Site: Manitoba Hydro Telecom Data Centre

Company: Manitoba Hydro Telecom
Metro: Winnipeg
Country: Canada
Region: North America
Region: Americas
Address:

The site was commissioned in 2010.

Power:


  • 360 Portage Ave. is a LEED® Platinum certified facility
  • 100% uptime since operations began in 2010
  • Two physically diverse substations with an auto switch for transitioning
  • Step down transformer at 360 Portage Ave.
  • Diesel Generator with three 1170 litre tanks in diverse locations
  • UPS to handle transition to generator
  • Manitoba Hydro is a renewable energy source, with diverse hydro-electric generating stations in Manitoba.

Cooling:


  • Four standalone Leibert AC units in the space; two 7.5 ton units & two 10 ton units
  • AC is vented to a separate cooling tower system on the roof
  • AC units are serviced monthly with no interruptions to the cooling system
  • The Leiberts are shut down individually when serviced
  • The air is re-circulated in the building and filtered with Merv 8 Filters on the Leiberts

Map and Nearby Locations:

360 Portage Ave, Winnipeg, MB R3C 0G8, Canada

SITES within 15 miles of Manitoba Hydro Telecom Data Centre

Show SqM



Distance Site name SqFt MW
0.18 miles Les.net YWG2
0.50 miles Exchange Group - Global Server Center
0.50 miles TeraGo Winnipeg 0.30