, 11GW is covered by signed electric service agreements, while 6.5...

PPL’s Advanced-Stage Data Center Pipeline Reaches 31.8GW

August 10, 2026 Pennsylvania

Pennsylvania utility PPL Corporation’s advanced-stage data center pipeline grew to 31.8GW in Q2, up from 28.3GW in Q1. Of the total, 11GW is covered by signed electric service agreements, while 6.5GW is already under construction. “Signed data center agreements with PPL Electric Utilities...

Read more
Read Ransom Township Could Host 930-Acre Data Centre Campus
Developer Mudiita Infra is planning a 930-acre data centre development in Ransom Township, Pennsylvania. Its affiliate, Mudiita Land Venture, acquired 530 acres south of Ransom Road and west of Sou...

Ransom Township Could Host 930-Acre Data Centre Campus

July 25, 2026 Pennsylvania

Developer Mudiita Infra is planning a 930-acre data centre development in Ransom Township, Pennsylvania. Its affiliate, Mudiita Land Venture, acquired 530 acres south of Ransom Road and west of South Keyser Avenue from KF Real Estate for $2.4 million, according to a deed filed with Lackawanna...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.