Manitoba Hydro Telecom Data Centre

Latest Podcast 360 Portage Ave
Operational
Fully operational facility

Manitoba Hydro Telecom Data Centre

Year Built: 2010
Utility Provider: Manitoba Hydro
░░░ Request Dataset MW
Operational Power

Site History

  • 2010: Manitoba Hydro Telecom opens the data centre in the new Manitoba Hydro Place.
  • 2018-2019: The Manitoba Internet Exchange adds a switch here.
  • 2022: MHT stops selling telecom services commercially and refocuses on Manitoba Hydro's own needs.
  • 2025: The provincial budget announces that MHT will resume operations.

Project Profile

  • Operator: Manitoba Hydro Telecom, a division of Manitoba Hydro International
  • Building: Manitoba Hydro Place, a LEED Platinum office tower; the data centre occupies the 24th-floor penthouse
  • Power: two physically diverse substation feeds with automatic transfer, a step-down transformer, UPS and a diesel generator
  • Cooling: four Liebert units (two 7.5-ton and two 10-ton)
  • Services: locked third, half and full cabinets

Map and Nearby Locations

360 Portage Ave ( Suite 2441 )
Manitoba Hydro Telecom Sites
Nearby Facilities

Manitoba Hydro Telecom Data Centre Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Manitoba Hydro Telecom Data Centre

Distance Site About
0.11 miles Les.net: YWG4
Les.net's YWG4 is a colocation suite on the eighth floor of the Air Canada Building at 355 Portage Avenue in downtown Winnipeg. It hosts a Manitoba Internet Exchange switch.
0.12 miles Enterprise Data CenterInterested in this information?Contact us
Enterprise data centre in downtown Winnipeg, in service since the 1980s.
0.18 miles Les.net YWG2
Les.net's YWG2 colocation facility occupies Suite 201 on the second floor of the Somerset Building in downtown Winnipeg. It hosts a node of the Manitoba Internet Exchange (MBIX).
0.50 miles Les.net: YWG1
Les.net's YWG1 is a small carrier-neutral colocation facility at the company's head office on Portage Avenue East in downtown Winnipeg.
0.53 miles XGSC: Winnipeg
XGSC's Global Server Centre is a carrier-neutral colocation facility on the fifth floor of the Grain Exchange Building, downtown Winnipeg's main carrier hotel. It hosts the primary node of the Manitoba Internet Exchange (MBIX).
0.53 miles XGSC: Global Server Centre
XGSC's Global Server Centre is a carrier-neutral colocation facility on the fifth floor of the Grain Exchange Building, downtown Winnipeg's main carrier hotel. It hosts the primary node of the Manitoba Internet Exchange (MBIX).
4.85 miles Equinix Winnipeg WI1
Equinix WI1 is a two-storey Tier III data centre on Waverley Street in south Winnipeg. MTS built it as MTS Data Centres Waverley in 2015, and Equinix acquired it from Bell in 2020.
4.89 miles Fintech Data CenterInterested in this information?Contact us
Enterprise data centre in east Winnipeg, completed in 2012.
5.66 miles Education Data CenterInterested in this information?Contact us
University research computing centre in Winnipeg. Waste heat warms nearby campus buildings.
6.31 miles Cerebras: Manitoba
Cerebras Systems leases AI compute capacity from Bell Canada's Bell AI Fabric network in Manitoba.
6.31 miles North CampusInterested in this information?Contact us
BUZZ HPC, the AI cloud subsidiary of HIVE Digital Technologies, runs an NVIDIA B200 GPU cluster in Bell Canada's Bell AI Fabric data centre in Manitoba.
6.31 miles Bell Canada: Winnipeg
Bell Canada is converting the former Merit Functional Foods plant at 400 Goldenrod Drive in the RM of Rosser, within CentrePort Canada just outside Winnipeg, into an AI data centre for its Bell AI Fabric network.
13.15 miles Jet.AI: Winnipeg Campus
Jet.AI and Infinite Compute (formerly Consensus Core) are developing a data centre campus north of Île-des-Chênes, about 20 km south of Winnipeg. A small proof-of-concept facility sits on the site. Manitoba's premier refused the proposed hyperscale campus in June 2026.

Operating Company

0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?