Jet.AI: Winnipeg Campus

Latest Podcast Arnould Rd
OperationalProspective ExpansionWithdrawn
Fully operational facility with prospective expansion planned and some phases cancelled
Operated by:

Jet.AI: Winnipeg Campus

Short Code: Midwestern Project
Site was first built in 2025 and has expansions through 2026
Utility Provider: Manitoba Hydro
Lot Size: 395 acres
░░░ Request Dataset MW
Operational Power

Site History

  • 2022: Blockharvest signs a Manitoba Hydro service agreement for a cryptocurrency operation on the land; Hydro terminates it in November 2022.
  • 2025-06: Jet.AI and Consensus Core form a joint venture for the Manitoba project.
  • 2025-12: Jet.AI unveils plans for a hyperscale campus with on-site natural gas turbines.
  • 2026-03: The joint venture applies for a Manitoba Hydro transmission load study.
  • 2026-06-04: Premier Wab Kinew says the province will not support the hyperscale data centre.
  • 2026-07: Consensus Core renames itself Infinite Compute and scales back its Manitoba plans.

Project Profile

  • Developers: Infinite Compute (formerly Consensus Core Technologies), with Jet.AI as a minority partner
  • Site: about 395 acres bounded by PTH 59, PR 405, Arnould Road and Mondor Road, RM of Ritchot
  • Infrastructure: 115 kV transmission tap, a 2 MVA transformer and a package substation rated for 15 MW
  • Neighbours: a TC Energy natural gas compressor station and a Manitoba Hydro 115 kV line
  • Status: the proof-of-concept facility is idle; the province refused the hyperscale phase

Map and Nearby Locations

Arnould Rd
Jet.AI Sites
Nearby Facilities

Jet.AI: Winnipeg Campus Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Jet.AI: Winnipeg Campus

Distance Site About
8.50 miles Education Data CenterInterested in this information?Contact us
University research computing centre in Winnipeg. Waste heat warms nearby campus buildings.
10.17 miles Fintech Data CenterInterested in this information?Contact us
Enterprise data centre in east Winnipeg, completed in 2012.
10.66 miles Equinix Winnipeg WI1
Equinix WI1 is a two-storey Tier III data centre on Waverley Street in south Winnipeg. MTS built it as MTS Data Centres Waverley in 2015, and Equinix acquired it from Bell in 2020.
13.03 miles Les.net: YWG1
Les.net's YWG1 is a small carrier-neutral colocation facility at the company's head office on Portage Avenue East in downtown Winnipeg.
13.15 miles Les.net YWG2
Les.net's YWG2 colocation facility occupies Suite 201 on the second floor of the Somerset Building in downtown Winnipeg. It hosts a node of the Manitoba Internet Exchange (MBIX).
13.15 miles Manitoba Hydro Telecom Data Centre
Manitoba Hydro Telecom's data centre occupies the 24th-floor penthouse of Manitoba Hydro Place in downtown Winnipeg. The room hosts carrier networks and a Manitoba Internet Exchange node.
13.17 miles XGSC: Winnipeg
XGSC's Global Server Centre is a carrier-neutral colocation facility on the fifth floor of the Grain Exchange Building, downtown Winnipeg's main carrier hotel. It hosts the primary node of the Manitoba Internet Exchange (MBIX).
13.17 miles XGSC: Global Server Centre
XGSC's Global Server Centre is a carrier-neutral colocation facility on the fifth floor of the Grain Exchange Building, downtown Winnipeg's main carrier hotel. It hosts the primary node of the Manitoba Internet Exchange (MBIX).
13.23 miles Les.net: YWG4
Les.net's YWG4 is a colocation suite on the eighth floor of the Air Canada Building at 355 Portage Avenue in downtown Winnipeg. It hosts a Manitoba Internet Exchange switch.
13.24 miles Enterprise Data CenterInterested in this information?Contact us
Enterprise data centre in downtown Winnipeg, in service since the 1980s.
19.45 miles Global ParkInterested in this information?Contact us
BUZZ HPC, the AI cloud subsidiary of HIVE Digital Technologies, runs an NVIDIA B200 GPU cluster in Bell Canada's Bell AI Fabric data centre in Manitoba.
19.45 miles Cerebras: Manitoba
Cerebras Systems leases AI compute capacity from Bell Canada's Bell AI Fabric network in Manitoba.
19.45 miles Bell Canada: Winnipeg
Bell Canada is converting the former Merit Functional Foods plant at 400 Goldenrod Drive in the RM of Rosser, within CentrePort Canada just outside Winnipeg, into an AI data centre for its Bell AI Fabric network.

Jet.AI: Winnipeg Campus Data Center Photos See all

Jet.AI’s 350-acre land parcel for new Manitoba AI campus
Source: Jet.AI

Operating Company

Operated by:

Jet.AI operates in two segments, Software and Aviation, respectively. The Software segment features the B2C CharterGPT app and the B2B Jet.AI Operator platform. The CharterGPT app uses natural language processing and machine learning to improve the private jet booking experience. The Jet.AI operator platform offers a suite of stand-alone software products to enable FAA Part 135 charter providers to add revenue, maximize efficiency, and reduce environmental impact. The Aviation segment features jet aircraft fractions, jet card, on-fleet charter, management, and buyer’s brokerage.

0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?